zb053 OD.pdf

PDF 7 KB Posted

Attached to
OIR CONTROL MONITOR
Solicitation number
70Z08023QZB053
Issued by

About this file

This document provides the overhaul description for a control-monitor used on Coast Guard cutters. The Coast Guard is seeking overhaul and repair of a MTU Elektronik control monitor, part number B00E50207391/S004, used with main diesel engines on 154-foot Fast Response Cutters. Contractors must follow SFLC specification R-400-299-M for electronic equipment repair. The estimated cost for a new unit is $35,500, with an overhaul not to exceed $23,075. The contractor must guarantee the item for up to two years after delivery. Acceptance will occur at destination by a government representative. Individual packaging and a minimum two-year preservation is required. Potential sources for the repair are listed as Rolls-Royce Solutions GmbH, Stewart & Stevenson FDDA LLC, and Pacific Power Products Company LLC.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME CONTROL-MONITOR

STOCK NUMBER 5895-12-395-9484

PART NUMBER X00E50204217/S0002

USED ON 154-WPC

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

Inspect and repair Part Number B00E50207391/S004 Control Monitor used with Main Diesel Engine installed on board Coast Guard 154 foot Fast Response Cutter.

******* NOTE UPDATED PART # B00E50207391/S004 *******

Manufactured by MTU Elektronik Friedrichshafen.

REFER TO SFLC SPEC #R-400-299-M DATED October 2014, SPECIFICATION FOR THE

REPAIR OF ELECTRONIC EQUIPMENT AND MODULES.

Estimated cost new: $35,500.00 65% of new: $23,075.00

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

SHELF LIFE CD 0

FOR OFFICIAL USE ONLY

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

5895-12-395-9484

CONTROL-MONITOR

X00E50204217/S0002

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

ROLLS-ROYCE SOLUTIONS GMBH

MAYBACHPLATZ 1

FRIEDRICHSHAFEN, GERMANY 88045

STEWART & STEVENSON FDDA LLC

4141 SW 30TH AVE

FORT LAUDERDALE, FL

33312-6805

954-327-4440

PACIFIC POWER PRODUCTS COMPANY LLC

7215 S 228TH ST

KENT, WA 98032-3908

253-520-5188

WRITTEN BY:

DATE :

WAYNE NICKEL

05 JUL 23

Cost Estimate for Overhaul NOT TO EXCEED: $23,075

File details come from the government source that posted it. Updated .