Buss Bar Replacement, Remove 10-Ton Crane, and CRANE RUNWAY RE-RAIL

Award Notice Posted

Solicitation number
W911PT-17-P-0235
Agency
Awarded
to Oddo Construction Services, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W911PT17P0235 Federal contract award
NAICS code
238290 Other Building Equipment Contractors
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

CLIN 0001- REMOVE APPROXIMATELY 135 FEET OF THREE CONDUCTOR BUSS BAR, BRIDGE COLLECTOR SHOES AND ALL MOUNTING HARDWARE. INSTALL APPROXIMATELY 135 FEET OF FOUR CONDUCTOR BUSS BAR (3 POWER AND 1 GROUND) AND ALL NEW MOUNTING HARDWARE. MODIFY CRANES (B009 AND B030) COLLECTOR POSTS TO EXCEPT THE 4TH COLLECTOR SHOE. REPLACE ALL COLLECTOR SHOES AND TEST BOTH CRANES FOR PROPER OPERATION.

CLIN 0002 REMOVE WIRE ROPE AND LOWER HOIST BLOCK, DISCONNECT CROSS TROLLEY CONDUCTORS TO CABLE REEL. REMOVED CABLE REEL. DISCONNECT AND REMOVED CROSS TROLLEY COLLECTORS. PROVIDE RIGGING, RENTAL CRANE AND OPERATOR, RIG TROLLEY AND LOWER TO FLOOR.
CLIN 0003 REMOVED APPROXIMATELY 1,460 LINEAR FEET OF RAIL. FURNISH AND INSTALL APPROXIMATELY 1,460 LINEAR FEET OF NEW PRIME CRANE RAIL WITH JOINT BARS, RAIL PAD AND MOUNTING HARDWARE AS REQUIRED. REMOVE USED RAIL FROM SITE. TEST CRANES AFTER INSTALLATION TO ENSURE PROPER OPERATION. THIS WORK CAN ONLY BE ACCOMPLISHED DURING WATERVLIET SHUTDOWN PERIOD 24 -28 JUL 2017. PRICE SHOULD INCLUDE RAILMOUNTING HARDWARE, FREIGHT, RENTAL EQUIPMENT AND ON SITE INSTALLATION.

. Awarded Vendors: ODDO CONSTRUCTION SERVICES LLC. Contract Award Dollar Amount: $148,879.00. Contract Award Date: 2017-07-06.

Update #1 ·

CLIN 0001- REMOVE APPROXIMATELY 135 FEET OF THREE CONDUCTOR BUSS BAR, BRIDGE COLLECTOR SHOES AND ALL MOUNTING HARDWARE. INSTALL APPROXIMATELY 135 FEET OF FOUR CONDUCTOR BUSS BAR (3 POWER AND 1 GROUND) AND ALL NEW MOUNTING HARDWARE. MODIFY CRANES (B009 AND B030) COLLECTOR POSTS TO EXCEPT THE 4TH COLLECTOR SHOE. REPLACE ALL COLLECTOR SHOES AND TEST BOTH CRANES FOR PROPER OPERATION.

CLIN 0002 REMOVE WIRE ROPE AND LOWER HOIST BLOCK, DISCONNECT CROSS TROLLEY CONDUCTORS TO CABLE REEL. REMOVED CABLE REEL. DISCONNECT AND REMOVED CROSS TROLLEY COLLECTORS. PROVIDE RIGGING, RENTAL CRANE AND OPERATOR, RIG TROLLEY AND LOWER TO FLOOR.

CLIN 0003 REMOVED APPROXIMATELY 1,460 LINEAR FEET OF RAIL. FURNISH AND INSTALL APPROXIMATELY 1,460 LINEAR FEET OF NEW PRIME CRANE RAIL WITH JOINT BARS, RAIL PAD AND MOUNTING HARDWARE AS REQUIRED. REMOVE USED RAIL FROM SITE. TEST CRANES AFTER INSTALLATION TO ENSURE PROPER OPERATION. THIS WORK CAN ONLY BE ACCOMPLISHED DURING WATERVLIET SHUTDOWN PERIOD 24 -28 JUL 2017. PRICE SHOULD INCLUDE RAILMOUNTING HARDWARE, FREIGHT, RENTAL EQUIPMENT AND ON SITE INSTALLATION.