CA FTNP SEKI 10(10) Generals Highway

Awarded Award Notice Posted

Solicitation number
DTFH6817B00007
Agency
Federal Highway Administration Department of Transportation
Awarded
to L.b. Civil Construction, Incorporated
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6817C00019 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Sequoia / Kings Canyon National Park Tulare County, California 93262, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Mar 14, 2017 3:59 pm Modified: Mar 14, 2017 6:01 pmTrack Changes

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENTATIVE ADVERTISEMENT DATE IS MARCH 29th, AND WILL BE ADVERTISED ON A FULL AND OPEN BASIS

CA FTNP SEKI 10(10) Generals Highway Project Description:


This project consists of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.4 miles of roadway within Sequoia and Kings Canyon National Park, Tulare County, California. 0.96 miles of Generals Highway will be reconstructed from Deer Ridge to Eleven Range and 1.4 miles of Wolverton Road including the parking lot will be rehabilitated under this project. The terrain is mountainous with the elevation for the Generals Highway work ranging between 4,500 and 5,500 feet and Wolverton Road work ranging between 6,900 and 7,300 feet.


The estimated price range is between $8,000,000 and $12,000,000. The anticipated advertisement date is March 2017 with construction anticipated from May 2017 to October 2018.


Principle work items include (estimated):
9,800 square feet of reinforced concrete retaining wall (4 feet to 14 feet high),
9,100 tons of asphalt concrete pavement,
1,700 linear feet of steel bridge rail,
200 cubic yards of structural concrete,
4,600 tons of aggregate base, 
3,900 cubic yards of roadway excavation and 4,900 cubic yards of waste,
6,100 linear feet of concrete curb, and
600 linear feet of micropiles


All of the work is occurring in natural resource sensitive areas.  Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction.

Update #1 ·

Added: Mar 14, 2017 3:59 pm

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENTATIVE ADVERTISEMENT DATE IS MARCH 29th, AND WILL BE ADVERTISED ON A FULL AND OPEN BASIS

CA FTNP SEKI 10(10) Generals Highway Project Description:


This project consists of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 2.4 miles of roadway within Sequoia and Kings Canyon National Park, Tulare County, California. 0.96 miles of Generals Highway will be reconstructed from Deer Ridge to Eleven Range and 1.4 miles of Wolverton Road including the parking lot will be rehabilitated under this project. The terrain is mountainous with the elevation for the Generals Highway work ranging between 4,500 and 5,500 feet and Wolverton Road work ranging between 6,900 and 7,300 feet.


The estimated price range is between $8,000,000 and $12,000,000. The anticipated advertisement date is February 2017 with construction anticipated from May 2017 to October 2018.


Principle work items include (estimated):
9,800 square feet of reinforced concrete retaining wall (4 feet to 14 feet high),
9,100 tons of asphalt concrete pavement,
1,700 linear feet of steel bridge rail,
200 cubic yards of structural concrete,
4,600 tons of aggregate base, 
3,900 cubic yards of roadway excavation and 4,900 cubic yards of waste,
6,100 linear feet of concrete curb, and
600 linear feet of micropiles


All of the work is occurring in natural resource sensitive areas.  Construction phasing, temporary traffic control, and timely completion of construction will be crucial to minimize disruptions to park visitors throughout construction.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid_Opening_Summary_CA_FTNP_SEKI_10(10).pdf PDF
Q&A_SEKI_10(10)_5-2-17.pdf PDF
Q&A_SEKI_10(10).pdf PDF
Amendment_A001.pdf PDF
CA_SEKI_10(10-11)_Final_Hydraulics_Report.pdf PDF
Final_Pave_Recomm_Memo_.pdf PDF
SEKI10(10)_Cross_Sections.pdf PDF
SEKI10(10)_Plans.pdf PDF
CA_.PRA.SEKI.10(10)_Sequoia_National_Park,_Geotech._2012.pdf PDF
DTFH6817B00007_CA_FTNP_SEKI_10(10)_IFB.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity