Carbon Dioxide (CO2) Fire Suppression System (FSS) integrated into two new Bauer Main Engine Control (MEC) Test Stands

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA812520Q0099
Agency
Air Force Sustainment Center Air Force Materiel Command, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
334419 Other Electronic Component Manufacturing
PSC
6635 Physical Properties Testing And Inspection
Place of performance
Tinker Afb Ok 73145 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks quotes to deliver, install, and provide training for two carbon dioxide fire suppression systems integrated into new Bauer main engine control test stands at Tinker Air Force Base in Oklahoma. The Department of the Air Force Materiel Command Air Force Sustainment Center is procuring these goods and services. Quotes must be submitted by the closing date of August 28, 2020 specified in the solicitation and address pricing, delivery times, and a written statement demonstrating how the offeror will meet the technical evaluation criteria in FAR 52.212-2.

This opportunity is set aside 100% for small businesses under NAICS code 238210 - Electrical Contractors and Other Wiring Installation Contractors. The place of performance will be Tinker Air Force Base in Oklahoma City, Oklahoma. Quotes must provide for the delivery, installation, testing, and operator training for two carbon dioxide fire suppression systems to be integrated into the new test stands over an unspecified period of performance.

Notice text

2 versions

Update #2 · Latest ·

**The solicitations closing date has been extended to 28 AUG 2020, 12:00PM CDT (see attached Amendment)**

This is a solicitation notice for the delivery, installation and training of two Carbon Dioxide Fire Suppression System integrated into two new Bauer Main Engine Control Test Stands . This is a set aside 100% for a small business. FOB Destination is Tinker AFB OK.

Quotes will be accepted on or before the closing date stated on page 1 of the solicitation.

When returning this Standard form 1449, please complete the following:

1.         Please complete Company Information (Name & Address) and CAGE Code in Block 17a.

2.         Please wet sign, put the name and title of signer, and date signed in blocks 30a., 30b., and 30c. respectively.

3.         Please insert pricing on Page 3 along with net amount & delivery times

4.         Please complete information in all “Fill-in” provisions and clauses, especially:

a.          FAR 52.212-3 (when applicable)

b.         FAR 52.225-18

5.      Please provide a written statement to explain how your company is going to meet the technical evaluation criteria listed in FAR Clause 52.212-2.

Update #1 ·

This is a solicitation notice for the delivery, installation and training of two Carbon Dioxide Fire Suppression System integrated into two new Bauer Main Engine Control Test Stands . This is a set aside 100% for a small business. FOB Destination is Tinker AFB OK.

Quotes will be accepted on or before the closing date stated on page 1 of the solicitation.

When returning this Standard form 1449, please complete the following:

1.         Please complete Company Information (Name & Address) and CAGE Code in Block 17a.

2.         Please wet sign, put the name and title of signer, and date signed in blocks 30a., 30b., and 30c. respectively.

3.         Please insert pricing on Page 3 along with net amount & delivery times

4.         Please complete information in all “Fill-in” provisions and clauses, especially:

a.          FAR 52.212-3 (when applicable)

b.         FAR 52.225-18

5.      Please provide a written statement to explain how your company is going to meet the technical evaluation criteria listed in FAR Clause 52.212-2.

Attachments

Files attached to this notice, newest first
File Type Posted
Solicitation Amendment FA812520Q00990001 SF 30.pdf PDF
Solicitation - FA812520Q0099.pdf PDF
Fire Suppression SOW.pdf PDF
Appendix A_Equip List.pdf PDF
Appendix C - Safety.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Carbon Dioxide (CO2) Fire Suppression System (FSS) integrated into two new Bauer Main Engine Control (MEC) Test Stands Award Award Notice
Carbon Dioxide (CO2) Fire Suppression System (FSS) integrated into two new Bauer Main Engine Control (MEC) Test Stands This notice · Latest solicitation Solicitation
Carbon Dioxide (CO2) Fire Suppression System (FSS) integrated into two new Bauer Main Engine Control (MEC) Test Stands Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity