Copper Basin OHV Parking Lot and Site Road Repavin

Award Notice Posted

Solicitation number
140L6418Q0010
Agency
Awarded
to Brayco Engineering, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
140L6418P0035 Federal contract award
NAICS code
238990 All Other Specialty Trade Contractors
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Copper Basin OHV Parking Lot and Site Road Repaving

------

The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not described, except as considered essential for the successful completion of the work. Furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

-------

Project Identification:

-

Copper Basin OHV Parking Lot and Site Road Rehabilitation.

Project Location:

Project is located approximately 31.2 miles south of Lake Havasu City, AZ. This project is being performed for the Bureau of Land Management (BLM) in California, on the National System of Federal Lands acquired and administered by the Lake Havasu Field Office within the Colorado River District. Copper Basin OHV Site is located within the Parker Strip Recreation Area on the California side of the Colorado River in California Congressional District 8. The site is administered, managed and operated by the BLM Arizona Lake Havasu Field Office.

Scope:

The work will consists of the following: This proposed project includes a parking lot and site road pavement rehabilitation. The site road construction includes but is not limited to 6 inch pulverizing of existing site road pavement in place, finish grading and compaction. The asphalt paving application will be of a Type 2B double penetrating chip seal with uncoated chips, with a final fog seal and applicable roadway markings. The existing parking lot, includes a crack fill seal with a nominal double chip and fog seal, parking lot stripping and applicable markings.

Update #1 ·

Copper Basin OHV Parking Lot and Site Road Repaving

------

The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not described, except as considered essential for the successful completion of the work. Furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

-------

Project Identification:

-

Copper Basin OHV Parking Lot and Site Road Rehabilitation.

Project Location:

Project is located approximately 31.2 miles south of Lake Havasu City, AZ. This project is being performed for the Bureau of Land Management (BLM) in California, on the National System of Federal Lands acquired and administered by the Lake Havasu Field Office within the Colorado River District. Copper Basin OHV Site is located within the Parker Strip Recreation Area on the California side of the Colorado River in California Congressional District 8. The site is administered, managed and operated by the BLM Arizona Lake Havasu Field Office.

Scope:

The work will consists of the following: This proposed project includes a parking lot and site road pavement rehabilitation. The site road construction includes but is not limited to 6 ¿inch pulverizing of existing site road pavement in place, finish grading and compaction. The asphalt paving application will be of a Type 2B double penetrating chip seal with uncoated chips, with a final fog seal and applicable roadway markings. The existing parking lot, includes a crack fill seal with a nominal double chip and fog seal, parking lot stripping and applicable markings.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity