Fort Peck Unit 2 Major Rehabilitation

Award Notice Posted

Solicitation number
W9128F12R0016
Agency
Awarded
to Voith Hydro Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
W9128F12C0094 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

REMINDER: SITE VISIT MAY 22 AND 23
Despite potential delays in posting the official Request For Proposal (RFP) No. W9128F-12-R-0016, the site visit WILL still be held. Questions may or may not be addressed depending on details provided in the official RFP package. The 90% specification and drawing package that was posted on March 16, 2012 should provide guidance as to what will be expected with the official RFP package. To confirm your attendance for the proposal meeting and site visit, contact Shelby Whitmer at (406) 526-3431.

Update #1 ·

15 March 2012
Project Information
Solicitation Number W9128F-12-R-0016
This is a 90% draft specification and drawing package for potential contractors to review for the rehabilitation of the Unit 2 hydroelectric generator at Fort Peck, Montana. The work shall include engineering and design to optimize power, performance and efficiency of the turbine generator. The existing unit, rated 19211 kVA @ 0.95 p.f., was placed into initial operation in 1943 and is currently in daily operation. The existing turbine is a vertical axis Francis runner rated 20,000hp at a rated head of 140 feet operating at a speed of 163.6 rpm. The new turbine will be optimized to specified peak performance at approximately 190 ft of head. The contractor shall furnish and install a new Francis turbine runner, a generator restack and rewind, and refurbishment of the wicket gates, linkages, operating ring, servo, headcover, staying, thrustbearing, etc. Turbine model and generator efficiency testing will be required on completion of the rehabilitation. This work will require coordination with the Corps of Engineers staff at the Fort Peck Power Plant and Corps of Engineers Construction Division for all activities related to construction. Estimated construction time is 560 days. The contractor will also have tight scheduling coordination to construct during planned seasonal outages.
The intent of this posting is to receive feedback from potential contractors to have concise documents for proposal of this intricate work. Submission due no later than 4 April 2012, 3pm central standard time.

Submit responses to:
U.S. Army Corps of Engineers, Omaha District
ATTN: Brandy R. Eaves (CECT-NWO-C)
1616 Capitol Avenue
Omaha, NE 68102
brandy.r.eaves@usace.army.mil

Questions on Specifications should be addressed to:
U.S. Army Corps of Engineers, Omaha District
ATTN: John Palensky (CENWO-PM-C)
1616 Capitol Avenue
Omaha, NE 68102
john.a.palensky@usace.army.mil

Notice history

Notice Type Posted
Fort Peck Unit 2 Major Rehabilitation Latest Award Notice
This notice Award Notice
Fort Peck Unit #2 Rehabilitation Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity