Notice text

2 versions

Update #2 · Latest ·

The contractor shall procure material and fabricate two (2) each custom steel finish machining fixtures referenced in Section 2.0 Applicable Documents – DWG-1420-0354. The contractor shall not deviate from the required parts list. The fabrication shall be in accordance with requirements annotated within the general notes, fabrication notes, welding notes, and assembly notes listed on page five (5) of the drawing. The contractor shall not deviate from the drawing specifications. The contractor shall deliver both machining fixtures as quickly as possible, but no later than six (6) weeks After Date of Contract (ADC).

The Contractor shall procure material in accordance with (IAW) the List of Materials on page four (4) of the referenced document. No deviation will be acceptable.

The contractor shall fabricate two (2) each custom steel finish machining fixtures in accordance with (IAW) the general notes, fabrication notes, machining and assembly notes detailed on sheet five (5). 

The contractor shall inspect the fixtures in accordance with (IAW) the  Inspection Points (IPs) and Datum Information Table on page three (3) of the referenced document. The contractor shall provide an inspection report containing the results of all inspection point measurements (CDRL A001). No deviation will be acceptable.

The contractor shall, upon completion of fabrication and inspection, coat the top and bottom faces of the fixtures (including the locating pin holes) with a corrosion inhibiting preservative such as LPS-3. Once preserved, ship the machining fixtures to the address referenced in Section 6. The arrival date shall not exceed six (6) weeks After Date of Contract (ADC) Award.

As a part of the Government’s Quality Assurance Program, the Government shall reserve the option to witness any of the manufacturing, testing, machining, or inspection operations conducted by the contractor or the contractor’s subcontractor.

Update #1 ·

The contractor shall procure material and fabricate two (2) each custom steel finish machining fixtures referenced in Section 2.0 Applicable Documents – DWG-1420-0354. The contractor shall not deviate from the required parts list. The fabrication shall be in accordance with requirements annotated within the general notes, fabrication notes, welding notes, and assembly notes listed on page five (5) of the drawing. The contractor shall not deviate from the drawing specifications. The contractor shall deliver both machining fixtures on or before February 14, 2020.

The Contractor shall procure material in accordance with (IAW) the List of Materials on page four (4) of the referenced document. No deviation will be acceptable.

The contractor shall fabricate two (2) each custom steel finish machining fixtures in accordance with (IAW) the general notes, fabrication notes, machining and assembly notes detailed on sheet five (5). 

The contractor shall inspect the fixtures in accordance with (IAW) the  Inspection Points (IPs) and Datum Information Table on page three (3) of the referenced document. The contractor shall provide an inspection report containing the results of all inspection point measurements (CDRL A001). No deviation will be acceptable.

The contractor shall, upon completion of fabrication and inspection, coat the top and bottom faces of the fixtures (including the locating pin holes) with a corrosion inhibiting preservative such as LPS-3. Once preserved, ship the machining fixtures to the address referenced in Section 6 to arrive on or before February 14, 2020.

As a part of the Government’s Quality Assurance Program, the Government shall reserve the option to witness any of the manufacturing, testing, machining, or inspection operations conducted by the contractor or the contractor’s subcontractor.

Files

Notice history

Notice Type Posted
CLB-Finish Machining Fixture Fabrication Award Award Notice
This notice Latest solicitation Solicitation
CLB-Finish Machining Fixture Fabrication Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity