Compressor unit, REC, in repair/modification of
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N0010424RZA66
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333914 Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- PSC
- 4310 Compressors And Vacuum Pumps
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of the Navy Naval Supply Systems Command seeks offers for the repair/modification of a compressor unit. Offerors must inspect and refurbish the item in accordance with the technical data package and repair instruction referenced. A key evaluation criteria will be the offeror's proposed repair turnaround time of 365 days or less. Proposals are due by February 29, 2024.
There is no set-aside designated for this requirement. The NAICS code is 333914 and PSC code is 1300. Offerors must meet all quality assurance and packaging requirements. The refurbished unit must be delivered within the proposed repair turnaround time, with a price reduction penalty for late deliveries. Place of performance will be at the offeror's facility, with transportation to and from the repair site arranged and paid for by the Navy.
Notice text
2 versions
Update #2 · Latest ·
CONTACT INFORMATION|4|N742.8|WR4CC|7176052982|brittany.a.langletz@navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|Twelve (12)|365||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo |Material - inspect and accept at source|To Be Determined (TBD)|N00104|TBD|Certifications - N45404 Material - TBD |Certi
fications - N45404 Material - SW3215 |TBD|N/A|N/A|N/A|Certifications - N45404 |N/A|N/A|See form DD1423|1-866-618-5988|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1||
VALUE ENGINEERING (JUN 2020)|3||||
EQUAL OPPORTUNITY (SEP 2016)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4|||||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2|||
PROGRESS PAYMENTS (NOV 2021)|4|||||
REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7||||||||
LIST OF AWARD ATTACHMENTS|5|X|3||X|X|
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333914|1300||||||||||||
COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1||
TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JAN 2023))|1||
1. All contractual documents (i.e. contracts, purchase orders, taskorders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
2. Any contract awarded as a result of this solicitation will be DO certified for national defense use under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense,Emergency Preparedness, and
Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
3. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is requiredto accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Requested RTAT: 365 Days
Proposals shall reference the proposed RTAT and any capacity constraints.
Please provide repair price as firm fixed price (FFP. Include repair price with all costs associated with receipt and completerepair of material that may be in unwhole condition, missing hardware,damaged, handling damage, missing parts, wear damage, and CAV
reporting.
All transportation to/from repair site will be paid for by US Navy.
Also, please provide:
Teardown and Evaluation Rate: _________
RTAT: ____________________
Throughput Constraint: ________________
Induction Expiration Date: ______________
4. Price Reduction: Any assets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. Anyassets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment
will be implemented via a reconciliation modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to
the Government's right toterminate for default.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the COMPRESSOR UNIT,REC .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;93236; , drawing ;200134AE; ,and the applicable SUBMEPP Repair Instruction ;5130-012-0682 Rev H CHG 4 (CSD488); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD488, CSD489, CSD490, and CSD491; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
Update #1 ·
CONTACT INFORMATION|4|N742.8|WR4CC|7176052982|brittany.a.langletz@navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001AA|Twelve (12)|365||||||||||||||||||
STOP-WORK ORDER (AUG 1989)|1||
REPAIR DELIVERY (FIRM FIXED PRICE)|1|365|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo |Material - inspect and accept at source|To Be Determined (TBD)|N00104|TBD|Certifications - N45404 Material - TBD |Certi
fications - N45404 Material - SW3215 |TBD|N/A|N/A|N/A|Certifications - N45404 |N/A|N/A|See form DD1423|1-866-618-5988|
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1||
VALUE ENGINEERING (JUN 2020)|3||||
EQUAL OPPORTUNITY (SEP 2016)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2|||
INTEGRITY OF UNIT PRICES (NOV 2021)|1||
EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4|||||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4|||||
EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC (NOV2023))|5||||||
PROGRESS PAYMENTS (NOV 2021)|4|||||
REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021))|7||||||||
LIST OF AWARD ATTACHMENTS|5||||X|X|
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2023))|5||||||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)|13|333914|1300||||||||||||
COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEVIATION 2018-O0015)(MAY 2018))|1||
TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price|
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIEDCOST OR PRICING DATA--BASIC (JAN 2023))|1||
1. All contractual documents (i.e. contracts, purchase orders, taskorders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
2. Any contract awarded as a result of this solicitation will be DO certified for national defense use under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense,Emergency Preparedness, and
Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order.
3. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is requiredto accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Requested RTAT: 365 Days
Proposals shall reference the proposed RTAT and any capacity constraints.
Please provide repair price as firm fixed price (FFP. Include repair price with all costs associated with receipt and completerepair of material that may be in unwhole condition, missing hardware,damaged, handling damage, missing parts, wear damage, and CAV
reporting.
All transportation to/from repair site will be paid for by US Navy.
Also, please provide:
Teardown and Evaluation Rate: _________
RTAT: ____________________
Throughput Constraint: ________________
Induction Expiration Date: ______________
4. Price Reduction: Any assets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. Anyassets for which the contractor does not meet the required RTAT will incur a price reduction of XXXX per unit. This adjustment
will be implemented via a reconciliation modification at the end of contract performance. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to
the Government's right toterminate for default.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the COMPRESSOR UNIT,REC .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;93236; , drawing ;200134AE; ,and the applicable SUBMEPP Repair Instruction ;5130-012-0682 Rev H CHG 4 (CSD488); , except as amplified or
modified herein.
3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction.
3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD488, CSD489, CSD490, and CSD491; in ECDS at https://register.nslc.navy.mil/
4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below.
5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
DATE OF FIRST SUBMISSION=ASREQ
DATE OF SUBSEQUENT SUBMISSION=ASREQ
See CSD (contract support document) called out within paragraph 3 - Requirements.
All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/.
Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Compressor unit, REC, in repair/modification of | Award Notice | |
| This notice | Solicitation | |
| Compressor unit, REC, in repair/modification of | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Compressor unit, REF, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Compressor, rotary | Naval Supply Systems Command | No set-aside | |
| Compressor unit, REC | Naval Supply Systems Command | No set-aside | |
| Cylinder, compressed, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Power unit, gas turb, in repair/modification of | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity