DTFH6817B00007_CA_FTNP_SEKI_10(10)_IFB.pdf
PDF 2 MB Posted
- Attached to
- CA FTNP SEKI 10(10) Generals Highway Federal contract opportunity
- Solicitation number
- DTFH6817B00007
About this file
Invitation for Bid (IFB) for CA FTNP SEKI 10(10), Generals Highway.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary_CA_FTNP_SEKI_10(10).pdf | ||
| Q&A_SEKI_10(10)_5-2-17.pdf | ||
| Q&A_SEKI_10(10).pdf | ||
| Amendment_A001.pdf | ||
| CA_.PRA.SEKI.10(10)_Sequoia_National_Park,_Geotech._2012.pdf | ||
| SEKI10(10)_Plans.pdf | ||
| CA_SEKI_10(10-11)_Final_Hydraulics_Report.pdf | ||
| Final_Pave_Recomm_Memo_.pdf | ||
| SEKI10(10)_Cross_Sections.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER: DTFH6817B00007
SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED)
PROJECT NUMBER: CA FTNP SEKI 10(10)
PROJECT NAME: GENERALS HIGHWAY
BID OPENING DATE:
See Page A-1, Item 13A
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-03 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: http://www.fbo.gov E-mail: CFLContracts@dot.gov
PROJECT CA FTNP SEKI 10(10)
LOCATION SEQUOIA AND KINGS CANYON
NATIONAL PARKS
COUNTY TULARE COUNTY
STATE CALIFORNIA
LENGTH SCHEDULE A: 2.39 MILES
TYPE OF IMPROVEMENT ROAD RECONSTRUCTION, RETAINING
WALLS, GUARDRAIL, CANTILVERED
VIADUCTS, DRAINAGE, AND HOT
ALPHALT PAVEMENT
TABLE OF CONTENTS
Notice to Bidders ............................................................................................................. A-i
Solicitation, Offer, and Award ........................................................................................ A-1
Basis for Award and Bid Schedule ................................................................................ A-5
Solicitation Provisions .....................................................................................................B-7
Contract Clauses ..............................................................................................................C-1
Construction Wage Rate Requirement ............................................................................ D-1
Division 100 ..................................................................................................................... E-1 Division 150 ................................................................................................................... E-30 Division 200 ................................................................................................................... E-58 Division 300 ................................................................................................................... E-70 Division 400 ................................................................................................................... E-73 Division 500 ................................................................................................................. E-102 Division 600 ................................................................................................................. E-126 Division 700 ................................................................................................................. E-151
APPENDICES
Appendix A ............................................................................................................. Fire Plan
Appendix B .......................................................................................................... 404 Permit
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
NOTICE TO BIDDERS
A-i
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Please submit the following with your bid:
Submit the following documents with your Bid Package–
SF-1442, Solicitation, Offer & Award, Pages A-1 and A-2;
If applicable, indication of interest in formal Partnering, Page A-5;
Bid Schedule including Buy American Act & Hazardous Materials, Pages A-6 through A- 13;
Bid Guarantee (see FAR Clause 52.228-1), Pages B-1 and B-2. Bid bonds must be originals with original signatures and corporate seals. Photocopies and Faxed copies are NOT acceptable and will make your bid non-responsive;
Completed the VETS-4212 declaration, Page A-ii; Bidders’ Information, Pages B-3 through B-6;
Annual Representations and Certifications (FAR Provision 52.204-8) and Certification Regarding Responsibility Matters (FAR Provision 52.209-5); and
HUBZone small business concerns electing to waive the evaluation preference, complete 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns, Section C.
Bidders should retain all other pages for their information. Bids should be submitted in a sealed enveloped and include the Contractor’s Name, Solicitation Number and the Project Number/Name.
I. PRE-BID INFORMATION
It is the responsibility of the bidder to verify that this solicitation document, including the plans, are complete as listed in the table of contents and the index to sheets. Plan sheets can be found at http://www.fbo.gov and viewed by individual sections, downloaded by individual sections, or the entire plan set downloaded in a zip file. Physical data relevant to this solicitation may also be viewed or downloaded at the above site.
This solicitation and subsequent contract are governed by the Federal Acquisition Regulations (FAR), agency supplemental regulations, and the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03.
The FP-03 was utilized for the design of this project. Paper copies of the FP-03 will not be provided to bidders or the awarded Prime Contractor. The FP-03 is available electronically at https://flh.fhwa.dot.gov/resources/specs/ . A single paper copy can be obtained from the Research & Technology Distribution Center (RTPDC) by email report.center@dot.gov .
Applicable FAR provisions and clauses in this IFB are incorporated by reference or full text. FAR provisions and clauses incorporated by reference can be accessed on the Internet at:
A-ii http://farsite.hill.af.mil/vffara.htm.
Notice of SAM Registration – you must register in the System for Award Management (SAM – replaced CCR) prior to award of a contract resulting from this solicitation. Failure to register prior to contract award may require award to the next successful registered offeror. See FAR Subpart 4.1103(c). Register online at www.sam.gov.
Representations and Certifications – This solicitation is issued under NAICS 237310 – Highway, Street & Bridge Construction with a small business size standard of $36.5 million. If your average annual gross receipts for the past 3 years are above $36.5 million, you are a large business for this solicitation. If they are below $36.5 million you are a small business. Please complete the certification listed in paragraph (b) of FAR Provision 52.204-8 Annual Representation and Certifications. The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA, and EPLS. Please include NAICS 237310 in SAM. Please include NAICS 237310 in your SAM. Before submitting bids, please ensure you have completed your annual representations and certifications electronically at the SAM website at www.sam.gov.
Vets-4212 Reporting: - The Contractor must complete the report if required. See reporting requirements at: www.dol.gov/vets/programs/fcp/main.htm.
My firm had a qualifying Federal Contract in 2016 and has complied with the reporting requirements.
My firm did not have a qualifying Federal Contract in 2016 and is therefore exempt from the reporting requirements
This Solicitation Contains a Price Evaluation Factor - The Government will apply a factor of 10% to an apparent low bid submitted by a large business when we also receive a bid from a certified HUBZone small business concern. The 10% factor does not apply to apparent low bids submitted by small businesses. See FAR Clause 52.219-4 Notice of price evaluation preference for HUBZone small business concerns.
In the event this full and open competition results in a contract award to a qualified HUBZone SBC after a price evaluation preference, FAR Clause 52.236-1, Performance of Work by the Contractor does not apply.
§126.700 of the Code of Federal Regulations (Title 13, Part 126, Subpart G), stated below, will replace the performance of work requirements stated in the above mentioned FAR clause.
A qualified HUBZone SBC receiving a contract under this solicitation for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
A-iii
Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart
102.03 of the FP-03. Bid bonds must be originals and have original signatures and corporate seals.
Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.
ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:
http://osdbuweb.dot.gov.
Accuracy and Completeness of Bid- The Contractor is fully responsible to verify that all data is correct when an offer is submitted. Failure to properly update your data may cause the offer to be rejected.
Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON APRIL 28, 2017
Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov
Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.
For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.
FAX Number to submit modifications to bids for this project is (720) 963-3360
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.
A-iv
Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.
FAR Clause 52.219-9, Small Business Subcontracting Plan, Alternate I, requires that the large business concern who is the successful low bidder on a Federal project with an anticipated award amount exceeding $1 million, is required to submit a subcontracting plan prior to contract award.
The subcontracting plan expresses goals in terms of percentages of total planned subcontracting dollars for the use of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns as subcontractors. If the apparent successful low bidder fails to submit an acceptable subcontracting plan acceptable to the CO within 7 days of bid opening, that bidder may be ineligible for award of the contract.
Prime Contractors, who are large businesses, are encouraged to post sources sought notices at the Small Business Administration’s Subcontracting Network (SUB-NET) http://web.sba.gov/subnet/ so that small businesses can identify opportunities in their areas of expertise. The use of SUB-Net fulfills the requirements set forth in Federal Acquisition Regulation (FAR) 5.206, Notice of Subcontracting Opportunities, for contractors and subcontractors to post notices and thereby increase competition for subcontracts.
A list of currently known business concerns owned and controlled by socially and economically disadvantaged individuals and/or women-owned small business concerns that have indicated an interest in participating in highway construction is available at http://www.sam.gov.
NOTE:
Consider the following FHWA small business goals in development of Subcontracting plans and efforts:
FHWA Small Business Goals (As of FY 2017) Business Size Goal (%)
SB 50.0%
SDB 5.0%
HUBZone 3.0%
WOSB 5.0%
SDVOSB 3.0%
Insurance requirements - See Subsection 107.05 of the FP-03.
A-1
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6817B00007
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
04/04/2017
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
CA FTNP SEKI 10(10), Generals Highway
7. ISSUED BY:
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS BID TO:
Jeremiah Rogers, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-03, U.S. CUSTOMARY UNITS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-03 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 5/04/17 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53-236-1(e)
X
X
X
X
X
A-2
GPO: 1985 0 - 469-796 STANDARD FORM 1442 PAGE 2 (REV. 4-85)
OFFEROR (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
DUNS NO.
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing with calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
SEE INDIVIDUAL BID SCHEDULE(S)
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED
TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 27
(4 copies unless otherwise specified)
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
□ 15 U.S.C. 637( ) □ 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE:
27. PAYMENT WILL BE MADE BY
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by
(a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON
AUTHORIZED TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD
DATE
A-3
Item 8: LOCATION OF PUBLIC BID OPENING: Offers must be received by designated date and time as stated in Item 13A.
Item 9: FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.
FOR TECHNICAL INFORMATION (plans and specifications): Questions must be submitted in writing by e-mail at CFLContracts@dot.gov .
FOR PHYSICAL DATA: The following data is available electronically with this solicitation:
2012 Geotech Report
Final Hydraulics Report
Final Pavement Recommendations Memo
Item 11: COMPLETION DATE: Work shall be completed on or before the date specified in Subsection 108.01 of the SCRs.
Item 12A: PERFORMANCE AND PAYMENT BONDS: See FAR Clause 52.228-15
Performance and Payment Bonds-Construction (Clauses begin on Page C-1) and Subsection 102.06 of the FP-03.
Item 13B: BID BOND AMOUNT: See FAR Provision 52.228-1 Bid Guarantee
(Provisions begin on Page B-1) and Subsection 102.03 Bid Guarantee of the FP-03. All bid guarantees must have original signatures with original corporate seals.
Item 19: ACKNOWLEDGMENT OF AMENDMENTS: FAILURE TO
ACKNOWLEDGE AMENDMENTS, IN ITEM 19 OF THE SF-1442, BY THE
DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION
MAY RESULT IN REJECTION OF YOUR BID. If amendments are issued, they will be posted to www.fbo.gov.
Item 24: SUBMITTING INVOICES: See Subsection 109.08 Progress Payments of the
FP-03.
ESTIMATED
PRICE: The price range of the project work is anticipated to be between $8 million and $12 million.
A-4
Bid Schedule Instructions
BIDDERS, PLEASE NOTE: This Bid Proposal is comprised of one schedule. Before preparing the bid, carefully read the Solicitation Provisions and the following:
• Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government
• Multiply the unit price by the quantity for each pay item and show the amount bid.
When the words “Lump Sum” appear as a unit bid price, insert an amount for each lump sum pay item.
• Total all amounts bid for each pay item and show the Construction Cost Total on the space provided on the last page of each schedule or option.
NOTE: If the amount bid for a pay item is inconsistent with the product of the unit price provided by the bidder and the quantity provided by the Government, the unit price will govern and the Government will determine a corrected amount bid for the pay item by multiplying the unit price by the quantity.
Pay Item 15401-0000, Contractor testing
Bidders must provide a price on an alternative Contractor Testing pay item.
Bidders must provide a price for Contractor Testing using a Contractor-furnished field laboratory for schedule A. The price for this item will be included in the Construction Cost Total for Schedule A.
Bidders must also provide a stand alone price on the last page of the bid schedule for the alternative item, Contractor Testing using a Government-furnished field laboratory. This price will not be factored into the evaluation for award.
The Government retains the discretion to award a contract which includes either of the alternative Contractor Testing items at the respective bid price.
Basis for Award
To be eligible for award of contract, the offeror shall submit prices for each item necessary to complete all contract work in Schedule A. Accordingly, award of contract, if made, will be made to the lowest responsive, responsible bidder, if funds are available.
A-5
Partnering
A Partnership recognizes the Government and the Contractor are both responsible and can affect the successful completion of this project. Partnering is a vehicle to ensure the partnership has structure and quality. It recognizes the strengths of each party and uses those strengths to identify and achieve shared goals. One of the primary objectives of Partnering is to facilitate the resolution of disputes in a timely, professional, and non-adversarial manner with the outcome focused on achieving those shared goals.
CFLHD supports the concepts and tenets of Partnering and as such is encouraging the Contractors and it’s subcontractors to establish a Partnering relationship on this project.
A formal Partnering meeting can help facilitate this relationship by helping do document the parties’ common purpose and goals, and ensuring alignment. The goals are mutually agreed upon and address effective and efficient performance within the scope of the contract.
Participation in a formal Partnering meeting is voluntary. Costs of implementing and maintaining the partnership would be agreed to by both parties as described in Subsection 103.05 Partnering of the FP-03. Costs of partnering would be in addition to the contract award amount.
Please indicate your desire to participate in a formal partnering meeting on this project.
(___) We would like to participate in a formal partnering meeting.
(___) We do not want to participate in a formal partnering meeting.
B I D S C H E D U L E Schedule A Account: ALL
Project No: CA FTNP SEKI 10(10)
Name: Generals Highway CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line A0020 ALL LPSM $
15206-0000 Line A0040 50.440 STA $ $
15210-3000 Line A0060 75.710 STA $ $
15214-1000 Line A0080 ALL LPSM $
15214-2000 Line A0100 ALL LPSM $
15214-3000 Line A0120 ALL LPSM $
15215-3000 Line A0140 14 EACH $ $
15216-2000 Line A0160 100.880 STA $ $
15301-0000 Line A0180 ALL LPSM $
15401-0000 Line A0200 ALL LPSM $
15501-0000 Line A0220 ALL LPSM $
15705-0100 Line A0240 5,300 LNFT $ $
15706-0200 Line A0260 45 EACH $ $
15706-1000 Line A0280 8 EACH $ $
15802-0000 Line A0300 ALL LPSM $
20101-0000 Line A0320 4.1 ACRE $ $
20304-1000 Line A0340 ALL LPSM $
20310-1000 Line A0360 1 EACH $ $
20401-0000 Line A0380 3,900 CUYD $ $
Schedule Total: ________________________
Submitted by: _________________________
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
PLUG, EXISTING PIPE
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, BRIDGE
SURVEY AND STAKING, RETAINING WALL
SURVEY AND STAKING, PARKING AREA (PULLOUTS)
ROADWAY EXCAVATION
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION
WATERING FOR DUST CONTROL
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING (using Contractor-Furnished Field Laboratory)
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
Jeremiah.Rogers Typewritten Text A-6
Project No: CA FTNP SEKI 10(10)
Name: Generals Highway CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
20441-0000 Line A0400 4,900 CUYD $ $
25201-1000 Line A0420 80 CUYD $ $
25305-2000 Line A0440 150 SQYD $ $
25801-0100 Line A0460 510 SQFT $ $
25801-0200 Line A0480 2,420 SQFT $ $
25801-0300 Line A0500 2,620 SQFT $ $
25801-0400 Line A0520 2,920 SQFT $ $
25801-0500 Line A0540 880 SQFT $ $
25801-0600 Line A0560 430 SQFT $ $
30305-4000 Line A0580 75.710 STA $ $
30306-4000 Line A0600 16,500 SQYD $ $
30802-2000 Line A0620 4,600 TON $ $
40201-4700 Line A0640 9,100 TON $ $
40205-3000 Line A0660 90 TON $ $
41103-0000 Line A0680 49,600 SQYD $ $
41105-0000 Line A0700 70 TON $ $
41201-1000 Line A0720 21 TON $ $
55201-0200 Line A0740 191 CUYD (CQ) $ $
55401-1000 Line A0760 2,400 LB (CQ) $ $
STRUCTURAL CONCRETE, CLASS A (AE)
REINFORCING STEEL
PRIME COAT
BLOTTER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
REINFORCED CONCRETE RETAINING WALL, 14 FEET
PULVERIZING, 8-INCH DEPTH
PULVERIZING, 8-INCH DEPTH
REVET MATTRESS, POLYVINYL CHLORIDE COATED
REINFORCED CONCRETE RETAINING WALL, 4 FEET
REINFORCED CONCRETE RETAINING WALL, 6 FEET
ROADWAY AGGREGATE, METHOD 2
HOT ASPHALT CONCRETE PAVEMENT, HVEEM TEST, CLASS B, GRADING C OR E
ANTISTRIP ADDITIVE, TYPE 3
WASTE
SPECIAL ROCK EMBANKMENT, MECHANICALLY-PLACED
REINFORCED CONCRETE RETAINING WALL, 8 FEET
REINFORCED CONCRETE RETAINING WALL, 10 FEET
REINFORCED CONCRETE RETAINING WALL, 12 FEET
Jeremiah.Rogers
A-7
Project No: CA FTNP SEKI 10(10)
Name: Generals Highway CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
55401-2000 Line A0780 32,900 LB (CQ) $ $
55601-0900 Line A0800 1,664 LNFT (CQ) $ $
55901-0000 Line A0820 457 SQYD (CQ) $ $
56202-0000 Line A0840 ALL LPSM $
56901-0000 Line A0860 575 LNFT $ $
56905-0000 Line A0880 2 EACH $ $
56906-0000 Line A0900 3 EACH $ $
60101-0000 Line A0920 25 CUYD $ $
60103-0100 Line A0940 1 EACH $ $
60103-0140 Line A0960 3 EACH $ $
60103-0160 Line A0980 1 EACH $ $
60201-0800 Line A1000 415 LNFT $ $
60201-0900 Line A1020 40 LNFT $ $
60201-1200 Line A1040 60 LNFT $ $
60210-0800 Line A1060 7 EACH $ $
60210-0900 Line A1080 1 EACH $ $
60210-1000 Line A1100 1 EACH $ $
60210-1200 Line A1120 1 EACH $ $
60403-0000 Line A1140 8 EACH $ $
END SECTION FOR 36-INCH PIPE CULVERT
END SECTION FOR 48-INCH PIPE CULVERT
INLET
CONCRETE, HEADWALL FOR 30-INCH PIPE CULVERT (EXPOSED AGGREGATE)
24-INCH PIPE CULVERT
30-INCH PIPE CULVERT
48-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 30-INCH PIPE CULVERT
MICROPILES
MICROPILE LOAD VERIFICATION TEST
MICROPILE PROOF LOAD TEST
CONCRETE (FOUNDATION MODIFICATION)
CONCRETE, HEADWALL FOR 18-INCH PIPE CULVERT (EXPOSED AGGREGATE)
CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT (EXPOSED AGGREGATE)
REINFORCING STEEL, EPOXY COATED
BRIDGE RAILING, STEEL
MEMBRANE WATERPROOFING
TEMPORARY SUPPORT STRUCTURE
Jeremiah.Rogers
A-8
Project No: CA FTNP SEKI 10(10)
Name: Generals Highway CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
60405-0000 Line A1160 2 EACH $ $
60409-0000 Line A1180 2 EACH $ $
60704-0000 Line A1200 15 EACH $ $
60707-0500 Line A1220 85 LNFT $ $
60707-0700 Line A1240 60 LNFT $ $
60901-0200 Line A1260 265 LNFT $ $
60901-0800 Line A1280 360 LNFT $ $
60901-1200 Line A1300 5,500 LNFT $ $
60908-1000 Line A1320 1,250 SQYD $ $
61108-1000 Line A1340 4 EACH $ $
61302-0000 Line A1360 1 EACH $ $
61701-1950 Line A1380 1,177 LNFT $ $
61702-0000 Line A1400 2 EACH $ $
61702-0800 Line A1420 4 EACH $ $
61707-0000 Line A1440 375 LNFT (CQ) $ $
61904-0000 Line A1460 1 EACH $ $
62003-0000 Line A1480 ALL LPSM $
62011-0500 Line A1500 1 EACH $ $
62028-1000 Line A1520 1 EACH $ $
BOLLARD POST
STONE MASONRY (CRENELLATED WALL REPAIR)
STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
REMOVE AND RESET STONE MASONRY HEADWALL
ADJUST WATER VALVE
SIMULATED STONE MASONRY TEST WALL
GUARDRAIL SYSTEM G4, TYPE 4, CLASS B STEEL POSTS
TERMINAL SECTION
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
LINING 24-INCH PIPE CULVERT
LINING 36-INCH PIPE CULVERT
CURB, CONCRETE, 4-INCH DEPTH
CURB, CONCRETE, 10-INCH DEPTH
CURB, CONCRETE, 14-INCH DEPTH
PAVED DITCH, ASPHALT
MANHOLE ADJUSTMENT
INLET TOP, METAL GRATE
CLEANING CULVERT IN PLACE
Jeremiah.Rogers
A-9
Project No: CA FTNP SEKI 10(10)
Name: Generals Highway CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
62201-0200 Line A1540 100 HOUR $ $
62201-0350 Line A1560 120 HOUR $ $
62201-0950 Line A1580 60 HOUR $ $
62201-2050 Line A1600 60 HOUR $ $
62201-2850 Line A1620 60 HOUR $ $
62201-3000 Line A1640 120 HOUR $ $
62301-0000 Line A1660 170 HOUR $ $
62302-0100 Line A1680 20 HOUR $ $
62302-1000 Line A1700 50 HOUR $ $
62302-1100 Line A1720 100 HOUR $ $
62407-0000 Line A1740 540 CUYD $ $
62901-0000 Line A1760 37 SQYD $ $
63302-0000 Line A1780 110 SQFT $ $
63308-0000 Line A1800 72 EACH $ $
63316-1000 Line A1820 6 EACH $ $
63404-0200 Line A1840 330 GAL $ $
63501-1000 Line A1860 ALL LPSM $
63501-2000 Line A1880 ALL LPSM $
63502-0700 Line A1900 50 EACH $ $
REMOVE AND RESET SIGN
PAVEMENT MARKINGS, TYPE B
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, CONE
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
PLACING CONSERVED TOPSOIL
ROLLED EROSION CONTROL PRODUCT
SIGN SYSTEM
OBJECT MARKER
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
ROLLER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, SLOPE SCALING
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
BACKHOE
Jeremiah.Rogers
A-10
Project No: CA FTNP SEKI 10(10)
Name: Generals Highway CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
63502-1050 Line A1920 50 EACH $ $
63502-1300 Line A1940 100 EACH $ $
63502-1600 Line A1960 4 EACH $ $
63502-2000 Line A1980 4 EACH $ $
63503-0300 Line A2000 32 LNFT $ $
63503-0400 Line A2020 2,400 LNFT $ $
63503-0700 Line A2040 10,100 LNFT $ $
63504-1000 Line A2060 600 SQFT $ $
63506-0500 Line A2080 4,600 HOUR $ $
63506-0600 Line A2100 2,300 HOUR $ $
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN (GOVERNMENT FURNISHED)
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
Jeremiah.Rogers Typewritten Text A-11
Jeremiah.Rogers Typewritten Text
TOTAL: $_________________
Jeremiah.Rogers Typewritten Text Schedule A Alternate Bid Item 15401-0000, Contractor Testing (Government-Furnished lab trailer)* $_________________ *See Page A-4 of this Solicitation for an explanation of how to bid this item.
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers
A-12
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-11 Paragraph (c) & (d) and FAR Provision 52.225-12 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-13
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
B-1
BID BOND
(See instructions on reverse)
DATE BOND EXECUTED (Must not be later than bid opening date)
OMB NO. 9000-0045
Expiration Date: 7/31/19
Public reporting burden for this collection of information is estimated to average 25 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat (MVR), Federal Acquisition Policy Division, GSA, Washington, D.C. 20405.
PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION (AX@ one)
INDIVIDUAL PARTNERSHIP
JOINT VENTURE CORPORATION
STATE OF INCORPORATION
SURETY(IES) (Name and business address)
PENAL SUM OF BOND BID IDENTIFICATION
PERCENT OF
BID PRICE AMOUNT NOT TO EXCEED
BID DATE INVITATION NO.
DTFH6817B00007
20 PERCENT
MILLION(S)
THOUSAND(S) HUNDRED(S) CENTS FOR (Construction, Supplies or Services) CONSTRUCTION
OBLIGATION:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum “jointly and severally” as well as “severally” only for the purpose of allowing a joint action or actions against any or all of
us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
CONDITIONS:
The Principal has submitted the bid identified above.
THEREFORE:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty
(60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) are waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
WITNESS:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
PRINCIPAL
SIGNATURE(S)
1.
(Seal)
2.
3.
Corporate
Seal
NAMES(S) &
TITLE(S)
(Typed)
2. 3.
INDIVIDUAL SURETY(IES)
2.
(Seal)
NAME(S)
CORPORATE SURETY(IES)
NAME &
ADDRESS
STATE OF INCOPORATION LIABILITY LIMIT($)
SURETY A
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 24 (Rev. 8/2016) Previous edition is usable Prescribed by GSA - FAR (48 CFR) 53.228(a)
B-2
CORPORATE SURETY(IES) (Continued)
STATE OF INC. LIABILITY LIMIT ($)
SURETY B
SURETY C
SURETY D
SURETY E
SURETY F
SURETY G
INSTRUCTIONS
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated “Principal” on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed 3,000,000.00 dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury=s list of approved sureties and must act within the limitation listed therein. Where more than one corporate surety is involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed “CORPORATE SURETY(IES).” In the space designated “SURETY(IES)” on the face of the form, insert only the letter identification of the sureties.
(b) Where individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28), for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capacity.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word “Corporate Seal”;
and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms “bid” and “bidder” shall include “proposal” and “offeror.”
STANDARD FORM 24 (Rev. 8/2016) BACK
B-3
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BIDDER'S INFORMATION
INSTRUCTIONS: Answer all questions on this form inserting "none" or "not applicable" where appropriate. If more space is required attach additional sheets. Return the signed, dated and completed form with the bid to the address shown in the invitation for bids on or before the time set for bid opening. The prospective bidder shall provide any additional information requested by the Government during evaluation of the bids.
If the prospective bidder is a joint venture or general partnership, a separate Bidder's Qualifications form shall be provided individually for each joint venture participant or partner.
1. Name and address of business:
Name DUNS Number (See FAR Provision 52.204-6)*
Street Home Office Congressional District (Insert District #) *
City State Zip Code
* Necessary for Government reporting purposes only
To obtain a Dun & Street number, call
County 800-333-0505.
Telephone Number (Include Area Code)
Fax Number (Include Area Code) E-mail address
2. a. Type of organization (check appropriate box):
If a Foreign entity:
Individual
Non-profit organization
Corporation
Partnership
Joint Venture
Registered in:
b. Size and type of Business Concern (check appropriate boxes):
Large Business Concern
Small Disadvantaged Business Concern
Emerging Small Business
Small Business Concern
Women-Owned Small Business
SBA 8(a) Certified
HUB Zone Business Concern
Veteran Owned Business Concern
Service-Disabled Veteran-Owned Business Concern
Individual
Non-profit organization
Corporation
Partnership
Joint Venture Incorporated in:
B-4
3. If a joint venture or general partnership:
a. Provide the name under which the project will be bid, the home office address, and name of the principal who will represent the company with regard to this project if different from "1." above.
Principal
Business Name
Street
City State Zip Code
b. Provide the name and home office addresses of each of the joint venture partners; indicate which partner is the sponsoring partner. Attach a separate sheet for additional partners.
Sponsoring Partner Other Partner
Street Street
City State Zip Code City State Zip Code
4. Date organization established: _______________________
5. Name of succeeded business, if any: _________________________________________________________
6. How many years have you been in business as:
a. General contractor years.
b. Subcontractor years.
7. a. Furnish the following information concerning the owner, partners, officers and directors:
Percent of Business Owned
Years of Business Experience
Name
Title Contracting
Other
b. Attach resumes of these key personnel as well as the on-site project manager(s) and superintendent(s), and specifically identify the following:
- Present position, responsibility, and length of employment.
- Amount and type of construction experience.
- Amount and type of highway construction experience, including position, responsibility, and a brief project description of each period of employment.
- Formal education and training, professional or technical registrations or licenses.
B-5
8. a. Contracts in force. (Attach additional sheets if necessary)
Project Name and Contract Numbers
Owner's Name, Address, and
Contact Name and Telephone #
Scope of Work Performed
Contract Amount
Estimated
Completion Date
Name of Surety
b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet.
B-6
9. a. List at least five of the largest jobs you have completed in the last five years which are similar in project work scope to this project. (Attach additional sheets if necessary)
Project Name and Contract Numbers
Owner's Name, Address, Contact Name and Telephone #
Scope of Work
Performed
Original and Final Contract Amounts
Original and Final Completion Dates
Names of On-site Project
Manager and Superintendent
Name of Surety
b. Are there any unresolved claims or lawsuits associated with these projects? If so, state the amount in dispute, parties involved, nature and circumstances of the dispute, and status of the matter on a separate sheet
B-7
Solicitation Provisions
52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation. (JAN 2017)
(a) Definition. As used in this provision-- Internal confidentiality agreement or statement, subcontract, and subcontractor, are defined in the clause at 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
(b) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions), Government agencies are not permitted to use funds appropriated (or otherwise made available) for contracts with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.
(c) The prohibition in paragraph (b) of this provision does not contravene requirements applicable to Standard Form 312, (Classified Information Nondisclosure Agreement), Form 4414 (Sensitive Compartmented Information Nondisclosure Agreement), or any other form issued by a Federal department or agency governing the nondisclosure of classified information.
(d) Representation. By submission of its offer, the Offeror represents that it will not require its employees or subcontractors to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting waste, fraud, or abuse related to the performance of a Government contract to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information (e.g., agency Office of the Inspector General).
(End of provision)
52.204-5 Women-Owned Business (Other Than Small Business). (OCT 2014)
(a) Definition. "Women-owned business concern," as used in this provision, means a concern that is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.
(b) Representation. [Complete only if the offeror is a women-owned business concern and has not represented itself as a small business concern in paragraph (b)(1) of FAR 52.219-1, Small Business Program Representations, of this solicitation.] The offeror represents that it * is a women-owned business concern.
B-8
52.204-7 System for Award Management. (SAM) (OCT 2016)
52.204-8 Annual Representations and Certifications. (DEC 2016)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.
(2) The small business size standard is $36.5 million or less.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[_] (i) Paragraph (d) applies.
[_] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)
(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .