Notice text

4 versions

Update #4 · Latest ·


Amendment #3


Under ITEM 8 CLEAN AND RECOAT THE HULL, the primer to be used is hereby changed from a 10 mils dry film thickness of ECOMAX BI-LV to an 8 mils dry film thickness of Umeguard MP primer.


Update #3 ·


Please see the additional questions and answers and clarifications:


Questions 10/22/2009


1. Work Item 2: Please advise what heat type/source the tug has (for electric usage pricing).


- Answer


Refer to Part III of this amendment for electrical service requirements for the Tug. Among other things, this electrical service will provide power to the diesel boiler used to heat the Tug. The power draw of the boiler is approximately 40 Watts during startup, minimal at all other times. Refer to Part II of this amendment for the requirements for heating of the Tug while the fuel tanks are being cleaned.


2. Work Item 7: Please advise what the Fairwater cone material shall be.


- Answer


Per the List of Materials on Drawing YTB799-203-4372254 Propeller, Fairwater and Cap, the Fairwater cone is to be stainless steel.


 


Part II. Modification to ITEM 11 CLEANING OF FUEL TANKS (OPTIONAL)


Add the following text as a new paragraph just before the word "NOTE:"


 


The Tug Cheraw uses a diesel fired boiler for heat, which is normally supplied from the day tank. If this item is awarded, the Contractor shall make provisions for heating of the Tug during the period of time that fuel is unavailable from the day tank. Such provisions may include running a temporary fuel line to the boiler from the Contractor's fuel storage, or providing heat by an alternate method acceptable to the government.


 


Part III. Modifications to Special Provision SP-12 SERVICES TO BE FURNISHED BY THE CONTRACTOR WITHOUT FURTHER COST


1. Renumber the subparagraphs as follows: SP-13.1 should be SP-12.2, SP-12.2 should be SP-12.3, SP-12.3 should be SP-12.4.


2. Replace the last sentence of renumbered subparagraph 12.2 with the following text: The tug will require 100 amps at 440 VAC.


Update #2 ·

The Purpose of this amendment is to answer questions submitted 10/16/2009 and 10/19/2009 and to correct statement "Drawings are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/," at the end of the solicitation to add Safety Specifications.

Part I. Questions 10/16/2009

1. ABS Survey - Work Item 2: Is the fee for this survey to be covered by your agency or Contractor? Is this vessel ABS-classed? Or do you just want a "Statement of Fact" survey? What all shall their survey cover?

-Answer "The fee for the ABS survey is not to be included in the dry-dock contract."

2. Hull recoat - Work Item 8: please clarify what constitutes the "hull" for this. Up to a certain line? Or all the way up to the top of the bulwarks?

- Answer "The blasting and painting of the hull shall be from the deep load line to the keel, with the deep load line cut in at 14 ft. Also, the Contractor shall repaint all draft marks, legends, and plimsols, with one coat of white marine enamel paint."

3. Fuel transfer - Work Item 11: is there somewhere on board the vessel that the 8000 gallons of fuel shall be transferred to? Or shall Contractor store it - to put back on the vessel? Or shall that fuel be replaced with new? By your agency or Contractor?

-Answer "The Contractor shall be responsible for off-vessel storage all transferred fuel, then filter and return it to the tanks upon acceptance by the government of this item of work as complete."

4. Fuel tanks - Work Item 11: please clarify what is meant by the term "siamesed together".

- Answer "This is an error in the scope of work and refers to a different vessel. Delete the sentence 'The No. 2 center and starboard tanks are siamesed together,' and correct the reference to the 'Chetek' to read 'Cheraw.'"

5. Fathometer - Work Item 15: we have been informed that the Furuno model ED222 is a "legacy" item - for which parts will no longer be made after 2010; and that their model RD30 is replacing that atquite a price reduction. Please advise if you still want Contractor to include the ED222 in pricing.

- Answer "Please bid the item listed in the solicitation."

Questions 10/19/2009

1. Looking at your draft in the spec and due to the time you want to dry dock your Tug we would have to put you in our small dock. If you can give me your bow and stern drafts of what you may be when you would get her. It would be great to know due to the water level we are at 14’-3” above our blocks but with the declivity you will to close with your bow. So if you can supply me with this information, we will decide if we should bid on your project.

-Answer "The Contractor shall be responsible for providing a docking facility with sufficient draft for the vessel. With ballast tanks empty and minimal fuel aboard, the minimum draft requirements for the vessel are approximately 10 ft at bow and 14 ft at stern. The stern draft requirement can be reduced to approximately 13 ft by taking on ballast in the bow, but this increases the bow draft requirement. A deck load may be required to achieve a 13 ft stern draft, and shall be supplied by the Contractor if needed." 2. Item 8 CLEAN AND RECOAT THE HULL: Does the entire hull get painted or just up to the water line? Do fenders have to be removed? - Answer "Please refer to the answer to

Question 2 from 10/16/2009. No fenders will need to be removed to perform this work." 3. Item 13 BEARING LINER RENEWAL (OPTIONAL): Does the liner have to be one piece or can it be made out of two pieces? - Answer "The liner shall be one piece." Questions 10/20/2009 1. ITEM 10 CLEANING OF FUEL TANKS (OPTIONAL) Does the 8000 gals of fuel get disposed of? - Answer "Please refer to the answer to Question 3 from 10/16/2009. Note that CLEANING OF FUEL TANKS (OPTIONAL) is ITEM 11, not ITEM 10." Part II. Correct final line of Solicitation

"Drawings are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/," is hereby changed to "Drawings and Safety Specifications are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/."

Update #1 ·

The U.S. Army Corps of Engineers, Buffalo District is seeking to award one firm-fixed price contract for the inspection and possible repair of the Tugboat Cheraw. The inspection/repair process awards one single contract that requires the contractor to properly dry dock and inspect the Tugboat. This commercial acquisition shall be open to small business offerors only. This solicitation is small business set aside and there will not be a formal public bid opening. Contractor will bid on base contract line item; and options, for more details please see Attachment #3 "Special Provisions" Attachment #3.  The Government will evaluate offers for award and evaluation of the options will not obligate the Government to exercise the options in accordance with FAR 52.217-5.  The tugboat shall be available on 20 November 2009 and all work must be completed by 17 March 2010.  Project shall comply with all U.S. standards. Evaluation factors will be based on best value.  OFFERORS ARE ADVISED AN AWARD MAY BE MADE WITHOUT DISCUSSION OR ANY CONTACT CONCERNING THE PROPOSAL RECEIVED. Emailed proposals will be sent to kenneth.e.mackay@usace.army.mil by 4:00 PM on 27 October 2009 to the U.S. Corps of Engineers Office. The solicitation documents will only be available via the Federal Business Opportunity Website at www.fbo.gov  Hard copies will not be available. No written or fax requests will be accepted. It is the contractor's responsibility to monitor FBO for any amendments. Registration requirements (applicable to US firms only, as required by DFARS 204.7300), all US contractors must be registered in the Department of Defense Central Contractor Registration (CCR) database. Award will be made as a whole to one Offeror. Direct contracting questions to the Contract Specialist, Kenneth Mackay, by fax (716) 879-4353, by phone (716) 879-4138, or by e-mail at Kenneth.e.mackay@usace.army.mil.  Drawings are located at ftp://ftp.usace.army.mil/pub/lrb/Tug%20Cheraw%20Drawings/


This acquisition is subject to the Service Contract Act.  See wdol.gov for the wage determination.  The wage deterimination is WD 05-2415 (Rev.-7) dated 5 Oct 2009   


 

Files

Notice history

Notice Type Posted
Repair and drydock Tug Cheraw Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity