Distributed Common Ground System – Navy, Increment 2 (DCGS-N Inc 2) RFI

Closed Pre-Solicitation Posted

Solicitation number
SPAWAR_Headquarters_MKTSVY_15F2B2
Agency
Naval Information Warfare Systems Command Department of the Navy, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
70 Information Technology Equipment (Incld Firmware) Software,Supplies& Support Equipment

Notice details come from SAM.gov. Updated .

Notice text

14 versions

Update #14 · Latest ·

RESPONSES TO THIS NOTICE ARE DUE BY 11:59pm CENTRAL, WHICH SUPERSEDES THE 11:59pm EASTERN RESPONSE TIME SHOWN IN THE GENERAL INFORMATION SECTION ABOVE. As a reminder, the response time identified in the Solicitation Instruction to offerors is the final authority of when responses are due. _____________________________________________________________________ UPDATE: 02/10/2020 -- Update: The DCGS

RFI will close on 28 Feb 2020. The

Government may schedule meetings with

potential vendors after the closing date of

the RFI. Please note, the requirement for a

ROM has been removed from the RFI.--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

01/28/2020 -- Q&As doc updated. See

bolded text in the Attached document for

details.------------------------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

------------------------

12/20/2019 -- Q&As doc updated, Survey

expiration date extended to 28 Feb 2020.

11/14/2019 -- This Request for Information

(RFI) is hereby amended to request that

interested parties provide a rough order

magnitude (ROM) estimate as an

attachment to their submission. Details are

addressed in the attached RFI Amendment

#5.----------------------------------------------

--------------------------------------------------

--------------------------------------------------

10/01/2019 -- This Request for Information

(RFI) is amended due the fact that some

language was inadvertently left of

paragraph 4.1, as follows: ----------------

"The Government may not be able to meet

with every company based on time and

schedule constraints. Additionally, the

Government reserves the right to decline

meetings with any company." ----------------

We apologize for any confusion regarding

this matter. (See details in the attached RFI

Amendment 4 entitled: "DCGS-N INC

_2019_RFI_AMEND4_FINAL").----------------

Also, please note that the Questions and

Answers (Q&A) document has been

updated, reference all bolded text for

updates in the Attached Q&A Document

entitled "QA_DOC_UPDATE_DCGS-

N_INC2_10-01-2019"--------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

09/26/2019 -- This request for information

(RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Army’s AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #13 ·

RESPONSES TO THIS NOTICE ARE DUE BY 11:59pm CENTRAL, WHICH SUPERSEDES THE 11:59pm EASTERN RESPONSE TIME SHOWN IN THE GENERAL INFORMATION SECTION ABOVE. As a reminder, the response time identified in the Solicitation Instruction to offerors is the final authority of when responses are due. _____________________________________________________________________ 01/28/2020 -- Q&As doc updated. See

bolded text in the Attached document for

details.------------------------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

------------------------

12/20/2019 -- Q&As doc updated, Survey

expiration date extended to 28 Feb 2020.

11/14/2019 -- This Request for Information

(RFI) is hereby amended to request that

interested parties provide a rough order

magnitude (ROM) estimate as an

attachment to their submission. Details are

addressed in the attached RFI Amendment

#5.----------------------------------------------

--------------------------------------------------

--------------------------------------------------

10/01/2019 -- This Request for Information

(RFI) is amended due the fact that some

language was inadvertently left of

paragraph 4.1, as follows: ----------------

"The Government may not be able to meet

with every company based on time and

schedule constraints. Additionally, the

Government reserves the right to decline

meetings with any company." ----------------

We apologize for any confusion regarding

this matter. (See details in the attached RFI

Amendment 4 entitled: "DCGS-N INC

_2019_RFI_AMEND4_FINAL").----------------

Also, please note that the Questions and

Answers (Q&A) document has been

updated, reference all bolded text for

updates in the Attached Q&A Document

entitled "QA_DOC_UPDATE_DCGS-

N_INC2_10-01-2019"--------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

09/26/2019 -- This request for information

(RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Army’s AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #12 ·

RESPONSES TO THIS NOTICE ARE DUE BY 11:59pm CENTRAL, WHICH SUPERSEDES THE 11:59pm EASTERN RESPONSE TIME SHOWN IN THE GENERAL INFORMATION SECTION ABOVE. As a reminder, the response time identified in the Solicitation Instruction to offerors is the final authority of when responses are due. _____________________________________________________________________ 12/20/2019 -- Q&As doc updated, Survey

expiration date extended to 28 Feb 2020.

11/14/2019 -- This Request for Information

(RFI) is hereby amended to request that

interested parties provide a rough order

magnitude (ROM) estimate as an

attachment to their submission. Details are

addressed in the attached RFI Amendment

#5.----------------------------------------------

--------------------------------------------------

--------------------------------------------------

10/01/2019 -- This Request for Information

(RFI) is amended due the fact that some

language was inadvertently left of

paragraph 4.1, as follows: ----------------

"The Government may not be able to meet

with every company based on time and

schedule constraints. Additionally, the

Government reserves the right to decline

meetings with any company." ----------------

We apologize for any confusion regarding

this matter. (See details in the attached RFI

Amendment 4 entitled: "DCGS-N INC

_2019_RFI_AMEND4_FINAL").----------------

Also, please note that the Questions and

Answers (Q&A) document has been

updated, reference all bolded text for

updates in the Attached Q&A Document

entitled "QA_DOC_UPDATE_DCGS-

N_INC2_10-01-2019"--------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

09/26/2019 -- This request for information

(RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Army’s AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #11 ·

RESPONSES TO THIS NOTICE ARE DUE BY 11:59pm CENTRAL, WHICH SUPERSEDES THE 11:59pm EASTERN RESPONSE TIME SHOWN IN THE GENERAL INFORMATION SECTION ABOVE. As a reminder, the response time identified in the Solicitation Instruction to offerors is the final authority of when responses are due. _____________________________________________________________________ 11/14/2019 -- This Request for Information

(RFI) is hereby amended to request that

interested parties provide a rough order

magnitude (ROM) estimate as an

attachment to their submission. Details are

addressed in the attached RFI Amendment

#5.----------------------------------------------

--------------------------------------------------

--------------------------------------------------

10/01/2019 -- This Request for Information

(RFI) is amended due the fact that some

language was inadvertently left of

paragraph 4.1, as follows: ----------------

"The Government may not be able to meet

with every company based on time and

schedule constraints. Additionally, the

Government reserves the right to decline

meetings with any company." ----------------

We apologize for any confusion regarding

this matter. (See details in the attached RFI

Amendment 4 entitled: "DCGS-N INC

_2019_RFI_AMEND4_FINAL").----------------

Also, please note that the Questions and

Answers (Q&A) document has been

updated, reference all bolded text for

updates in the Attached Q&A Document

entitled "QA_DOC_UPDATE_DCGS-

N_INC2_10-01-2019"--------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

09/26/2019 -- This request for information

(RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Army’s AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #10 ·

RESPONSES TO THIS NOTICE ARE DUE BY 11:59pm CENTRAL, WHICH SUPERSEDES THE 11:59pm EASTERN RESPONSE TIME SHOWN IN THE GENERAL INFORMATION SECTION ABOVE. As a reminder, the response time identified in the Solicitation Instruction to offerors is the final authority of when responses are due. _____________________________________________________________________ 10/01/2019 -- This Request for Information

(RFI) is amended due the fact that some

language was inadvertently left of

paragraph 4.1, as follows: ----------------

"The Government may not be able to meet

with every company based on time and

schedule constraints. Additionally, the

Government reserves the right to decline

meetings with any company." ----------------

We apologize for any confusion regarding

this matter. (See details in the attached RFI

Amendment 4 entitled: "DCGS-N INC

_2019_RFI_AMEND4_FINAL").----------------

Also, please note that the Questions and

Answers (Q&A) document has been

updated, reference all bolded text for

updates in the Attached Q&A Document

entitled "QA_DOC_UPDATE_DCGS-

N_INC2_10-01-2019"--------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

09/26/2019 -- This request for information

(RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Army’s AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #9 ·

10/01/2019 -- This Request for Information (RFI) is amended due the fact that some

language was inadvertently left of

paragraph 4.1, as follows: ----------------

"The Government may not be able to meet

with every company based on time and

schedule constraints. Additionally, the

Government reserves the right to decline

meetings with any company." ----------------

We apologize for any confusion regarding

this matter. (See details in the attached RFI

Amendment 4 entitled: "DCGS-N INC

_2019_RFI_AMEND4_FINAL").----------------

Also, please note that the Questions and

Answers (Q&A) document has been

updated, reference all bolded text for

updates in the Attached Q&A Document

entitled "QA_DOC_UPDATE_DCGS-

N_INC2_10-01-2019"--------------------------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

09/26/2019 -- This request for information

(RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Armys AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #8 ·

09/26/2019 -- This request for information (RFI) is hereby amended to extend the

closing date through 31 December 2019 and

to update paragraph 4.2.1 Proprietary Data

Protection Agreements (PDPA) with an

additional Government Support Contractor

for establishing a PDPA (See details in the

attached RFI Amendment 3 entitled: "DCGS-

N INC 2_2019_RFI_AMEND3_FINAL")--------

--------------------------------------------------

--------------------------------------------------

--------------------------------------------------

-------

09/11/2019 - This RFI is amended to add

updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Armys AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #7 ·

09/11/2019 - This RFI is amended to add updated Questions and Answers (Q&As) see

attached, the new Q&A is highlighted in

Bold Text. --------------------------------------

--------------------------------------------------

--------------------------------------------------

08/19/2019 - This RFI is amended to add

updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Armys AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #6 ·

08/19/2019 - This RFI is amended to add updated Questions and Answers (Q&A) and

to provide a complete set of Acronyms in

support of the Requirements Traceability

Matrix. For the updated Q&A see attached

file dated 08/08/2019. ****************

If you are interested in obtaining a copy of

the Acronym list and you have a fully

executed Non-Disclosure Agreement in

place with this Office, please email your

request directly to the Contract Specialist

listed in this announcement. The

information will be sent to you through the

U.S. Armys AMRDEC Safe Access File

Exchange (SAFE). If you do not have an

NDA on file with this office, please fill

complete and submit IAW the original

attached RFI Documentation.

***********************************

***********************************

********************** 06/18/2019 -

RFI is amended to add

updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019

-----------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #5 ·

06/18/2019 - RFI is amended to add updated Questions and Answers (Q&As) and

to provide complete set of Reference Tables

from the Requirements Traceability Matrix

(RTM) -- see attached Files dated

06/18/2019 ------------------------------------

--------------------------------------------------

---------------------------------------

05/08/2019 - RFI Amended to remove the

words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #4 ·

05/08/2019 - RFI Amended to remove the words "not including enclosures" from

Paragraph 4.2 "FORMAT", second sentence.

See Attached updated File: DCGS-N INC

2_2019_RFI__AMEND2_FINAL.---------------

--------------------------------------------------

-----------------------------------------------

30 April 2019 - Q&As Added, See Attached.

***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #3 ·

30 April 2019 - Q&As Added, See Attached. ***********************************

***********************************

04 April 2019: RFI amendment to include

submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #2 ·

04 April 2019: RFI amendment to include submission of NDA and white paper. Please

see RFI Amendment 1

attached.************************

The Space and Naval Warfare Systems

Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Update #1 ·

The Space and Naval Warfare Systems Command (SPAWAR)is releasing this

Request For Information (RFI) for possible

current or emerging Commercial-off-the-

Shelf (COTS) items and/or Non-

Developmental Items (NDI) to satisfy

current or future DCGS-N Inc 2

requirements. Please see attachment for

more information.

Attachments

Show all 20

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity