Appendix C - Safety.pdf
PDF 107 KB Posted
- Attached to
- Carbon Dioxide (CO2) Fire Suppression System (FSS) integrated into two new Bauer Main Engine Control (MEC) Test Stands Federal contract opportunity
- Solicitation number
- FA812520Q0099
About this file
This document contains a solicitation notice and safety specifications appendix for a federal contract opportunity. The solicitation seeks quotes by a specified closing date to deliver, install, and provide training for two carbon dioxide fire suppression systems integrated into new bauer main engine control test stands at Tinker Air Force Base in Oklahoma. The opportunity is set aside 100% for a small business. Quotes must include pricing, delivery times, and wet signatures on Standard Form 1449. The safety specifications appendix outlines the contractor's safety program and reporting requirements and lists referenced directives for general industrial operations, material handling equipment, hazardous energy control, confined spaces, welding operations, and fire protection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA812520Q00990001 SF 30.pdf | ||
| Solicitation - FA812520Q0099.pdf | ||
| Fire Suppression SOW.pdf | ||
| Appendix A_Equip List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 2020
APPENDIX C
SAFETY SPECIFICATIONS
INSTALLATION OF FIRE SUPPRESSION SYSTEMS
WITHIN MEC TEST STANDS IN BUILDING 3902 (CSN:
H8TC05-01)
PREPARED BY: OC-ALC/SE
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:
1. Mishap notification/reporting as defined in paragraph B. below.
2. A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.
B. Mishap Notification.
1. The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.
2. Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
3. If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
C. The safety provisions of this contract, shall apply to any subcontracts/subcontractors.
D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.
SECTION II - SAFETY PROGRAM ELEMENTS
The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements
Element/Requirement Referenced Benchmark
Mishap Notification/Reporting AFI 91-204
Housekeeping AFI 91-203
Material Handling Equipment (MHE) AFI 91-203
Handling, Storage and use of AFI 91-203 Flammable/Combustible Liquid
Vehicle Operations AFI 91-207
Tool Control AFI 21-101, AFMC
Sup.
Foreign Object Damage (FOD) AFI 21-101, AFMC
Sup
Tobacco Use in the Air Force AFI 40-102
Hazardous Energy Control AFI 91-203
Confined Spaces AFI 91-203
Welding Operations AFI 91-203
Fire Protection Tinker Instruction 32-2001
SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES
These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.
AFI 91-204 Apr 15 Safety Investigations and Reports
AFI 91-207 May 15 USAF Traffic Safety Program
AFI 91-203 Aug 14 General Industrial Operations
AFI 91-203 Aug 14 Air Force Consolidated Occupational Safety Standard
AFI 91-203 Aug 14 Aircraft Flight Line – Ground Operations and Activities
AFI 21-101 May 15 Aircraft and Equipment Maintenance Management
AFI 21-101, Nov 13 Aircraft and Equipment Maintenance Management AFMC Sup
AFI 40-102 Jul 15 Tobacco Use in the Air Force
AFI 91-203 Aug 14 Confined Spaces
AFI 91-203 Aug 14 Welding, Cutting, and Blazing
Tinker Instruction 32-2001 Oct 09 Fire Protection Program
File details come from the government source that posted it. Updated .