About this opportunity

The Federal Contract Opportunity involves the provision and installation of a 1600sf pre-engineered shade structure at Bird Creek Campground, Ely Ranger District, including all excavation and concrete work. The contractor is responsible for all structural design details of the building and footings, taking into account the saturated soil conditions. The estimated price for the project is between $100,000 and $250,000, with the due date for offers extended to September 6, 2023.

Products and Services to be provided:

  1. Provision and installation of a 1600sf pre-engineered shade structure.
  2. Excavation and concrete work for the structure.
  3. Structural design details of the building and footings.
  4. Consideration and planning for saturated soil conditions.
  5. Compliance with minimum specifications for reinforced concrete and site preparation.

Notice text

3 versions

Update #3 · Latest ·

Purpose of Amendment #2

1. Attached is a revised update Minimum Specifications

2. Q&A

RFI:

“The existing concrete slab sits on a wetland and groundwater daylights at multiple locations around the concrete slab. The continuously running creek is within feet of a corner of the slab and about 2-3 feet lower than the slab. Excavation for the new concrete foundations for the pavilion may or may not collapse. The slab may or may not be undermined due to these conditions, among others. Will settling, cracking, undermining and similar of the slab and resulting repair or corrective action be considered an unforeseen condition?”

Response:

After further investigation, the government does expect the soil conditions directions surrounding the slab to remain saturated for the duration of this contract.  The designer of the pre-engineered structure shall take this into consideration when planning for concrete mix design, footing design, and constructability of the footings.  The contractor shall also account for saturated conditions when planning for site access and footing construction.   The minimum specifications in the contract are provided as a guide for minimum quality of reinforced concrete and site preparation.  The building manufacturer shall provide detailed specifications pertaining to the specific site and soil conditions.   Changes to the minimum specifications are as follow:

  • Delete the original Concrete mix design table from Specification from Section 033015 – CONCRETE FOR MINOR STRUCTURES - 2.1,  B.  The contractor shall provide a mix design suitable for saturated conditions for government approval.
  • Section 022220 – STRUCTURAL EXCAVATION, BACKFILL, AND COMPACTION -  Design and excavation of footings shall account for saturated soil conditions including constructability, access, and  structural backfill if necessary. 

Purpose of Amendment #1

1.  EXTEND DUE DATE OF OFFERS: TO SEPTEMBER 6, 2023 AT 1630 MT EMAIL ONLY TO: tanya.spanfellner@usda.gov

2. Attached Q&A

Work for this project consists of provision and installation of a an approximately 1600sf pre-engineered shade structure including allexcavation and concrete.  Vendor shall be responsible for all structural design details of building and footings, but shall minimally meet the requirements set forth in Sections 033015 an 022220 of this document.  This is to ensure reinforced concrete, formwork, aggregate, compaction, subgrade, and backfill are addressed and to a standard equal to or better than the government requires. 

This project is located in Bird Creek Campground, Ely Ranger District, located approximately 33 miles north-east of Ely, NV. 

MAGNITUDE OF CONSTRUCTION PROJECT
Estimated Price Between $100,000 and $250,000. 

Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)

Update #2 ·

Purpose of Amendment #1

1.  EXTEND DUE DATE OF OFFERS: TO SEPTEMBER 6, 2023 AT 1630 MT EMAIL ONLY TO: tanya.spanfellner@usda.gov

2. Attached Q&A

Work for this project consists of provision and installation of a an approximately 1600sf pre-engineered shade structure including allexcavation and concrete.  Vendor shall be responsible for all structural design details of building and footings, but shall minimally meet the requirements set forth in Sections 033015 an 022220 of this document.  This is to ensure reinforced concrete, formwork, aggregate, compaction, subgrade, and backfill are addressed and to a standard equal to or better than the government requires. 

This project is located in Bird Creek Campground, Ely Ranger District, located approximately 33 miles north-east of Ely, NV. 

MAGNITUDE OF CONSTRUCTION PROJECT
Estimated Price Between $100,000 and $250,000. 

Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)

Update #1 ·

Work for this project consists of provision and installation of a an approximately 1600sf pre-engineered shade structure including all excavation and concrete.  Vendor shall be responsible for all structural design details of building and footings, but shall minimally meet the requirements set forth in Sections 033015 an 022220 of this document.  This is to ensure reinforced concrete, formwork, aggregate, compaction, subgrade, and backfill are addressed and to a standard equal to or better than the government requires. 

This project is located in Bird Creek Campground, Ely Ranger District, located approximately 33 miles north-east of Ely, NV. 

MAGNITUDE OF CONSTRUCTION PROJECT
Estimated Price Between $100,000 and $250,000. 

Economically Disadvantaged WOSB (EDWOSB) Program Set-Aside (FAR 19.15)

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment 2.pdf PDF
RV_Bird_Creek_Shade_Pavilion_Minimum_Specifications.pdf PDF
Amendment 1.pdf PDF
QA.docx DOCX document
Bird_Creek_Shade_Structure_2023 4 rEVISION_8_23_23.pdf PDF
J.2 Drawings.pdf PDF
1240LT23Q0089.pdf PDF
J.1 Bird_Creek_Shade_Pavilion_Minimum_Specifications.pdf PDF
J.4_Determination of Responsibility.pdf PDF
J.3 Wage Determination.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity