Black River Harbor Water and Wastewater Improvement Project

Award Notice Posted

Solicitation number
AG-569R-S-15-0019
Agency
Awarded
to Howard Bros Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-569R-C-15-0018 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
The project is located in Gogebic County, Michigan, north of the community of Bessemer/Ironwood, on the Bessemer Ranger District of the Ottawa National Forest, and may be reached by travelling from Ironwood, Michigan east on US 2 to Powderhorn Road, turn left onto Powderhorn Road and travel approximately 3 miles to CR 513, turn left onto CR 513 and travel approximately 11 miles to the Black River Harbor Recreation Area. Latitude 46.665382 N, Longitude 90.047101 W Bessemer, Michigan 49911, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

The purpose of FBO Amendment dated 5/13/15 is to upload solicitation Amendment 1 which incorporates the Pre-Bid Attendee List, Pre-Bid Meeting Notes, and applicable permits.  Bid due date remains 5/20/15 at 2:00 Central.

The purpose of FBO Amendment dated 4/22/15 is to replace the solicitation document with the correct version that includes the SF-1442.  Bid due date remains at 5/20/15 at 2:00pm Central.

The purpose of FBO Amendment dated 4/21/15 is to upload the solicitation documents.

This construction project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the replacement of the existing water and wastewater systems at the Black River Harbor Recreation Area. Work includes, but is not limited to: demolition of existing pump house and attached radio tower, demolition of a concrete lake intake manhole, demolition of a 4,000 gallon concrete water tank, abandonment of existing well, complete removal of 3 lift stations, demolition and removal of two bathroom building and one wastewater treatment control building, pump out and demolition of a 175,000 gallon concrete aeration lagoon, complete removal of an RV dump station facility, general site work, installation of water lines and sewer lines with related valves and fittings, construction of a new fresh water intake system, new intake manhole structure, new intake pumps, pump control building renovations, a new concrete block pumphouse complete with flocculation/chlorination/ultrafiltration/turbidity units and all associated piping/pumps/controls, installation of new flow meters, pressure tanks and appurtenances, new electrical connections, renovations to a mostly underground 12,000 gallon concrete water storage tank, installation of a new pressure mound septic system complete with multiple septic tanks and pump chamber, connections to existing service lines, site preparation/furnish/install two new precast concrete vault buildings, and other incidentals required to complete the project as shown in the Specifications and Drawings. Contract is subject to the Davis-Bacon Act.

The estimated magnitude of construction is between $500,000 and $1,000,000.


The applicable NAICS code for this project is 237110, Water and Sewer Line and Related Structures Construction, and the small business size standard is $36.5 million.


The anticipated period of performance for the entire project is 280 days. Work is anticipated to be stopped during Winter, during which time days will not count against the performance period.


NOTE: Prospective awardees must be registered in the System for Award Management (SAM) to be considered for award on a Federal Government Contract. If you are not registered, please register at the following site: http://www.sam.gov/portal/public/SAM/


In performance of the work, the successful Contractor must comply with the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, "Federal Leadership in Environmental, Energy and Economic Performance," dated October 5, 2009; EO 13423, "Strengthening Federal Environmental, Energy, and Transportation Management," dated January 24, 2007; and Presidential Memorandum, "Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement," dated February, 2012 to provide biobased products.
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.

Update #3 ·

The purpose of FBO Amendment dated 4/22/15 is to replace the solicitation document with the correct version that includes the SF-1442.  Bid due date remains at 5/20/15 at 2:00pm Central.

The purpose of FBO Amendment dated 4/21/15 is to upload the solicitation documents.

This construction project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the replacement of the existing water and wastewater systems at the Black River Harbor Recreation Area. Work includes, but is not limited to: demolition of existing pump house and attached radio tower, demolition of a concrete lake intake manhole, demolition of a 4,000 gallon concrete water tank, abandonment of existing well, complete removal of 3 lift stations, demolition and removal of two bathroom building and one wastewater treatment control building, pump out and demolition of a 175,000 gallon concrete aeration lagoon, complete removal of an RV dump station facility, general site work, installation of water lines and sewer lines with related valves and fittings, construction of a new fresh water intake system, new intake manhole structure, new intake pumps, pump control building renovations, a new concrete block pumphouse complete with flocculation/chlorination/ultrafiltration/turbidity units and all associated piping/pumps/controls, installation of new flow meters, pressure tanks and appurtenances, new electrical connections, renovations to a mostly underground 12,000 gallon concrete water storage tank, installation of a new pressure mound septic system complete with multiple septic tanks and pump chamber, connections to existing service lines, site preparation/furnish/install two new precast concrete vault buildings, and other incidentals required to complete the project as shown in the Specifications and Drawings. Contract is subject to the Davis-Bacon Act.

The estimated magnitude of construction is between $500,000 and $1,000,000.


The applicable NAICS code for this project is 237110, Water and Sewer Line and Related Structures Construction, and the small business size standard is $36.5 million.


The anticipated period of performance for the entire project is 280 days. Work is anticipated to be stopped during Winter, during which time days will not count against the performance period.


NOTE: Prospective awardees must be registered in the System for Award Management (SAM) to be considered for award on a Federal Government Contract. If you are not registered, please register at the following site: http://www.sam.gov/portal/public/SAM/


In performance of the work, the successful Contractor must comply with the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, "Federal Leadership in Environmental, Energy and Economic Performance," dated October 5, 2009; EO 13423, "Strengthening Federal Environmental, Energy, and Transportation Management," dated January 24, 2007; and Presidential Memorandum, "Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement," dated February, 2012 to provide biobased products.
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.

Update #2 ·

The purpose of FBO Amendment 1 is to upload the solicitation documents.  Please see the solicitation for information regarding the pre-bid site visit.

Update #1 ·

THIS IS A SYNOPOSIS/PRE-SOLICITATION NOTICE ONLY. FULL SOLICITATION DOCUMENTS, INCLUDING SPECIFICATIONS AND DRAWINGS, WILL BE INCLUDED IN THE OFFICIAL SOLICITATION. THE SOLICITATION IS ANTICIPATED TO BE UPLOADED TO THIS NOTICE ON OR ABOUT APRIL 20, 2015.

This construction project includes all labor, materials, equipment, supplies, supervision and incidentals necessary for the replacement of the existing water and wastewater systems at the Black River Harbor Recreation Area. Work includes, but is not limited to: demolition of existing pump house and attached radio tower, demolition of a concrete lake intake manhole, demolition of a 4,000 gallon concrete water tank, abandonment of existing well, complete removal of 3 lift stations, demolition and removal of two bathroom building and one wastewater treatment control building, pump out and demolition of a 175,000 gallon concrete aeration lagoon, complete removal of an RV dump station facility, general site work, installation of water lines and sewer lines with related valves and fittings, construction of a new fresh water intake system, new intake manhole structure, new intake pumps, pump control building renovations, a new concrete block pumphouse complete with flocculation/chlorination/ultrafiltration/turbidity units and all associated piping/pumps/controls, installation of new flow meters, pressure tanks and appurtenances, new electrical connections, renovations to a mostly underground 12,000 gallon concrete water storage tank, installation of a new pressure mound septic system complete with multiple septic tanks and pump chamber, connections to existing service lines, site preparation/furnish/install two new precast concrete vault buildings, and other incidentals required to complete the project as shown in the Specifications and Drawings. Contract is subject to the Davis-Bacon Act.


The estimated magnitude of construction is between $500,000 and $1,000,000. Solicitation will be available for download from FedBizOpps website at http://www.fbo.gov on or about April 20, 2015.


The applicable NAICS code for this project is 237110, Water and Sewer Line and Related Structures Construction, and the small business size standard is $36.5 million.


The anticipated period of performance for the entire project is 280 days. Work is anticipated to be stopped during Winter, during which time days will not count against the performance period.


NOTE: Prospective awardees must be registered in the System for Award Management (SAM) to be considered for award on a Federal Government Contract. If you are not registered, please register at the following site: http://www.sam.gov/portal/public/SAM/


In performance of the work, the successful Contractor must comply with the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, "Federal Leadership in Environmental, Energy and Economic Performance," dated October 5, 2009; EO 13423, "Strengthening Federal Environmental, Energy, and Transportation Management," dated January 24, 2007; and Presidential Memorandum, "Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement," dated February, 2012 to provide biobased products.
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.

Files

File Type Posted
Amendment_01.pdf PDF
AG-569R-S-15-0019.pdf PDF
Attachment_C_-_Davis_Bacon_Wage_Determination.docx DOCX document
AG-569R-S-15-0019.rtf RTF text file
Attachment_B_-_Drawings.pdf PDF
Attachment_A_-_Specifications.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity