Barkley Dam Site Water and Compressed Air Piping Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912P523B0007
- Agency
-
ENDIST Nashville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Grand Rivers, Kentucky 42045, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Nashville District is seeking bids for a construction contract to demolish and replace the 3-inch treated water line and 2-inch compressed air line in the powerhouse hoistway at Barkley Dam Site near Grand Rivers, Kentucky. Bids are due by August 31, 2023 and the work is set aside for small businesses under NAICS code 237110 for water and sewer line construction. Questions must be submitted by August 18 and the bid opening is scheduled for August 31.
This is a total small business set-aside with a NAICS code of 237110 and no incumbent or budget is specified. The work includes demolishing approximately 120 feet of existing vertical piping and installing new vertical sections of 3-inch treated water and 2-inch compressed air lines including related valves and hangers. A mandatory site visit will be held on August 15 and the place of performance is the Barkley Dam Site in Grand Rivers, Kentucky. Bidders must be registered in SAM and PIEE systems by the time of proposal submission.
Notice text
2 versions
Update #2 · Latest ·
*AMENDMENT 0001*
Amendment 0001 is being issued to provide questions and answers in Projnet Bidder Inquiry, revised Technical Specifications, physical site visit sign-in sheet, and update the Period of Performance.
NOTE: The deadline for receipt of bids is not extended by this Amendment and remains 31 August 2023 at 1:00PM Central Time.
The Nashville District, U.S. Army Corps of Engineers, is issuing an Invitation for Bid (IFB) for a firm fixed-price construction contract. The work includes construction of the Barkley Dam Site Water Supply Lines which includes demolishing the existing and installing the new vertical section of the 3-inch treated water line and the 2-inch compressed air line in the powerhouse hoistway (approximately 120 feet). This will include a condensate drain, service outlet, and any valves in the existing system. Replace all vertical hangers (fourteen total). The new water and air line must be installed in the existing blockout in the hoistway at Barkley Dam Site near Grand Rivers, Kentucky. Location: The work is located at Barkley Dam Site near Grand Rivers, KY. Exact locations for work at Barkley Dam Site are indicated in the contract drawings. NAICS CODE AND SBA SIZE STANDARD: 237110 - Water and Sewer Line, and Related Structures Construction; Size Standard $45.0M TYPE OF SET ASIDE: Total Small Business Set-Aside SITE VISIT: A site visit is scheduled for 15 August 2023 at 10:00AM Central Time. The site visit request forms are attached.Each individual will be responsible providing his/her own safety equipment (i.e. hard hats, steel toed safety shoes, etc.). Contractors who are interested in attending the site visit are strongly encouraged to submit the site visit request form as soon as possible to avoid missing the submission deadline for the forms. Offerors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of the contract performance (FAR 52.236-27 Alternate 1, Site Visit (Construction)).QUESTIONS: Questions must be submitted in Projnet Bidder Inquiring using the Quick Key in the solicitation no later than 18 August 2023. BID OPENING: The Bid Opening is scheduled for 31 August 2023 at 1:00PM Central Time. Bids must be submitted in PIEE Solicitation Module. The Solicitation, Bid Schedule, Technical Plans and Specifications are only available via the PIEE Solicitation Module. Please us the link to access the solicitation to obtain these documents and to submit bids. SYSTEM FOR AWARD MANAGEMENT (SAM): Offerors are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
Update #1 ·
The Nashville District, U.S. Army Corps of Engineers, is issuing an Invitation for Bid (IFB) for a firm fixed-price construction contract. The work includes construction of the Barkley Dam Site Water Supply Lines which includes demolishing the existing and installing the new vertical section of the 3-inch treated water line and the 2-inch compressed air line in the powerhouse hoistway (approximately 120 feet). This will include a condensate drain, service outlet, and any valves in the existing system. Replace all vertical hangers (fourteen total). The new water and air line must be installed in the existing blockout in the hoistway at Barkley Dam Site near Grand Rivers, Kentucky.
Location: The work is located at Barkley Dam Site near Grand Rivers, KY. Exact locations for work at Barkley Dam Site are indicated in the contract drawings.
NAICS CODE AND SBA SIZE STANDARD: 237110 - Water and Sewer Line, and Related Structures Construction; Size Standard $45.0M
TYPE OF SET ASIDE: Total Small Business Set-Aside
SITE VISIT: A site visit is scheduled for 15 August 2023 at 10:00AM Central Time. The site visit request forms are attached.
Each individual will be responsible providing his/her own safety equipment (i.e. hard hats, steel toed safety shoes, etc.). Contractors who are interested in attending the site visit are strongly encouraged to submit the site visit request form as soon as possible to avoid missing the submission deadline for the forms. Offerors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of the contract performance (FAR 52.236-27 Alternate 1, Site Visit (Construction)).
QUESTIONS: Questions must be submitted in Projnet Bidder Inquiring using the Quick Key in the solicitation no later than 18 August 2023.
BID OPENING: The Bid Opening is scheduled for 31 August 2023 at 1:00PM Central Time. Bids must be submitted in PIEE Solicitation Module. The Solicitation, Bid Schedule, Technical Plans and Specifications are only available via the PIEE Solicitation Module. Please us the link to access the solicitation to obtain these documents and to submit bids.
SYSTEM FOR AWARD MANAGEMENT (SAM): Offerors are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted.
Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on "View FFP Contract Changes Playbook Here".
Notice history
| Notice | Type | Posted |
|---|---|---|
| Barkley Dam Site Water and Compressed Air Piping Replacement | Award Notice | |
| This notice | Solicitation | |
| Barkley Dam Site Water and Compressed Air Piping Replacement | Pre-Solicitation | |
| Barkley Dam Water and Compressed Air Lines Replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity