Building 1700. 02 Equipment System Integrator

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W58RGZ-19-R-0252
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
Corpus Christi, Texas, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

***This is an amendment to the sources sought. This requirement will be a 100% Small Business Set-Aside and the NAICS code has been changed to 238290.
This is a sources-sought announcement only for informational and planning purposes and does not constitute a solicitation. This Request for Information (RFI) is being issued to accomplish market research and support planning for the below listed requirements. The Government will not pay for any information or reimburse any costs incurred in responding to this RFI. No solicitation is being issued at this time. All information submitted in response to this announcement is voluntary. Not responding to this RFI does not preclude participation in any future Request for Proposal (RFP), if any is issued. If a solicitation is released, it will be synopsized on the Army Single Face to Industry (ASFI). It is the responsibility of the potential offerors to monitor this site for additional information pertaining to this requirement.

The Government is seeking interested contractors for a contract to Corpus Christi Army Depot (CCAD) is seeking an Equipment System Integrator to perform duties as listed below. Attached is a copy of the current Statement of Work which may change prior to issuing an RFP:


Sources Sought for


Building 1700.2 Equipment System Integration


•1. BACKGROUND

The mission of the Corpus Christi Army Depot is to perform overhaul, repair, modification, retrofit, and modernization of aircraft systems and other systems as assigned; to maintain a mobilization and training base to provide capability for mission support during any contingency; to provide maintenance support services for special projects as assigned; to exercise command control over assigned activities; and to provide on-site technical assistance in the inspection, maintenance, and repair of customer aircraft, engines, and components.


The Corpus Christi Army Depot is currently having building 1700.2 constructed via a military construction/Army authority project. This building will be built adjacent to building 1700 which currently houses assembly shops that assemble and test transmissions for various aircraft. Building 1700.2 will contain shops that directly support activities in building 1700 such as: bearing shop, machine and grinding shops, workstation requirements kitting areas, non-destructive inspection shop, shot peen shop, paint preparation and paint shop.


•2. OBJECTIVES

The contractor shall provide Systems Integration for building 1700.2 within the stated period of performance. The integrator will provide utility design, install the utility, purchase new equipment, and relocate the existing equipment to building 1700.2. The locations of all new and relocated equipment shall be in accordance with government furnished items such as production layouts and equipment map.


•2.1. Utility Design and Utility Installation

The Government shall provide the contractor A & E drawings (architectural and engineering) of building 1700.2. The drawings will show where the building facility taps (compressed air, electricity, fire sprinkler, chilled water, city water, IT cabinets, etc.) will be provided. The contractor shall design and install a utility system that supports the process shops and all equipment purchased or relocated. The utility design(s) shall be in accordance with state and local laws governing such systems (electrical, fire protection, etc.). The contractor shall provide all utility equipment (transformers, circuit panels, dis-connects, etc.) for a turnkey installation of new or relocated machines. Prior to beginning the utility installation, the contractor shall provide, to the Government, drawings of the proposed utility system. The utility design shall be stamped by a licensed professional engineer and all installation work shall be done by certified personnel in the field related to the installation.


•2.2. Purchase of equipment

The contractor shall purchase and install new equipment. A sample list of new equipment to be purchased and installed is provided below. All new equipment shall meet the specifications associated with that particular item. The contractor shall implement a test plan in detail for proving that the machine meets the specification. The contractor shall be responsible for providing all utilities to new equipment. Prior to purchasing equipment, the contractor shall provide product drawings for review. See Appendix A


•2.3. Relocation of equipment

The contractor shall relocate and install equipment. A list of relocated equipment is provided in Appendix B. The contractor shall provide all necessary equipment and personnel to remove, transport and re-install equipment in building 1700.2. The Government shall provide the contractor an onsite, functional demonstration of each machine prior to relocation when requested by the contractor. The contractor shall be responsible for providing all utilities to relocated equipment and will verify that the machine functions correctly. The contractor shall provide a disassembly plan for each major piece of equipment to be relocated. Relocation shall not occur for any equipment until the utility installation is complete and new equipment installed.


•2.4. Other Tasks
•2.4.1. Maintain As-Built Drawings

The Government will provide the contractor a build-to layout. This layout contains the locations that equipment, by purchase and relocation, will be placed in BLDG. 1700.2. The contractor shall be responsible for installing equipment as indicated on the layout and updating this layout if changes are required.


•2.4.2. Develop Project Plan for New Equipment

The Government shall provide a schedule of equipment to purchase per option years and base year. The contractor shall provide a project plan of the purchase and installation activities per stated year. The plan shall accurately represent start dates and durations of installation activities. The utility design and installation activities shall be included in the base year project plan.


•2.4.3. Develop Durations for Relocated Equipment

The Government shall provide a schedule of equipment to be relocated. The contractor shall provide expected relocation activity durations for each item listed in the 'Relocate Equipment' list. Activity durations shall include disassembly, transportation, re-installation in BLDG. 1700.2, testing and certifying. The durations will be used by the Government to coordinate production shop downtime.


•2.4.4. Training for New Equipment

The contractor shall provide training for new equipment such as the bearing enclosure system, paint enclosure system, 5 axis machine, 5 axis machine pallet loader, CMM's.


•2.4.5. Preliminary Design Reviews

The contractor shall conduct preliminary design reviews for select equipment such as bearing enclosure, paint enclosure system. Topics of the design review will include HVAC controls, relocated equipment within enclosure, cleanroom controls.




APPENDIX A


The following is the list of equipment to purchase and install:


New Equipment Installation List


Item


QTY.


Vertical machining center I: Haas UMC-750


1


Jig boring machine: Mitsui Seiki J6CN-II


1


Mill I: Mitsui Seiki HU-100X-HMC w/ crane


1


Lathe VI: Haas ST-40


1


Lathe VII: Willis 32160


1


CMM I: Zeiss Prismo


1


CMM II: Zeiss Accura II


1


Bearing shop Enclosure, with all of its supporting equipment


1


Bearing Shop Clean Rooms


2


Bearing Shop Buffing Room


1


Exhaust Stacks for Bearing Cleaning Lines, with Exhaust Fan and Lighting Protection


2


Paint Shop Enclosure


1


Cross-draft Paint Booths


2


Paint Drying Booth


1


Paint Mixing Room


1


Paint Gun Cleaner, Paint Shaker, Stencil Printer, Ductless Fume Hood, Waste Compactor


Various


Super speed vertical machining center I: Haas VF-3SSYT


1


Super speed vertical machining center II: Haas VF-6SS


1


FPI substations w/ Cleaning and Roller System


2 lines


MPI Booth w/ Cleaning Roller System


2 sets


Vapor Degreaser for FPI


1


Universal grinder: Cincinnati 12" x 40"


3


Super finish lathe w/ tool post super finish grinder: Monarch 521


1


Lathe I through lathe VII: Monarch EE, Monarch 521, Willis 3280-6


Various


RO/DI water system (part of FPI, bearing shop, machine shop)


1


Mill II: Sharp KMA-1


1


Mill: Bridgeport, Series 1


4


Surface grinder: Willis WMA-2 2040


1


Vertical Lift Modules (VLMs) and Vertical Lift Carousels (VLCs)


Various


Tool Storage and Vending Dispenser


Various


Isotropic Super-Finishing Equipment Sets


Various


Material Picker (Walklift System) for High-Density Material Storage Racks


2


Mist Collectors, Solvent Booth, Ovens, Desks, chairs, workbenches, stools, sink, eyewashes, pallet racks, lockers, carts, vacuums, shelving & storage racks, jib boom with air hoists, Visual boards, Vacuum Sealer, Mobile Lift Conveyor


Various






APPENDIX B


The following is the list of equipment to relocate and install.


Relocate Equipment


Item


OEM & part number


QTY


Vertical machining center


Haas VF-6 40


1


Vertical machining center


Monarch VMC-2040-QPL


1


Mill and tool pre-setter


Mitsui Seiki HU100-5X


1


Jig boring machine


Mitsui Seiki J6CN


1


Mill


Sharp KMA-1


1


CMM


Zeiss Prismo


1


Comparator


CC-20


1


Vertical turret lathe


Olympia V40XTG


1


Vertical turret lathe


Olympia V40


1


Lathe


Monarch w/ mist collector


1


Lathe


Haas TL-3W


1


Lathe


Monarch 3 EE


1


Lathe


Monarch 5 EE


1


Belt sander


Kalamazoo


1


Lathe


Haas TL-4L


1


Lathe


Haas SL-30


1


Lathe


Haas SL-40


1


Lathe


Hardinge


1


Grinder


Usach 300


1


Grinder


Gioria w/ mist collector


1


Grinder


Usach 200


1


VLM (Vertical Lift Module)


Kardex Remstar XP 500


16


VLC (Vertical Lift Carousel)


Kardex Remstar


3


Shot peen booths w/ jib cranes


Progressive Surface


3


Bearing Inspection Gages, Devices, and Granite Tables


Various


varies


Bearing MPI Equipment and Booth


Magnaflux


1


Bearing Cleaning Lines


ACT


2


RO Water System


ProTech


1


Steam Generators


Lattner


2


Buffing Lathes, Grinders, and Sanders


various


varies


Vertical Spin Machine


Jet


1


Horizontal Spin Machine



1


Demagnetizer


Magnaflux


3


Vibratory Finishing Mill


Sweco


1


Solvent Booth


Surface Finishing Southwest


2


Preservation Vats


Magnus


4


Electronic Steam Humidifier


Armstrong International


1


Storage Rack with Walklift System


Walk Lift


1


Isotropic Super-Finishing Equipment Sets


Various


varies


Hazardous Waste Equipment


Various


Varies


Tables, oven, fume hood, benches, presses, carbide sharpener, belt sander, tool sharpener, tapper, vises, cabinets, carts


Various


Varies


.

Update #1 ·

This is a sources-sought announcement only for informational and planning purposes and does not constitute a solicitation. This Request for Information (RFI) is being issued to accomplish market research and support planning for the below listed requirements. The Government will not pay for any information or reimburse any costs incurred in responding to this RFI. No solicitation is being issued at this time. All information submitted in response to this announcement is voluntary. Not responding to this RFI does not preclude participation in any future Request for Proposal (RFP), if any is issued. If a solicitation is released, it will be synopsized on the Army Single Face to Industry (ASFI). It is the responsibility of the potential offerors to monitor this site for additional information pertaining to this requirement.


The Government is seeking interested contractors for a contract to Corpus Christi Army Depot (CCAD) is seeking an Equipment System Integrator to perform duties as listed below. Attached is a copy of the current Statement of Work which may change prior to issuing an RFP:


Sources Sought for


Building 1700.2 Equipment System Integration


•1. BACKGROUND

The mission of the Corpus Christi Army Depot is to perform overhaul, repair, modification, retrofit, and modernization of aircraft systems and other systems as assigned; to maintain a mobilization and training base to provide capability for mission support during any contingency; to provide maintenance support services for special projects as assigned; to exercise command control over assigned activities; and to provide on-site technical assistance in the inspection, maintenance, and repair of customer aircraft, engines, and components.


The Corpus Christi Army Depot is currently having building 1700.2 constructed via a military construction/Army authority project. This building will be built adjacent to building 1700 which currently houses assembly shops that assemble and test transmissions for various aircraft. Building 1700.2 will contain shops that directly support activities in building 1700 such as: bearing shop, machine and grinding shops, workstation requirements kitting areas, non-destructive inspection shop, shot peen shop, paint preparation and paint shop.


•2. OBJECTIVES

The contractor shall provide Systems Integration for building 1700.2 within the stated period of performance. The integrator will provide utility design, install the utility, purchase new equipment, and relocate the existing equipment to building 1700.2. The locations of all new and relocated equipment shall be in accordance with government furnished items such as production layouts and equipment map.


•2.1. Utility Design and Utility Installation

The Government shall provide the contractor A & E drawings (architectural and engineering) of building 1700.2. The drawings will show where the building facility taps (compressed air, electricity, fire sprinkler, chilled water, city water, IT cabinets, etc.) will be provided. The contractor shall design and install a utility system that supports the process shops and all equipment purchased or relocated. The utility design(s) shall be in accordance with state and local laws governing such systems (electrical, fire protection, etc.). The contractor shall provide all utility equipment (transformers, circuit panels, dis-connects, etc.) for a turnkey installation of new or relocated machines. Prior to beginning the utility installation, the contractor shall provide, to the Government, drawings of the proposed utility system. The utility design shall be stamped by a licensed professional engineer and all installation work shall be done by certified personnel in the field related to the installation.


•2.2. Purchase of equipment

The contractor shall purchase and install new equipment. A sample list of new equipment to be purchased and installed is provided below. All new equipment shall meet the specifications associated with that particular item. The contractor shall implement a test plan in detail for proving that the machine meets the specification. The contractor shall be responsible for providing all utilities to new equipment. Prior to purchasing equipment, the contractor shall provide product drawings for review. See Appendix A


•2.3. Relocation of equipment

The contractor shall relocate and install equipment. A list of relocated equipment is provided in Appendix B. The contractor shall provide all necessary equipment and personnel to remove, transport and re-install equipment in building 1700.2. The Government shall provide the contractor an onsite, functional demonstration of each machine prior to relocation when requested by the contractor. The contractor shall be responsible for providing all utilities to relocated equipment and will verify that the machine functions correctly. The contractor shall provide a disassembly plan for each major piece of equipment to be relocated. Relocation shall not occur for any equipment until the utility installation is complete and new equipment installed.


•2.4. Other Tasks
•2.4.1. Maintain As-Built Drawings

The Government will provide the contractor a build-to layout. This layout contains the locations that equipment, by purchase and relocation, will be placed in BLDG. 1700.2. The contractor shall be responsible for installing equipment as indicated on the layout and updating this layout if changes are required.


•2.4.2. Develop Project Plan for New Equipment

The Government shall provide a schedule of equipment to purchase per option years and base year. The contractor shall provide a project plan of the purchase and installation activities per stated year. The plan shall accurately represent start dates and durations of installation activities. The utility design and installation activities shall be included in the base year project plan.


•2.4.3. Develop Durations for Relocated Equipment

The Government shall provide a schedule of equipment to be relocated. The contractor shall provide expected relocation activity durations for each item listed in the 'Relocate Equipment' list. Activity durations shall include disassembly, transportation, re-installation in BLDG. 1700.2, testing and certifying. The durations will be used by the Government to coordinate production shop downtime.


•2.4.4. Training for New Equipment

The contractor shall provide training for new equipment such as the bearing enclosure system, paint enclosure system, 5 axis machine, 5 axis machine pallet loader, CMM's.


•2.4.5. Preliminary Design Reviews

The contractor shall conduct preliminary design reviews for select equipment such as bearing enclosure, paint enclosure system. Topics of the design review will include HVAC controls, relocated equipment within enclosure, cleanroom controls.




APPENDIX A


The following is the list of equipment to purchase and install:


New Equipment Installation List


Item


QTY.


Vertical machining center I: Haas UMC-750


1


Jig boring machine: Mitsui Seiki J6CN-II


1


Mill I: Mitsui Seiki HU-100X-HMC w/ crane


1


Lathe VI: Haas ST-40


1


Lathe VII: Willis 32160


1


CMM I: Zeiss Prismo


1


CMM II: Zeiss Accura II


1


Bearing shop Enclosure, with all of its supporting equipment


1


Bearing Shop Clean Rooms


2


Bearing Shop Buffing Room


1


Exhaust Stacks for Bearing Cleaning Lines, with Exhaust Fan and Lighting Protection


2


Paint Shop Enclosure


1


Cross-draft Paint Booths


2


Paint Drying Booth


1


Paint Mixing Room


1


Paint Gun Cleaner, Paint Shaker, Stencil Printer, Ductless Fume Hood, Waste Compactor


Various


Super speed vertical machining center I: Haas VF-3SSYT


1


Super speed vertical machining center II: Haas VF-6SS


1


FPI substations w/ Cleaning and Roller System


2 lines


MPI Booth w/ Cleaning Roller System


2 sets


Vapor Degreaser for FPI


1


Universal grinder: Cincinnati 12" x 40"


3


Super finish lathe w/ tool post super finish grinder: Monarch 521


1


Lathe I through lathe VII: Monarch EE, Monarch 521, Willis 3280-6


Various


RO/DI water system (part of FPI, bearing shop, machine shop)


1


Mill II: Sharp KMA-1


1


Mill: Bridgeport, Series 1


4


Surface grinder: Willis WMA-2 2040


1


Vertical Lift Modules (VLMs) and Vertical Lift Carousels (VLCs)


Various


Tool Storage and Vending Dispenser


Various


Isotropic Super-Finishing Equipment Sets


Various


Material Picker (Walklift System) for High-Density Material Storage Racks


2


Mist Collectors, Solvent Booth, Ovens, Desks, chairs, workbenches, stools, sink, eyewashes, pallet racks, lockers, carts, vacuums, shelving & storage racks, jib boom with air hoists, Visual boards, Vacuum Sealer, Mobile Lift Conveyor


Various






APPENDIX B


The following is the list of equipment to relocate and install.


Relocate Equipment


Item


OEM & part number


QTY


Vertical machining center


Haas VF-6 40


1


Vertical machining center


Monarch VMC-2040-QPL


1


Mill and tool pre-setter


Mitsui Seiki HU100-5X


1


Jig boring machine


Mitsui Seiki J6CN


1


Mill


Sharp KMA-1


1


CMM


Zeiss Prismo


1


Comparator


CC-20


1


Vertical turret lathe


Olympia V40XTG


1


Vertical turret lathe


Olympia V40


1


Lathe


Monarch w/ mist collector


1


Lathe


Haas TL-3W


1


Lathe


Monarch 3 EE


1


Lathe


Monarch 5 EE


1


Belt sander


Kalamazoo


1


Lathe


Haas TL-4L


1


Lathe


Haas SL-30


1


Lathe


Haas SL-40


1


Lathe


Hardinge


1


Grinder


Usach 300


1


Grinder


Gioria w/ mist collector


1


Grinder


Usach 200


1


VLM (Vertical Lift Module)


Kardex Remstar XP 500


16


VLC (Vertical Lift Carousel)


Kardex Remstar


3


Shot peen booths w/ jib cranes


Progressive Surface


3


Bearing Inspection Gages, Devices, and Granite Tables


Various


varies


Bearing MPI Equipment and Booth


Magnaflux


1


Bearing Cleaning Lines


ACT


2


RO Water System


ProTech


1


Steam Generators


Lattner


2


Buffing Lathes, Grinders, and Sanders


various


varies


Vertical Spin Machine


Jet


1


Horizontal Spin Machine



1


Demagnetizer


Magnaflux


3


Vibratory Finishing Mill


Sweco


1


Solvent Booth


Surface Finishing Southwest


2


Preservation Vats


Magnus


4


Electronic Steam Humidifier


Armstrong International


1


Storage Rack with Walklift System


Walk Lift


1


Isotropic Super-Finishing Equipment Sets


Various


varies


Hazardous Waste Equipment


Various


Varies


Tables, oven, fume hood, benches, presses, carbide sharpener, belt sander, tool sharpener, tapper, vises, cabinets, carts


Various


Varies


.

Files

File Type Posted
BLDG1700_2_SOW_20190219_ACC.pdf PDF

Notice history

Notice Type Posted
Amendment - Building 1700. 02 Production Equipment with Integration Latest solicitation Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity