CP Tango Fire System Upgrade, Area II, Korea
Closed Solicitation Posted
- Solicitation number
- W912UM-19-R-0017
- Agency
-
ENDIST Far East
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Usace Far East District, Area II, Korea Korea, South
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
See Am-0001.
.
Update #5 ·
Site visit is scheduled for Tuesday, 27 August 2019 at 1030 KST at:
10 Dallaenae-ro 387 (sambaekpalsip, Sangjeok-dong), 수정구 달래내로387번길 10
NOTE: Contractor requesting to attend the site visit is required to provide the following information by Wednesday, 21 August 2019:
Contractor's name
Name of person attending
Social Security Number
Birthday
DOD ID Number and DEROS date (expiration date)
.
Update #4 ·
Design-Bid-Build Procurement and negotiated procedures resulting in a firm fixed price contract.
In accordance with Federal Acquisition Regulation (FAR) guidance, the prime contractor must have the capability to perform at least 12% of the contract work with his/her own employees.
Award will be based on best value - trade-off source selection.
The solicitation will be made available for viewing and/or downloading on or about 17 June 2019. The Offeror must possess Department of Defense (DoD) Top Secret FCL, issued in accordance with the National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-M. All members in a JV must possess at a minimum a Top Secret FCL at the date and time of solicitation release.
The solicitation will be released only to Offeror who possess at least a current TOP Security Facility Clearance. The Facility clearance will be validated by Far East District Security Operations Branch. The procurement will require any interested Offeror to sign and return the attached Controlled Unclassified Non-Disclosure Agreement. The Government will accept this item via email to Jennifer.i.ko@usace.army.mil. Note: when submitting the signed Controlled Unclassified Non-Disclosure Agreement, it is important to include in the Offeror's letter, name, address, email address and Commercial and Government Entity (CAGE) Code.
• Factor 1 - Construction Experience
• Factor 2 - Past Performance
• Factor 3 - Price
All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.
Magnitude of Project: The magnitude for this project is between $1,000,000 and $5,000,000. The construction contract is subject to specific limitation and availability of funds.
Requirements:
Description of Project: Install a fire suppression system and minor renovation in a facility, to include it's Sensitive Compartmented Information Facility (SCIF) space, utilizing conventional design and construction methods to accommodate the mission of the facility. The SCIF should be compatible with applicable DoD and base design standards. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements, UFC 1-200-02, High Performance and Sustainable Building Requirements, UFC 4-010-05, SCIF Planning, Design, and Construction. AFMAN 14-304, The Security, Use, and Dissemination of Sensitive Compartmented Information (SCI), and DoD Manual 5105.21 V2, SCI Administrative Security Manual: Administration of Physical Security, Visitor Control, and Technical Security. This project will also comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, and with Intelligence Community Directive Number 705 (ICD 705). This project fulfills US requirements only and will be designed and constructed for US exclusive use. The project location is not on a US installation. Construction phasing may be required to reduce mission impact.
Security Requirements: The Prime Contractor firm shall be responsible for detailing, implementing, and maintaining a construction security program complying with the requirements contained in the ICD 705 for overseas secure facility construction for the duration of the contract in compliance with the Construction Security Plan. The construction security program shall include all aspects of physical, personnel, technical, and procedural security as required to comply with ICD 705 for the final accreditation of the secure facility. At a minimum, the construction security program shall include, but not be limited to the following:
Personnel Nationality and Clearance Requirements for Construction: Prime contractor Firm shall be a company possessing a US Top Secret Facility Clearance Level (FCL). Work for this contract shall be performed by personnel who have a valid U.S. security clearance of TOP SECRET or higher. With government approval, SECRET cleared and vetted local national labor (Republic of Korea Citizens only) may be allowed to perform general construction work such as; concrete construction, and general mechanical, plumbing, electrical, and communications infrastructure under surveillance by Top Secret cleared technicians. If Top Secret cleared technicians are used for this contract, the Prime contractor firm shall be responsible for all costs associated with said personnel, as well as coordination with construction activities to ensure that the work is accomplished without compromise to the construction security program.
Access Control Requirements: The Prime contractor shall maintain a secure construction site perimeter. A site wide badging system meeting ICD 705 requirements for overseas secure facility construction shall be implemented by the Prime contractor to control site access for all construction personnel, deliveries and visitors. The construction site access control process shall be staffed with properly trained personnel who have a valid U.S. security clearance of SECRET or higher and shall include effective screening and search procedures for the ingress and egress of the construction area. Signage shall be displayed prohibiting items that cannot enter the construction area. Barriers shall be erected to deny unauthorized access to the construction area.
Control of Material: Material to be used for this project shall be procured securely as required by the ICD 705 for overseas secure facility construction. Non-inspectable materials to be used for this project shall be shipped securely to the construction site. Inspectable materials to be used for this project shall be inspected prior to use. All aspects of secure procurement, transit, inspection, and storage of materials for this project shall be the responsibility of the Prime contractor.
Performance Period: Duration of construction is (326) calendar days from Notice to Proceed.
The tentative dates are as follows:
• Issue RFP: 5 August 2019
• Closing date for receipt of proposals: 6 September 2019, 1000 KST
• Contract Award: 30 September 2019
Added: Aug 05, 2019 12:55 am Modified: Aug 05, 2019 3:15 amTrack Changes Site visit is scheduled for 7 August 2019 at 1000 KST at:
10 Dallaenae-ro 387 (sambaekpalsip, Sangjeok-dong), 수정구 달래내로387번길 10
NOTE: Contractor requesting to attend the site visit is required to provide contractor's name, name and social security number of person attending the site visit.
Please see Section 00 21 16 and Section 00 22 16.
.
Update #3 ·
Site visit is scheduled for 7 August 2019 at 1000 KST at:
10 Dallaenae-ro 387 (sambaekpalsip, Sangjeok-dong), 수정구 달래내로387번길 10
NOTE: Contractor requesting to attend the site visit is required to provide contractor's name, name and social security number of person attending the site visit.
.
Update #2 ·
Design-Bid-Build Procurement and negotiated procedures resulting in a firm fixed price contract.
In accordance with Federal Acquisition Regulation (FAR) guidance, the prime contractor must have the capability to perform at least 12% of the contract work with his/her own employees.
Award will be based on best value - trade-off source selection.
The solicitation will be made available for viewing and/or downloading on or about 17 June 2019. The Offeror must possess Department of Defense (DoD) Top Secret FCL, issued in accordance with the National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-M. All members in a JV must possess at a minimum a Top Secret FCL at the date and time of solicitation release.
The solicitation will be released only to Offeror who possess at least a current TOP Security Facility Clearance. The Facility clearance will be validated by Far East District Security Operations Branch. The procurement will require any interested Offeror to sign and return the attached Controlled Unclassified Non-Disclosure Agreement. The Government will accept this item via email to Jennifer.i.ko@usace.army.mil. Note: when submitting the signed Controlled Unclassified Non-Disclosure Agreement, it is important to include in the Offeror's letter, name, address, email address and Commercial and Government Entity (CAGE) Code.
• Factor 1 - Construction and Design Experience
• Factor 2 - Past Performance
• Factor 3 - Price
All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.
Magnitude of Project: The magnitude for this project is between $1,000,000 and $5,000,000. The construction contract is subject to specific limitation and availability of funds.
Requirements:
Description of Project: Install a fire suppression system and minor renovation in a facility, to include it's Sensitive Compartmented Information Facility (SCIF) space, utilizing conventional design and construction methods to accommodate the mission of the facility. The SCIF should be compatible with applicable DoD and base design standards. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements, UFC 1-200-02, High Performance and Sustainable Building Requirements, UFC 4-010-05, SCIF Planning, Design, and Construction. AFMAN 14-304, The Security, Use, and Dissemination of Sensitive Compartmented Information (SCI), and DoD Manual 5105.21 V2, SCI Administrative Security Manual: Administration of Physical Security, Visitor Control, and Technical Security. This project will also comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, and with Intelligence Community Directive Number 705 (ICD 705). This project fulfills US requirements only and will be designed and constructed for US exclusive use. The project location is not on a US installation. Construction phasing may be required to reduce mission impact.
Security Requirements: The Prime Contractor firm shall be responsible for detailing, implementing, and maintaining a construction security program complying with the requirements contained in the ICD 705 for overseas secure facility construction for the duration of the contract in compliance with the Construction Security Plan. The construction security program shall include all aspects of physical, personnel, technical, and procedural security as required to comply with ICD 705 for the final accreditation of the secure facility. At a minimum, the construction security program shall include, but not be limited to the following:
Personnel Nationality and Clearance Requirements for Construction: Prime contractor Firm shall be a company possessing a US Top Secret Facility Clearance Level (FCL). Work for this contract shall be performed by personnel who have a valid U.S. security clearance of TOP SECRET or higher. With government approval, SECRET cleared and vetted local national labor (Republic of Korea Citizens only) may be allowed to perform general construction work such as; concrete construction, and general mechanical, plumbing, electrical, and communications infrastructure under surveillance by Top Secret cleared technicians. If Top Secret cleared technicians are used for this contract, the Prime contractor firm shall be responsible for all costs associated with said personnel, as well as coordination with construction activities to ensure that the work is accomplished without compromise to the construction security program.
Access Control Requirements: The Prime contractor shall maintain a secure construction site perimeter. A site wide badging system meeting ICD 705 requirements for overseas secure facility construction shall be implemented by the Prime contractor to control site access for all construction personnel, deliveries and visitors. The construction site access control process shall be staffed with properly trained personnel who have a valid U.S. security clearance of SECRET or higher and shall include effective screening and search procedures for the ingress and egress of the construction area. Signage shall be displayed prohibiting items that cannot enter the construction area. Barriers shall be erected to deny unauthorized access to the construction area.
Control of Material: Material to be used for this project shall be procured securely as required by the ICD 705 for overseas secure facility construction. Non-inspectable materials to be used for this project shall be shipped securely to the construction site. Inspectable materials to be used for this project shall be inspected prior to use. All aspects of secure procurement, transit, inspection, and storage of materials for this project shall be the responsibility of the Prime contractor.
Performance Period: Duration of construction is (326) calendar days from Notice to Proceed.
The tentative dates are as follows:
• Issue RFP: 17 June 2019
• Closing date for receipt of proposals: 22 July 2019
• Contract Award: 30 September 2019
.
Update #1 ·
Design-Build Procurement and negotiated procedures resulting in a firm fixed price contract.
In accordance with Federal Acquisition Regulation (FAR) guidance, the prime contractor must have the capability to perform at least 12% of the contract work with his/her own employees.
Award will be based on best value - trade-off source selection.
The solicitation will be made available for viewing and/or downloading on or about 17 June 2019. The Offeror must possess Department of Defense (DoD) Top Secret FCL, issued in accordance with the National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-M. All members in a JV must possess at a minimum a Top Secret FCL at the date and time of solicitation release.
The solicitation will be released only to Offeror who possess at least a current TOP Security Facility Clearance. The Facility clearance will be validated by Far East District Security Operations Branch. The procurement will require any interested Offeror to sign and return the attached Controlled Unclassified Non-Disclosure Agreement. The Government will accept this item via email to Jennifer.i.ko@usace.army.mil. Note: when submitting the signed Controlled Unclassified Non-Disclosure Agreement, it is important to include in the Offeror's letter, name, address, email address and Commercial and Government Entity (CAGE) Code.
• Factor 1 - Construction and Design Experience
• Factor 2 - Past Performance
• Factor 3 - Price
All evaluation factors other than cost or price, when combined, are significantly more important than cost or price.
Magnitude of Project: The magnitude for this project is between $1,000,000 and $5,000,000. The construction contract is subject to specific limitation and availability of funds.
Requirements:
Description of Project: Install a fire suppression system and minor renovation in a facility, to include it's Sensitive Compartmented Information Facility (SCIF) space, utilizing conventional design and construction methods to accommodate the mission of the facility. The SCIF should be compatible with applicable DoD and base design standards. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements, UFC 1-200-02, High Performance and Sustainable Building Requirements, UFC 4-010-05, SCIF Planning, Design, and Construction. AFMAN 14-304, The Security, Use, and Dissemination of Sensitive Compartmented Information (SCI), and DoD Manual 5105.21 V2, SCI Administrative Security Manual: Administration of Physical Security, Visitor Control, and Technical Security. This project will also comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, and with Intelligence Community Directive Number 705 (ICD 705). This project fulfills US requirements only and will be designed and constructed for US exclusive use. The project location is not on a US installation. Construction phasing may be required to reduce mission impact.
Security Requirements: The Prime Contractor firm shall be responsible for detailing, implementing, and maintaining a construction security program complying with the requirements contained in the ICD 705 for overseas secure facility construction for the duration of the contract in compliance with the Construction Security Plan. The construction security program shall include all aspects of physical, personnel, technical, and procedural security as required to comply with ICD 705 for the final accreditation of the secure facility. At a minimum, the construction security program shall include, but not be limited to the following:
Personnel Nationality and Clearance Requirements for Construction: Prime contractor Firm shall be a company possessing a US Top Secret Facility Clearance Level (FCL). Work for this contract shall be performed by personnel who have a valid U.S. security clearance of TOP SECRET or higher. With government approval, SECRET cleared and vetted local national labor (Republic of Korea Citizens only) may be allowed to perform general construction work such as; concrete construction, and general mechanical, plumbing, electrical, and communications infrastructure under surveillance by Top Secret cleared technicians. If Top Secret cleared technicians are used for this contract, the Prime contractor firm shall be responsible for all costs associated with said personnel, as well as coordination with construction activities to ensure that the work is accomplished without compromise to the construction security program.
Access Control Requirements: The Prime contractor shall maintain a secure construction site perimeter. A site wide badging system meeting ICD 705 requirements for overseas secure facility construction shall be implemented by the Prime contractor to control site access for all construction personnel, deliveries and visitors. The construction site access control process shall be staffed with properly trained personnel who have a valid U.S. security clearance of SECRET or higher and shall include effective screening and search procedures for the ingress and egress of the construction area. Signage shall be displayed prohibiting items that cannot enter the construction area. Barriers shall be erected to deny unauthorized access to the construction area.
Control of Material: Material to be used for this project shall be procured securely as required by the ICD 705 for overseas secure facility construction. Non-inspectable materials to be used for this project shall be shipped securely to the construction site. Inspectable materials to be used for this project shall be inspected prior to use. All aspects of secure procurement, transit, inspection, and storage of materials for this project shall be the responsibility of the Prime contractor.
Performance Period: Duration of construction is (326) calendar days from Notice to Proceed.
The tentative dates are as follows:
• Issue RFP: 17 June 2019
• Closing date for receipt of proposals: 22 July 2019
• Contract Award: 30 September 2019
.
Files
| File | Type | Posted |
|---|---|---|
| Attachment_00_21_00_-2-NonDisclosureAgreement.pdf |