This document is an amendment to a federal solicitation for construction of a bird creek campground shade pavilion. The project involves building a pre-engineered reinforced concrete structure near an existing concrete slab situated over wetland areas with saturated soil conditions. The amendment provides revised minimum specifications and responses to questions regarding the soil and underground water conditions. The concrete mix design table is removed with the contractor now required to provide a mix suitable for saturated soils. Excavation and structural backfill must account for saturated subsurface conditions, including ensuring constructability and site access. Offerors must acknowledge receipt of the amendment by the specified deadline for the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to BIRD CREEK CAMPGROUND SHADE PAVILION, newest first.
File Type Posted
RV_Bird_Creek_Shade_Pavilion_Minimum_Specifications.pdf PDF
Amendment 1.pdf PDF
QA.docx DOCX document
Bird_Creek_Shade_Structure_2023 4 rEVISION_8_23_23.pdf PDF
J.2 Drawings.pdf PDF
1240LT23Q0089.pdf PDF
J.1 Bird_Creek_Shade_Pavilion_Minimum_Specifications.pdf PDF
J.4_Determination of Responsibility.pdf PDF
J.3 Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240LT23Q0089

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40LT

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 8

08/31/20230002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/14/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Purpose of Amendment #2

1. Attached is a revised update Minimum Specifications

2. Q&A

RFI:

"The existing concrete slab sits on a wetland and groundwater daylights at multiple locations around the concrete slab. The continuously running creek is within feet of a corner of the slab and about 2-3 feet lower than the slab. Excavation for the new concrete foundations for the pavilion may or may not collapse. The slab may or may not be undermined

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TANYA I. SPANFELLNER

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240LT23Q0089/0002

due to these conditions, among others. Will settling, cracking, undermining and similar of the slab and resulting repair or corrective action be considered an unforeseen condition?"

Response:

After further investigation, the government does expect the soil conditions directions surrounding the slab to remain saturated for the duration of this contract. The designer of the pre-engineered structure shall take this into consideration when planning for concrete mix design, footing design, and constructability of the footings. The contractor shall also account for saturated conditions when planning for site access and footing construction. The minimum specifications in the contract are provided as a guide for minimum quality of reinforced concrete and site preparation. The building manufacturer shall provide detailed specifications pertaining to the specific site and soil conditions.

Changes to the minimum specifications are as follow:

Delete the original Concrete mix design table from Specification from Section 0330-CONCRETE FOR MINOR STRUCTURES - 2.1, B. The contractor shall provide a mix design suitable for saturated conditions for government approval.

Section 022220-STRUCTURAL EXCAVATION, BACKFILL, AND COMPACTION - Design and excavation of footings shall account for saturated soil conditions including constructability, access, and structural backfill if necessary.