CB_Bridge Replacement_Drawings.pdf
PDF 1 MB Posted
- Attached to
- Corner Bay Bridge Replacement Federal contract opportunity
- Solicitation number
- 12010920Q0051
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Thorne Bay Sort Yard Map.jpg | JPG image | |
| Amendment 001.pdf | ||
| Construction Wage Determination.pdf | ||
| Relevant Experience Evaluation Form.pdf | ||
| CB_Bridge Replacement_FSSS.docx | DOCX document | |
| 12010920Q0051.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
SHEET OF
United States Department of Agriculture
Forest Service
1 7
RECOMMENDED BY:
APPROVED:
DISTRICT RANGER
DATE
FOREST ENGINEER
DATE
DATE
ROADS PROGRAM MANAGER
4/1 6/2
0 0 8:
C
LA
VO
IE
C
:\U
SE
RS
\C
LA
VO
IE
\B
OX
\01
. C
AS
EY
.L
AV
OI
E W
OR
KS
PA
CE
\P
RO
JE
CT
S\
CO
RN
ER
B
AY
B
RI
DG
E
RE
PL
AC
EM
EN
T\
CB
_B
RI
DG
E
RE
PL
AC
EM
EN
T.
DW
G;
CORNER BAY BRIDGE REPLACEMENT
ALASKA
SITKA RANGER DISTRICT
TONGASS NATIONAL FOREST
R10 ALASKA REGION
56°
VICINITY MAP
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVER SHEET
2 PROJECT MAP
3 TYPICAL ROAD X-SECTION
4 MODULAR BRIDGE INSTALLATION
5 BRIDGE BACKWALL DETAILS
BRIDGE WEARING SURFACE &
SIGNING DETAILS
7 LOG BRIDGE REMOVAL
AutoCAD SHX Text 132%%d
AutoCAD SHX Text 136%%d
AutoCAD SHX Text 138%%d
AutoCAD SHX Text 140%%d
AutoCAD SHX Text 142%%d
AutoCAD SHX Text 134%%d
AutoCAD SHX Text
JUNEAU
AutoCAD SHX Text Craig
AutoCAD SHX Text 132%%d
AutoCAD SHX Text
GULF OF ALASKA
AutoCAD SHX Text 58%%d
AutoCAD SHX Text Sitka
AutoCAD SHX Text 138%%d
AutoCAD SHX Text 60%%d
AutoCAD SHX Text Yakutat
AutoCAD SHX Text
ALASKA
AutoCAD SHX Text 142%%d
AutoCAD SHX Text 62%%d
AutoCAD SHX Text
CANADA
AutoCAD SHX Text 140%%d
AutoCAD SHX Text Skagway
AutoCAD SHX Text 136%%d
AutoCAD SHX Text 134%%d
AutoCAD SHX Text 56%%d
AutoCAD SHX Text 54%%d
AutoCAD SHX Text Ketchikan
AutoCAD SHX Text Wrangell
AutoCAD SHX Text Petersburg
AutoCAD SHX Text 60%%d
AutoCAD SHX Text 58%%d
AutoCAD SHX Text 130%%d
AutoCAD SHX Text 128%%d
#7624 MP 0.132
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 6/2
0 0 8:
C
LA
VO
IE
C
:\U
SE
RS
\C
LA
VO
IE
\B
OX
\01
. C
AS
EY
.L
AV
OI
E W
OR
KS
PA
CE
\P
RO
JE
CT
S\
CO
RN
ER
B
AY
B
RI
DG
E
RE
PL
AC
EM
EN
T\
CB
_B
RI
DG
E
RE
PL
AC
EM
EN
T.
DW
G;
R10
ALASKA REGION
CORNER BAY BRIDGE
REPLACEMENT
TONGASS NATIONAL
FOREST
SITKA RANGER DISTRICT
PROJECT MAP
April 16, 2020
PROJECT MAP
X.XXX
X.XXX
X.XXX
PROJECT MAP
CORNER BAY
TENAKEE INLET C
H
A T
H A
M
S
T R
A I T
TENAKEE SPRINGS
REMOVE EXISTING LOG BRIDGE
TRANSPORT & INSTALL GOV'T
FURNISHED 70' MODULAR
BRIDGE
Miles
1:100000
52.50
1.25
ROCKPITS
Default
Rockpits
Bridges
Tongass_Roads
Land
Map Base
CORNER BAY MARINE
ACCESS FACILITY
(MAF)
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
E
EXISTING GROUND
3' ROADBED WIDTH 5' MIN
VARIABLE SLOPE AS
DESIGNATED/STAKED
DECK MERCHANTABLE TIMBER
LIMBS, TOPS, SLASH,
CULL LOGS AND
ROADWAY EXCAVATION
EXCESS TO DEBRIS MAT
OR BENCH REQUIREMENTS
BORROW AND/OR SUITABLE ROCK EXCAVATION
PREPARED GROUND SURFACE, DEBRIS MAT
EMBANKMENT: BORROW EXCAVATION TO BE USED ONLY
AFTER ALL AVAILABLE SUITABLE EXCAVATION,
CONSTRUCTION SLASH AND DEBRIS HAS BEEN UTILIZED
2' MIN
NOTE: STUMPS SHALL BE GRUBBED AND
CONSTRUCTION SLASH/DEBRIS REMOVED AT
A MINIMUM OF 5' FROM THE CONSTRUCTION
ROAD SHOULDER
TYPICAL SIDEHILL SECTION
EXCAVATION
SUBGRADE
2' MIN
10' 5' MIN
VARIABLE CLEARING LIMITS
CLEARING, UNDISTURBED STUMPS
AND CLEARING DEBRIS, SEE NOTE 3
SUBGRADE
BORROW
TYPICAL OVERLAY SECTION
GRUBBING LIMITS 5' MIN
VARIABLE CLEARING LIMITS
ORIGINAL GROUND
VARIABLE SLOPE AS
DESIGNED/STAKED
EXCAVATION
PREPARED GROUND SURFACE,
DEBRIS MAT OR BENCH
EMBANKMENT, VARIABLE DEPTH
ROCK MATERIAL, BORROW AND/OR
SUITABLE ROCK EXCAVATION
EXCESS EXCAVATED
MATERIAL
DECK MERCHANTABLE
TIMBER TYP
TYPICAL THROUGH CUT SECTION
50' 25'
8'
R
T
O
INTERSECTION DETAILS
NOTES
1. PROFILE ELEVATIONS ARE SHOWN TO SUBGRADE.
2. CROWN TRAVELED WAY OR ROADBED 2%.
3. UNDISTURBED STUMPS AND OTHER CLEARING DEBRIS IN EMBANKMENT
AREAS MAY BE LEFT IN PLACE IF THEY DO NOT EXTEND CLOSER THAN 24"
TO ANY SUBGRADE. (REFERENCE SPEC. 201.05B)
4. UNLESS OTHERWISE INDICATED OR STAKED, ALL FILL SLOPES SHALL BE
1:1.25 AND ALL CUT SLOPES SHALL BE 1:1 OR AS SHOWN IN THE STAKING
NOTES.
5. ROAD NO. STA. TO STA. TOLERANCE CLASS FINISH METHOD
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
XXXX XXXX TO XXXX XXXX XXXX
20'
16'
25' 30' 25'
25' 50' 25'
25' 50' 25'
50' 80' 50'
ROAD DESIGN SPEED = 10 MPH
ROAD DESIGN SPEED = 20 MPH
ROAD DESIGN SPEED = 30 MPH
10' TYP
5' TYP
TURNOUT/PULLOUT DETAILS
16'
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 6/2
0 0 8:
C
LA
VO
IE
C
:\U
SE
RS
\C
LA
VO
IE
\B
OX
\01
. C
AS
EY
.L
AV
OI
E W
OR
KS
PA
CE
\P
RO
JE
CT
S\
CO
RN
ER
B
AY
B
RI
DG
E
RE
PL
AC
EM
EN
T\
CB
_B
RI
DG
E
RE
PL
AC
EM
EN
T.
DW
G;
R10
ALASKA REGION
CORNER BAY BRIDGE
REPLACEMENT
TONGASS NATIONAL
FOREST
SITKA RANGER DISTRICT
TYPICAL
CROSS-SECTION
Nov 2019
Rev 1
TNF
K. CHERRY
TNF ENG
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
GENERAL NOTES:
TREES TO BE CUT FOR SILL AND BACKWALL
LOGS WILL BE DESIGNATED IN THE FIELD BY
THE C.O. ATTACH BRIDGE TO SILL AS
RECOMMENDED BY THE MANUFACTURER.
ABUTMENT LOCATION AND ELEVATIONS WILL BE
STAKED IN THE FIELD BY THE C.O.
MECHANICALLY PLACED EMBANKMENT, WHEN
REQUIRED, IS CONSIDERED INCIDENTAL TO
BRIDGE INSTALLATION. PLACE IN ACCORDANCE
w/ SPECIAL ROCK EMBANKMENT & ROCK
BUTTRESS (FP-14 SECTION-252).
PROVIDE CONNECTION BETWEEN BRIDGE HALVES
IN ACCORDANCE WITH MANUFACTURER'S DESIGN,
INCLUDING DIAPHRAGMS AND ANGLE BRACES
BETWEEN GIRDERS AND RUNNING PLANKS ALONG
CENTER OF DECK.
FOR BRIDGE FURNISHED BY THE GOVERNMENT,
THE CONTRACTOR IS RESPONSIBLE FOR
REMOVAL AND TRANSPORTATION OF THE BRIDGE
FROM ITS PRESENT LOCATION.
SEE PLAN & PROFILE SHEETS FOR FISH TIMING
REQUIREMENTS.
EROSION CONTROL PLAN IS REQUIRED IF
DIRECTED BY THE C.O. (FP-14 SECTION-157).
THE BEARING PLATES SHALL
BE COMPLETELY SUPPORTED ON THE LOG SILL.
MODULAR BRIDGES
ROAD
7540CB 700.132 X
(FT)
LENGTHL-STA/
MP
FURNISHED BY
CONTR. GOV'T
THORNE BAY SORT YARD XX
PRESENT LOCATION
(IF GOV'T FURNISHED)
PLAN &
PROFILE
SHEET
DRAWING TITLE
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
4/1 6/2
0 0 8:
C
LA
VO
IE
C
:\U
SE
RS
\C
LA
VO
IE
\B
OX
\01
. C
AS
EY
.L
AV
OI
E W
OR
KS
PA
CE
\P
RO
JE
CT
S\
CO
RN
ER
B
AY
B
RI
DG
E
RE
PL
AC
EM
EN
T\
CB
_B
RI
DG
E
RE
PL
AC
EM
EN
T.
DW
G;
R10
ALASKA REGION
CORNER BAY BRIDGE
REPLACEMENT
TONGASS NATIONAL
FOREST
SITKA RANGER DISTRICT
MODULAR BRIDGE
INSTALLATION
Nov 2019
Rev 1
TNF
K. CHERRY
TNF ENG
BRIDGE, BACKWALL LUMBER, LOG SILLS ALL
LOCATED IN THORNE BAY SORT YARD,
PRINCE OF WALES ISLAND
AutoCAD SHX Text
GOV'T FURNISHED TREATED TIMBER BACKWALL- LONG ENOUGH TO CONTAIN APPROACH FILL
AutoCAD SHX Text
MECHANICALLY PLACED EMBANKMENT
AutoCAD SHX Text
ROAD EDGE
AutoCAD SHX Text
TOE OF FILL
AutoCAD SHX Text
TAPER RIPRAP TO DESIGNED FILL
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
DESIGNED FILL
AutoCAD SHX Text
STREAM THALWEG
AutoCAD SHX Text
MODULAR BRIDGE
AutoCAD SHX Text
TOE OF FILL
AutoCAD SHX Text
ROAD EDGE
AutoCAD SHX Text
ROAD CENTERLINE
AutoCAD SHX Text
INSTALL BRIDGE TO MATCH FINISH ROAD GRADE, CUT/FILL AS REQUIRED
AutoCAD SHX Text
36" MIN. (W/OUT RIPRAP)
AutoCAD SHX Text
MODULAR BRIDGE
AutoCAD SHX Text
OBSERVED HIGH WATER MARKS/Q50
AutoCAD SHX Text MECHANICALLY PLACED EMBANKMENT, SEE (FP-14 SECTION-252). SEE (FP-14 SECTION-705.04) FOR GRADATION. PLACE ALONG STREAM BANK AS NEEDED FOR SLOPE PROTECTION WHERE REQUIRED BY THE C.O.
AutoCAD SHX Text
PLACE BOTTOM OF GIRDER 5' MIN. ABOVE OBSERVED HIGH WATER MARKS
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
1" MINUS GRAVEL LEVELING COURSE
AutoCAD SHX Text GOV'T FURNISHED SILL LOGS TO BE TRANSPORTED FROM THORNE BAY SORT YARD. PROVIDE LEVEL BEARING AREAS ON TOP OF THE LOG SILLS FOR THE BEARING PLATES TO REST. THE BEARING PLATES SHALL
AutoCAD SHX Text
EXCAVATE FOR SILL CONSTRUCTION, FILL W/ BORROW AND/OR SUITABLE ROCK EXCAVATION
AutoCAD SHX Text BACKWALLS TO BE CONSTRUCTED WITH GOV'T FURNISHED TREATED TIMBER PLANKS, TRANSPORTED FROM THORNE BAY SORT YARD. CONTRACTOR TO SUPPLY ALL NECESSARY FASTENING HARDWARE. SEE SHEET 5 FOR MORE DETAILS.
AutoCAD SHX Text
BORROW AND/OR SUITABLE ROCK EXCAVATION
AutoCAD SHX Text
1% (MIN) TO 5% (MAX) BRIDGE GRADE
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
PROFILE
AutoCAD SHX Text
BORROW AND/OR SUITABLE ROCK EXCAVATION
AutoCAD SHX Text
PROJECT NAME
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R10)
ALASKA REGION
CORNER BAY
BRIDGE
REPLACEMENT
TONGASS NATIONAL
FOREST
SITKA RANGER DISTRICT
BRIDGE BACKWALL
DETAILS
XX/XX/XXXX
X.XXX
X.XXX
X.XXX
5 7
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
RUNNING PLANK
CUPPED PLANKS WILL BE PLACED WITH THE CONVEX SIDE UP.
RECESS NAIL HEAD 3/8".
AT 3 ft SPACING THROUGHOUT LENGTH.
SPIRAL SPIKE, 2 AT PLANK ENDS. STAGGER
NOTE: ON RAINIER BRIDGES NAIL RUNNING
AND DECK PLANKS ONLY TO CROSS TIES.
RUNNING PLANK TO DECK CONNECTION
USE 60d RING SHANK OR DOUBLE
EXTEND RUNNING PLANKS TO
COVER TOP OF BACKWALL
WHERE POSSIBLE.1
-1
/2 in
1-1/2 in
WHICH TERMINATE AT END OF
CHAMFER RUNNING PLANK ENDS
BRIDGE DECK
/8 in
DECK PLANK
GENERAL NOTES
1. VERIFY BRIDGE LENGTH AND WIDTH PRIOR TO ORDERING RUNNING PLANK
MATERIALS.
2. NEW RUNNING PLANKS SHALL BE UNTREATED DOUG FIR, HEMLOCK,
OR SITKA SPRUCE, No. 2 or BETTER, ROUGH FINISH 3" X 12".
3. ALL HARDWARE SHALL BE GALVANIZED.
4. CLEAN DECK SURFACE OF ROCKS, SAND, DIRT, AND OTHER MATERIAL PRIOR TO
REMOVING EXISTING PLANKS AND INSTALLATION OF NEW RUNNING PLANKS.
PRESSURE WASHING IS NOT AN ACCEPTABLE MEANS OF CLEANING A BRIDGE.
MATERIAL REMOVED FROM A BRIDGE WILL BE DEPOSITED AWAY FROM ANY LIVE
STREAM AS DIRECTED BY THE ENGINEER.
5. STAGGER BUTT JOINTS BETWEEN SUCCESSIVE RUNNING PLANKS.
6. PRESERVATIVE TREATMENT SHALL BE COPPER NAPTHENATE. TREAT MATERIAL IN
ACCORDANCE WITH AWPA C1 AND C2 ABOVE GROUND USE.
7. TREAT ALL FIELD DRILLED HOLES IN ACCORDANCE WITH AWPA M4.
8. DISPOSE OF EXCESS AND WASTE MATERIALS OFF FOREST SERVICE LAND.
9. MINIMUM LENGTH OF PLANK IS 10 FEET.
10. LEAVE 4"-6" GAP BETWEEN OUTSIDE PLANKS AND TREATED CURBING.
COVER BACKWALL IF POSSIBLE
CURB, OR BRIDGE END.
POSSIBLE TO BRIDGE PARAPET,
INSTALLED AS CLOSE AS
OBJECT MARKER IS TO BE
GUARD RAIL
4"x4"x9'-0" POST
INSIDE OF RAIL ELEMENT
TO BE FLUSH WITH THE
EDGE OF MARKER PLATE
CENTERLINE
ROADWAY12"
V
A R
I E
S
BRIDGE
1"
2"
SCALE:
B
OBJECT MARKER
M.U.T.C.D. TYPE 3
NTS
SCALE:
A
BRIDGE WEARING SURFACE
NTS
70' MODULAR BRIDGE WEARING SURFACE & OBJECT MARKER NOTES:
1. CONTRACTOR SHALL CHAMFER CUT ALL ENDS OF EXISTING BRIDGE WEARING
SURFACE AS SHOWN IN DETAIL A3 THIS SHEET.
2. CONTRACTOR MUST SUPPLY & INSTALL (4) NEW BRIDGE OBJECT MARKERS &
POSTS / HARDWARE AS SHOWN IN DETAIL B3 THIS SHEET. CONTRACTOR
SUPPLIED OBJECT MARKERS WILL BE CONSIDERED INCIDENTAL TO THE
INSTALLATION OF THE MODULAR BRIDGE PAY ITEM AND NO ADDITIONAL PAYMENT
WILL BE MADE.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
R10
ALASKA REGION
CORNER BAY
BRIDGE
REPLACEMENT
TONGASS NATIONAL
FOREST
SITKA RANGER DISTRICT
BRIDGE WEARING
SURFACE & OBJECT
MARKER DETAILS
XX/XX/XXXX
X.XXX
X.XXX
X.XXX
6 7
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R10)
ALASKA REGION
CORNER BAY
BRIDGE
REPLACEMENT
TONGASS NATIONAL
FOREST
SITKA RANGER DISTRICT
LOG BRIDGE REMOVAL
04/10/2020
X.XXX
X.XXX
X.XXX
7 7
AutoCAD SHX Text
TYPICAL TOP VIEW
AutoCAD SHX Text
BROW LOG
AutoCAD SHX Text
SILL LOG
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
STINGER
AutoCAD SHX Text
STRINGER
AutoCAD SHX Text
CABLE WRAP
AutoCAD SHX Text
TYPICAL SIDE VIEW
AutoCAD SHX Text
STINGER
AutoCAD SHX Text
BROW LOG
AutoCAD SHX Text
CABLE WRAP
AutoCAD SHX Text
STRINGER
AutoCAD SHX Text
SILL LOG
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ROAD SURFACE
AutoCAD SHX Text
TERRACE MIN. 3 FT. WIDE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL TOP VIEW
AutoCAD SHX Text
TYPICAL SIDE VIEW
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PLACEMENT OF EXCAVATED
AutoCAD SHX Text
ROADBED MATERIAL
AutoCAD SHX Text REMOVE ALL CABLE, STAPLES AND OTHER HARDWARE. HAUL AND DECK MERCHANTABLE TIMBER TO LOCATION DESIGNATED BY THE CO.
AutoCAD SHX Text AFTER REMOVING ALL HARDWARE DECK UNMERCHANTABLE TIMBER ON DOWNHILL SIDE OF ROAD AT LOCATION DESIGNATED BY THE CO.
AutoCAD SHX Text
GRASS SEED AND FERTILIZE ALL EXCAVATED AREAS.
AutoCAD SHX Text DISPOSAL OF ALL CABLE, STAPLES AND OTHER HARDWARE USING METHOD (a), SUBSECTION 203.05
AutoCAD SHX Text ROADFILL TO BE EXCAVATED A MINIMUM WIDTH OF 2' BEYOND NATURAL STREAM CHANNEL ON BOTH SIDES. SLOPES TO BE LAID BACK TO 2(H):1(V)
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| CB_Bridge Replacement-COVERSHEET |
| CB_Bridge Replacement-PROJECT MAP |
| CB_Bridge Replacement-TYP X-SECT |
| CB_Bridge Replacement-MODULAR BRIDGE |
| CB_Bridge Replacement-Backwall |
| CB_Bridge Replacement-WEAR SURFACE_OBJECT MRKR |
| CB_Bridge Replacement-LOG BRIDGE REMOVAL |
File details come from the government source that posted it. Updated .