Cold Brook Concrete Paving
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F21Q0084
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Hot Springs, South Dakota 57747, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT 0001 - HAS BEEN GENERATED TO INCLUDE UPDATED DRAWINGS AND DUE DATE MOVED TO 8 SEPTEMBER 2021, 4:00 PM CDT. ATTACHMENTS ARE INCLUDED; PLEASE REVIEW.
Work consists of replacing the existing gravel roadway surface with a 120-foot-long 8-inch-thick, 22-foot-wide concrete jointed pavement with 1” dowels. The side slopes will consist of a 6” thick, epoxy reinforced concrete slope paving at varying slope profiles, protected with rip-rap to prevent undercutting of the concrete. The work also includes grading of and removal of existing gravel and slope stabilization, placement of expansion joint material, riprap, geotextile fabric for the Emergency/Recreational Access to Cold Brook Dam. This project is located at the inflow into Cold Brook Dam near Hot Springs South Dakota.
The purpose of this project is to protect the roadbed over the culvert in the event of flooding. This is the emergency access to flood control gates.
Update #1 ·
Work consists of replacing the existing gravel roadway surface with a 120-foot-long 8-inch-thick, 22-foot-wide concrete jointed pavement with 1” dowels. The side slopes will consist of a 6” thick, epoxy reinforced concrete slope paving at varying slope profiles, protected with rip-rap to prevent undercutting of the concrete. The work also includes grading of and removal of existing gravel and slope stabilization, placement of expansion joint material, riprap, geotextile fabric for the Emergency/Recreational Access to Cold Brook Dam. This project is located at the inflow into Cold Brook Dam near Hot Springs South Dakota.
The purpose of this project is to protect the roadbed over the culvert in the event of flooding. This is the emergency access to flood control gates.
Attachments
| File | Type | Posted |
|---|---|---|
| W9128F21Q0084_Amd0001.pdf | ||
| Am0001 Advertise Drawing Set.pdf | ||
| W9128F21Q0084 - Solicitation.pdf | ||
| CB Concrete Paving Advertisement Set_July 2021 - final.pdf | ||
| Specs W9128F21Q0084 Concrete Paving Cold Brook.pdf | ||
| 01 11 00 Summary of Work.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cold Brook Concrete Paving | Award Notice | |
| Cold Brook Concrete Paving | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity