About this opportunity
This solicitation is for a firm fixed price service contract with the Department of the Army Corps of Engineers Sacramento District to provide revegetation installation and maintenance services at the Sacramento River Site 55 left bank. The selected contractor will be responsible for designing, installing, and maintaining vegetation and irrigation systems over 48,345 square feet for three years, including repairing or replacing infrastructure, providing pumps for irrigation, and submitting periodic reports. The evaluation criteria are not specified, and questions are due by September 7, 2022 with offers due September 15, 2022.
The set-aside is for total small business concerns. The work includes planting willows and maintaining vegetation in the base year with option years for continued maintenance. All work will be performed on federal weekdays during daylight hours at the Sacramento, California location. The contractor must replant any areas below survival levels and remove above ground irrigation and fencing after three years.
Notice text
2 versions
Update #2 · Latest ·
8 September Update :The questions deadline has passed. All questions and their answers are provided in the second attachment to this solicitation, titled "Questions Answered."
This is a firm fixed price service contract to provide re-vegetation installation and establishment maintenance at Sacramento River Site 55, left bank. The Government shall not exercise any supervision or control over contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who in turn is responsible to the Government.
The overall responsibility of the Contractor is to manage and perform the activities necessary to re-vegetate 48,345 square feet of the riparian bench and upper bank within the formerly repaired levee area. The contractor shall provide all personnel, equipment, material, tools, supervision, quality control, and other items necessary to ensure that the designated habitats are installed and maintained to provide suitable environment for vegetation establishment at this site. Services include but are not limited to repairing or replacing any damage to existing beaver barrier fence (BBF) or signage around the entire site; providing portable pumps to draw water directly from the adjacent river for irrigation; and designing, installing, repairing, and replacing the irrigation system that supplies water to the newly installed vegetation at the frequency stated within this contract.
Services also include maintaining the vegetation and site infrastructure for the duration of the establishment period, trimming and herbicide spraying of the grasses, irrigating the installed vegetation, weeding around the woody plants, performing plant surveys, submitting monthly records and year end reports, performing replanting where plant survival falls below designated levels, trash removal, and removing above ground irrigation equipment and BBF after the establishment period is completed. Contractor is also required to plant willows during the base year and provide maintenance as necessary during subsequent option years. All work will be done during normal Federal workdays in daylight hours.
Please direct all questions to Sean Summer, at sean.a.summer@usace.army.mil, by not later than 7 September 2022 at 11:00AM PDT.
Update #1 ·
This is a firm fixed price service contract to provide re-vegetation installation and establishment maintenance at Sacramento River Site 55, left bank. The Government shall not exercise any supervision or control over contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who in turn is responsible to the Government.
The overall responsibility of the Contractor is to manage and perform the activities necessary to re-vegetate 48,345 square feet of the riparian bench and upper bank within the formerly repaired levee area. The contractor shall provide all personnel, equipment, material, tools, supervision, quality control, and other items necessary to ensure that the designated habitats are installed and maintained to provide suitable environment for vegetation establishment at this site. Services include but are not limited to repairing or replacing any damage to existing beaver barrier fence (BBF) or signage around the entire site; providing portable pumps to draw water directly from the adjacent river for irrigation; and designing, installing, repairing, and replacing the irrigation system that supplies water to the newly installed vegetation at the frequency stated within this contract.
Services also include maintaining the vegetation and site infrastructure for the duration of the establishment period, trimming and herbicide spraying of the grasses, irrigating the installed vegetation, weeding around the woody plants, performing plant surveys, submitting monthly records and year end reports, performing replanting where plant survival falls below designated levels, trash removal, and removing above ground irrigation equipment and BBF after the establishment period is completed. Contractor is also required to plant willows during the base year and provide maintenance as necessary during subsequent option years. All work will be done during normal Federal workdays in daylight hours.
Please direct all questions to Sean Summer, at sean.a.summer@usace.army.mil, by not later than 7 September 2022 at 11:00AM PDT.
Files
| File | Type | Posted |
|---|---|---|
| Questions Answered.pdf | ||
| Solicitation WRDA 55.2.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| WRDA Erosion 55. 2L Revegetation | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside | |
| Grand Island Mitigation Site | ENDIST Sacramento | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity