zb053 OD.pdf
PDF 7 KB Posted
- Attached to
- OIR CONTROL MONITOR
- Solicitation number
- 70Z08023QZB053
About this file
This document provides the overhaul description for a control-monitor used on Coast Guard cutters. The Coast Guard is seeking overhaul and repair of a MTU Elektronik control monitor, part number B00E50207391/S004, used with main diesel engines on 154-foot Fast Response Cutters. Contractors must follow SFLC specification R-400-299-M for electronic equipment repair. The estimated cost for a new unit is $35,500, with an overhaul not to exceed $23,075. The contractor must guarantee the item for up to two years after delivery. Acceptance will occur at destination by a government representative. Individual packaging and a minimum two-year preservation is required. Potential sources for the repair are listed as Rolls-Royce Solutions GmbH, Stewart & Stevenson FDDA LLC, and Pacific Power Products Company LLC.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERHAUL DESCRIPTION
FOR OFFICIAL USE ONLY
ITEM NAME CONTROL-MONITOR
STOCK NUMBER 5895-12-395-9484
PART NUMBER X00E50204217/S0002
USED ON 154-WPC
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
Inspect and repair Part Number B00E50207391/S004 Control Monitor used with Main Diesel Engine installed on board Coast Guard 154 foot Fast Response Cutter.
******* NOTE UPDATED PART # B00E50207391/S004 *******
Manufactured by MTU Elektronik Friedrichshafen.
REFER TO SFLC SPEC #R-400-299-M DATED October 2014, SPECIFICATION FOR THE
REPAIR OF ELECTRONIC EQUIPMENT AND MODULES.
Estimated cost new: $35,500.00 65% of new: $23,075.00
WARRANTY:
X A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.
Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.
SHELF LIFE CD 0
FOR OFFICIAL USE ONLY
PACKAGING AND MARKING FOR SHIPMENT:
X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:
NATIONAL STOCK NUMBER
ITEM NAME
PART NUMBER
GOVERNMENT ORDER NUMBER
5895-12-395-9484
CONTROL-MONITOR
X00E50204217/S0002
PRESERVATION / PACKAGING:
X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.
B. See Attachments
B. See Attachments
And the words: "Coast Guard SFLC Material, Condition "A"
RECOMMENDED SOURCES:
ROLLS-ROYCE SOLUTIONS GMBH
MAYBACHPLATZ 1
FRIEDRICHSHAFEN, GERMANY 88045
STEWART & STEVENSON FDDA LLC
4141 SW 30TH AVE
FORT LAUDERDALE, FL
33312-6805
954-327-4440
PACIFIC POWER PRODUCTS COMPANY LLC
7215 S 228TH ST
KENT, WA 98032-3908
253-520-5188
WRITTEN BY:
DATE :
WAYNE NICKEL
05 JUL 23
Cost Estimate for Overhaul NOT TO EXCEED: $23,075
File details come from the government source that posted it. Updated .