Clarification
Award Notice Posted
- Solicitation number
- W912NR-11-T-0003
- Agency
-
Louisiana National Guard
Army National Guard, Department of Defense
- Awarded
- to Modular Solutions Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W912NR11P0203 Federal contract award
- PSC
- Not on record
- Place of performance
- 159 FW/Lgcv La Air National Guard Base Contracting Office, 400 Russell Ave, NAS-JRB, Bldg 473, Rm 212 New Orleans LA 70143 US
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Added: Jul 08, 2011 10:02 am
Modified: Aug 04, 2011 6:12 pmTrack Changes
Question 12 states, Does the building require a fire alarm and if so, who provides?
Answer: Per SOW Customer will Install
Update #3 ·
Added: Jul 08, 2011 10:02 am
Modified: Aug 04, 2011 9:19 amTrack Changes
24 x 60 Requests for Clarification:
(1) The RFQ calls for "business" occupancy but call the facility "sleeping quarters" and goes on to require that we meet local standards. Local standards require a Louisiana State Label. As sleeping quarters this would require sprinklers, arc fault breakers, smoke detectors and possibly fire alarms and smoke detectors. The state codes would also require ADA restrooms and showers. There isn't enough room for the ADA showers. How do you want to proceed?
Question number 1: There will only be able-bodied personnel using in the
trailer, so ADA showers are not necessary. The trailer will need to be under the
requirements for sleeping quarters.
(2) Section 1.1
E. Roof
1. The roof shall be a gable type pitch with the slope to sides of .5:12 pitch.
The roof cannot be this height because the building would be over 16' and you cannot legally ship a modular building exceeding that height.
We have changed the roof to 3.5/12 pitch is this acceptable? This height would be legal to ship.
Question number 2: 3.5/12 pitch is acceptable.
(3) Page 6 of 31. Section E Roof.
Items 2 and 5.
In order to meet the 2009 IBC codes item 2 Wood Rafter would need to be 2X12
and item 5 Roof Insulation would need to be R-38.
Question number 3: 2x12's and R-38 is acceptable.
(4) Is this a Prevailing Wage job?
Question number 4: Yes(See Additional Documentation)
(5) What surface will the building set on? Concrete? Asphalt? Soil?
Question number 5: Soil
(6) Will the existing bunkhouse be removed by others before we set our building, or do we need to plan on removing the old bldg?
Question number 6: Yes, will be removed prior to delivery of new structure.
(7)Please confirm this is a tax-exempt job? Can we expect to receive a tax-exempt memo?
Question number 7: Tax-Exempt Form is available
(8) Will we be able to place a porta-potty and dumpster inside the Alert Facility? If not how far from the work site will we have to place these things?
Question number 8: No, unable to determine at this time.
(9) Do you want HVAC into the hallway or just into the rooms? To provide direct HVAC into the hallway will require the installation of smoke dampers which is an additional cost.
Question number 9: Only as stated in SOW
(10) Who is to provide property insurance during the term of the lease?
Question number 10: Vendor
(11) Who is to provide maintenance during the term of the lease?
Question number 11: Contractor's Warranty please see SOW
(12) Does the building require a fire alarm and, if so, who provides?
Question number 12: Yes. Contractor
(13) In the floor section when describing the floor joist, does PT mean pressure treated?
Question number 13: Yes
(14) I see that the gov't will be responsible for interior comms as well as the fire alarm system. Who is responsible for installing the fire sprinkler system?
Question number 14: Contractor will provide the Sprinkler System
That question was not really answered on the last clarification sent out. If the contractor is responsible for the fire alarm system, can you provide data on water flow in that area?
Question number 14: This will be provided by Navy DPW
(15) Looking at the floor plan provided in the RFP, there is not a designated mechanical room. Where do you want the fire sprinkler riser pipe to go?
Question number 15: In an area out of the way but ease for maintenance such as utility room
(16) Also, given the amount of overhead tasks the gov't is going to do after the building is set, what do you want us to do for the T-grid ceiling? Please specify overhead tasks by govt.
Question number 16: There should be no overhead tasks by the govt if contractor installs the fire sprinkler system and T-grid ceiling.
(17) In order to determine the finished floor height of the building, we would need to see the benchmark elevation from a surveyor. This would also provide us with the proper information to obtain the pricing for the property insurance.
Question number 17: Recommend blocking the building to the height of existing facility
(18) We don't believe the blocking called out in the RFP will meet local codes to protect against storm surge. Please verify if we are to bid to local codes.
Question number 18: Quote per SOW, however, stub-outs/conduit from the trailers need to easily accessible for connection to existing utilities.
Update #2 ·
Added: Jul 08, 2011 10:02 am
Modified: Aug 03, 2011 5:37 pmTrack Changes
HOW TO SUBMIT PROPOSAL
Proposals and any supportive documentation must be received no later than the closing date and time of this announcement. PROPOSAL FORMAT
DATE:_______________________________________________________________________________;
CONTRACTOR:________________________________________________________________________;
ADDRESS (Street, City, State, Zip code):____________________________________________________________________________;
DUNS Number:_________________________________________________________________________;
Company Contact Name:_________________________________________________________________;
Phone:_______________________________________________________________________________;
Fax: ________________________________________________________________________________;
E-mail:_______________________________________________________________________________;
References for Past Performance. All offerors are required to provide a minimum of two (2) references that can be contacted to validate past performance. References must include company or agency name, current contact and that person's office/business phone number.
1st Reference: __________________________________________________________________________;
2nd Reference: _________________________________________________________________________;
Proposal Line Items:
Line Item #1: Base year, Oct 1, 2011 - Sep 30, 2012 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_____. Extended Price: $______.
Line Item #2: Option year 1, Oct 1, 2012 - Sep 30, 2013 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_____. Extended Price: $______.
Line Item #3: Option year 2, Oct 1, 2013 - Sep 30, 2014 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_______. Extended Price: $______.
Line Item #4: Option year 3, Oct 1, 2014 - Sep 30, 2015 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_______. Extended Price: $______.
Line Item #5: Option year 4, Oct 1, 2015 - Sep 30, 2016 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_______. Extended Price: $______.
Line Item #6: Delivery to zip code 70143, Unit Price/trailer: $_________.
Line Item #7: Set up per SOW at 70143, Unit Price/trailer: $_______.
Line Item #8: Takedown per SOW at 70143, Unit Price/trailer: $_______.
Total of Proposal (Line items 1-8): $________________________.
Update #1 ·
Added: Jul 08, 2011 10:02 am
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
The Louisiana Air National Guard contemplates award of a firm fixed price contract, for the lease of one 24X60 Trailer(Sleeping Facility). The anticipated award date is no later than 30 September 2011. Most questions regarding this requirement can be answered by carefully reviewing the attached Statement of Work (SOW).
Please see additional attachment for Statement ot Work and written Solicitation.
HOW TO SUBMIT A PROPOSAL
Interested parties may submit a proposal using the format below or by completing an SF-18 Request for Quote, available at no charge at www.gsa.gov. All proposals must have the following information: Solicitation: W912NR-11-T-0003 Proposals Due: 01:300 pm Central Standard Time, Friday, August 05, 2011. Please send via FAX (504)391-8372 or Mail 159 MSG/MSC(Attn: MSgt Jaince Hills) NAS-JRB Bldg 473 RM 212, New Orleans, LA 70143
Proposals and any supportive documentation must be received no later than the closing date and time of this announcement. PROPOSAL FORMAT
DATE:_______________________________________________________________________________;
CONTRACTOR:________________________________________________________________________;
ADDRESS (Street, City, State, Zip code):____________________________________________________________________________;
DUNS Number:_________________________________________________________________________;
Company Contact Name:_________________________________________________________________;
Phone:_______________________________________________________________________________;
Fax: ________________________________________________________________________________;
E-mail:_______________________________________________________________________________;
References for Past Performance. All offerors are required to provide a minimum of two (2) references that can be contacted to validate past performance. References must include company or agency name, current contact and that person's office/business phone number.
1st Reference: __________________________________________________________________________;
2nd Reference: _________________________________________________________________________;
Proposal Line Items:
Line Item #1: Base year, Oct 1, 2011 - Sep 30, 2012 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_____. Extended Price: $______.
Line Item #2: Option year 1, Oct 1, 2012 - Sep 30, 2013 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_____. Extended Price: $______.
Line Item #3: Option year 2, Oct 1, 2013 - Sep 30, 2014 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_______. Extended Price: $______.
Line Item #4: Option year 3, Oct 1, 2014 - Sep 30, 2015 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_______. Extended Price: $______.
Line Item #5: Option year 4, Oct 1, 2015 - Sep 30, 2016 (12 month) Lease of 1 trailers per SOW. Unit Price (per month for 1 trailers): $_______. Extended Price: $______.
Line Item #6: Delivery to zip code 70143, Unit Price/trailer: $_________; Extended Price (Unit price x 20): $_________.
Line Item #7: Set up per SOW (including utility hookups) at 70143, Unit Price/trailer: $_______.
Line Item #8: Takedown per SOW (including utility hookups) at 70143, Unit Price/trailer: $_______.
Total of Proposal (Line items 1-8): $________________________.
General Line Item Notes:
1. Offerors shall submit a price for all line items; failure to do so may render the quote unacceptable.
2. Offerors shall submit product literature as specified; failure to do so may render the proposal unacceptable.
3. The Government reserves the right to award on an "all or none basis".
4. The Government reserves the right to exercise any or all of the options, at the prices stated in the schedule, at any time prior to the expiration of the term of the contract.
5. Except when it is determined by the Contracting Officer not to be in the Government's best interest, the Government will evaluate offers for award purposes by calculating the total price for all proposal line items.
Evaluation of options will not obligate the Government to exercise any of the options.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity