Corner Bay Bridge Replacement

Closed Solicitation Posted

Solicitation number
12010920Q0051
Agency
Region 10 - Alaska Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Sitka AK 99835 USA

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

The USDA Forest Service, Alaska Region, Tongass National Forest requires road maintenance and bridge replacement activities on the Corner Bay road system of Chichagof Island near Sitka. The work involves, but is not limited to, removal of an old bridge, transportation and installation of new bridge components, and moving/hauling earthen materials. This work is subject to the Construction Wage Rate Requirements statute.

The order of magnitude of this work is estimated to be between $25,000 and $100,000. This activity is subject to a Small Business set-aside, and is being procured under Simplified Acquisition Procedures (FAR 13) through a Request for Quotes (RFQ).

For more information, see the attached RFQ and associated documents.

Quotes are due at 16:00 Local Alaska Time on 5/26/2020 in an email to jonathan.gellings@usda.gov. Any questions must be submitted to the same email.

UPDATED 5/22/2020: Amendment 001 has been attached to this posting. It includes additional Option Items, applicable specifications, and related terms and conditions resulting from including Option Items. Further, it extends the quote due date from 5/26/2020 until 6/3/2020. See attachment for additional information.

UPDATED 5/27/2020: New information is available about the bridge materials. A map showing the location of the Thorne Bay Sort Yard is attached. The width of the whole bridge is 18 feet; each half bridge width is 9 feet. The *approximate* weight of the whole bridge is ~110,000 to ~130,000 pounds (includes decking and guard rail materials); each *approximate* half bridge weight is ~55,000 to ~65,000 pounds (includes decking and guard rail materials). No formal Amendment is warranted for this information.

UPDATED 6/8/2020: The fish timing window in Section C.12 has been reduced according to state requirements. Therefore, the solicitation has been Amended and the Period of Performance changed from 06/10/2020 - 09/30/2020 to 06/19/2020 - 09/30/2021, with quotes due by 6/12/2020 at 14:00 local Alaska time. See Amendment 002 for specific information.

Update #3 ·

The USDA Forest Service, Alaska Region, Tongass National Forest requires road maintenance and bridge replacement activities on the Corner Bay road system of Chichagof Island near Sitka. The work involves, but is not limited to, removal of an old bridge, transportation and installation of new bridge components, and moving/hauling earthen materials. This work is subject to the Construction Wage Rate Requirements statute.

The order of magnitude of this work is estimated to be between $25,000 and $100,000. This activity is subject to a Small Business set-aside, and is being procured under Simplified Acquisition Procedures (FAR 13) through a Request for Quotes (RFQ).

For more information, see the attached RFQ and associated documents.

Quotes are due at 16:00 Local Alaska Time on 5/26/2020 in an email to jonathan.gellings@usda.gov. Any questions must be submitted to the same email.

UPDATED 5/22/2020: Amendment 001 has been attached to this posting. It includes additional Option Items, applicable specifications, and related terms and conditions resulting from including Option Items. Further, it extends the quote due date from 5/26/2020 until 6/3/2020. See attachment for additional information.

UPDATED 5/27/2020: New information is available about the bridge materials. A map showing the location of the Thorne Bay Sort Yard is attached. The width of the whole bridge is 18 feet; each half bridge width is 9 feet. The *approximate* weight of the whole bridge is ~110,000 to ~130,000 pounds (includes decking and guard rail materials); each *approximate* half bridge weight is ~55,000 to ~65,000 pounds (includes decking and guard rail materials). No formal Amendment is warranted for this information.

Update #2 ·

The USDA Forest Service, Alaska Region, Tongass National Forest requires road maintenance and bridge replacement activities on the Corner Bay road system of Chichagof Island near Sitka. The work involves, but is not limited to, removal of an old bridge, transportation and installation of new bridge components, and moving/hauling earthen materials. This work is subject to the Construction Wage Rate Requirements statute.

The order of magnitude of this work is estimated to be between $25,000 and $100,000. This activity is subject to a Small Business set-aside, and is being procured under Simplified Acquisition Procedures (FAR 13) through a Request for Quotes (RFQ).

For more information, see the attached RFQ and associated documents.

Quotes are due at 16:00 Local Alaska Time on 5/26/2020 in an email to jonathan.gellings@usda.gov. Any questions must be submitted to the same email.

UPDATED 5/22/2020: Amendment 001 has been attached to this posting. It includes additional Option Items, applicable specifications, and related terms and conditions resulting from including Option Items. Further, it extends the quote due date from 5/26/2020 until 6/3/2020. See attachment for additional information.

Update #1 ·

The USDA Forest Service, Alaska Region, Tongass National Forest requires road maintenance and bridge replacement activities on the Corner Bay road system of Chichagof Island near Sitka. The work involves, but is not limited to, removal of an old bridge, transportation and installation of new bridge components, and moving/hauling earthen materials. This work is subject to the Construction Wage Rate Requirements statute.

The order of magnitude of this work is estimated to be between $25,000 and $100,000. This activity is subject to a Small Business set-aside, and is being procured under Simplified Acquisition Procedures (FAR 13) through a Request for Quotes (RFQ).

For more information, see the attached RFQ and associated documents.

Quotes are due at 16:00 Local Alaska Time on 5/26/2020 in an email to jonathan.gellings@usda.gov. Any questions must be submitted to the same email

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment 0002.pdf PDF
Thorne Bay Sort Yard Map.jpg JPG image
Amendment 001.pdf PDF
Relevant Experience Evaluation Form.pdf PDF
Construction Wage Determination.pdf PDF
CB_Bridge Replacement_Drawings.pdf PDF
12010920Q0051.pdf PDF
CB_Bridge Replacement_FSSS.docx DOCX document

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity