Battery charger
Closed Solicitation Posted
- Solicitation number
- 70Z08525Q40398B00
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
- PSC
- 6130 Converters, Electrical, Nonrotating
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Coast Guard Surface Forces Logistics Center is soliciting quotes for maritime equipment components, specifically seeking two NSN-coded propulsion shaft components (a sleeve and spacer) and a battery charger with precise technical specifications. The battery charger must be an A12B-40-24V model featuring 40 amps DC output, 24 volt DC output, 120 VAC single-phase input, and USCG-specific accessories including an AC switch, dripshield, and stuffing tubes. Vendors must maintain active SAM.gov registration and comply with MIL-STD-2073-1E packaging standards, with specific marking and barcoding requirements for delivery. The procurement will be structured as a firm fixed-price purchase order with invoicing processed through IPP.gov and NET 30 payment terms. Quote submissions are due by September 6, 2025, with a required delivery date of April 15, 2026.
This opportunity is designated as a Total Small Business set-aside under NAICS code 335999 (All Other Miscellaneous Electrical Equipment and Component Manufacturing), limiting competition to qualified small businesses. No incumbent contractors or potential award values are specified in the available documentation, though vendors must include all delivery and freight charges to zip code 21226 in their total pricing. The goods will be delivered FOB destination to the USCG Surface Forces Logistics Center in Baltimore, Maryland. The solicitation incorporates comprehensive FAR clauses addressing ethical standards, equal opportunity requirements, labor regulations, and various federal procurement compliance measures. Performance will occur over an approximately seven-month timeline from contract award to the April 2026 delivery requirement.
Notice text
See attached.
Files
| File | Type | Posted |
|---|---|---|
| Tab 12- FAR Clauses.docx | DOCX document | |
| Tab 12- RFQ 70Z08525P40398B00.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Charger, battery | Land and Maritime | Total Small Business | |
| Charger, battery | Land and Maritime | No set-aside | |
| Charger, battery | Land and Maritime | No set-aside | |
| Charger, battery | Aviation | No set-aside | |
| Charger, battery, in repair/modification of | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity