Canopy, movable, in repair/modification of

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .

Solicitation number
N0038320QD075
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333999 All Other Miscellaneous General Purpose Machinery Manufacturing
PSC
J Maint, Repair, Rebuild Equipment

Notice details come from SAM.gov. Updated .

Notice text

CONTACT INFORMATION|4|N721.05|B1F|215-697-5815|CATHY.HUGHES1@NAVY.MIL|

ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X||||||||

REPAIR DELIVERY (FIRM FIXED PRICE)|1|TBD|

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|TBD||TBD|N00383|TBD|TBD|TBD|TBD|||||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|2|WSS|WSS|

FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1||

EQUAL OPPORTUNITY (SEP 2016)|2|||

EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)|4|||||

EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUL 2014)|2|||

FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)|10|X|X|45|45| ||||X|X|

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JUN 2019)|11||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (NOV 2014))|5||||||

BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (NOV 2014)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2018)|12|336413|1250|||||||||||

REPRESENTATION REGARDING CERTIAN TELECOMMUNICATIONS AND VIDEO SUREILLANCESERVICES OR EQUIPMENT (AUG 2019))|2| ||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A1A |DO-A1A|

EVALUATION OF FIRST ARTICLE TESTING|5|||X|||

EVALUATION CRITERIA AND BASIS FOR AWARD -|1||

All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or

sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein.

Early and incremental deliveries accepted.

\

1. SCOPE

1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.

1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be

provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this

procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.

1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by

IPC/EIAJ-STD-001C paragraph 5.1.4.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

REPAIR/ OVERHAUL SHALL BE IN ACCORDANCE WITH THE STATEMENT OF WORK DATED

26 JULY 2019 REVISION A.

HARD COPY SOW CAN BE OBTAINED FROM N231 SOURCE DEVELOPMENT.

All critical processes contained within SOW will be certified and approved through successful completion of First Article Inspection/Test (FAI/FAT) by F18FST Structures Engineering.F18 FST Structures Engineering and NAVSUP

engineering will witness FAI/FAT. The capability to successfully complete

FAI/FATdemonstratesoverhaul/repair facilities ability to process P/N 74A350004-2025.

4. QUALITY ASSURANCE

REPAIR AND INSPECTION IAW SOW

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.

Block 9: Statement B, US Government, Naval Inventory Control Point

Block 12: First submission to be made upon submission of ;FAT; testing sample.

^ Block 14: Make submission to ;DCMA

NAVSUP WSS

NAVAIR; .

Block 13: Second submission required if the process/operation changes after approval of ;FAT; test.

^^ Block 14: Make submission to ;DCMA

NAVAIR

NAVSUP WSS; .

Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.

Block 9: Statement B, US Government, Naval Inventory Control Point

Block 12: First submission to be made upon submission of ;FAT; testing sample.

^ Block 14: Make submission to ;DCMA

NAVAIR

NAVSUP WSS; .

Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

A REQUEST FOR VARIANCE IS REQUIRED FOR ANY DEVIATION OR WAIVER ENCOUNTERED DURING ANY PORTION OF MANUFACTURE. THIS MUST BE ROUTED TO THE ACO AND DCMA-OFFICE. THE FORM IS DD-1694 AND THE DCMA SHALL PROVIDE A FORM DD-1698.THE RFV MUST GO TO THE CONTRACTING OFFICER

AT NAVSUP WSS FOR REVIEW AND THEN FORWARDED TO THE BASIC DESIGN ENGINEER FOR REVIEW AND DETERMINATION.

DATE OF FIRST SUBMISSION=ASREQ

DATE OF SUBSEQUENT SUBMISSION=ASREQ

Paragraphs 10.1, 10.2, 10.2.1, 10.2.2, 10.2.4 and 10.5 apply.

Block 9: Statement B, US Government, Naval Inventory Control Point

Block 14: When NAVICP 02 is referenced in distribution, forward to the NAVICP code cited on Block 10.A. on page 1.

Block 3: Separate reports shall be provided for the below listed subtitles and shall include certification that all vendors performing these processes are prime (OEM) approved sources. In the case where other than the OEM's specifications are to be utilized,

separate certifications are required.

BLOCK #5: Contract Reference:

;CERTIFICATION OF COMPLIANCE TO ALL MANUALS AND SOW;

Notice history

Notice Type Posted
Canopy, movable, in repair/modification of Award Award Notice
Canopy, movable, in repair/modification of Latest pre-solicitation Pre-Solicitation
This notice Original Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity