Work Item Listing (DRAFT)_JAMES FY21 FYQ4.pdf

PDF 282 KB Posted

Attached to
Dock-Side: USCGC JAMES FY21 DS2
Solicitation number
70Z08521SP-JAMES-DS-FY21-FYQ4
Issued by

About this file

This document outlines a federal contract opportunity for dock-side repair services on the USCGC James. Interested vendors are invited to submit capability statements and past performance information by a specified date to be considered for the work. The repair period is from August 25 to October 19, 2021 at the ship's homeport in North Charleston, South Carolina. The scope of work includes cleaning and inspecting fuel tanks, replacing flexible hoses, performing annual inspection and testing of cargo handling equipment, leak testing rupture disks, overhauling and inspecting the oily water separator system, preserving and repairing decks and bulkheads, renewing insulation, replacing a tank sounding tube, modifying a towline platform, installing escape hatches and ladders, and providing tenting and temporary services. Responses should include company information, small business status if applicable, a statement of ability to perform as prime contractor if solicited, and relevant past performance examples.

View the file

Other files

File Type Posted
DHS Form 11000-6_Non-Disclosure Agreement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Item Listing (DRAFT) Dock-Side: USCGC JAMES FY21 FYQ4

WORK ITEM 1: Tanks (MP Fuel Service), Clean and Inspect

WORK ITEM 2: Tanks (MP Fuel Stowage and Overflow), Clean and Inspect

WORK ITEM 3: SSDG Flexible Hoses, Renew

WORK ITEM 4: Cargo Handling Elevator, Annual Inspection and Test, Perform

WORK ITEM 5: Refrigeration System Rupture Disks, Leak Test

WORK ITEM 6: Oily Water Separator (OWS) System, Inspect and Groom

WORK ITEM 7: Oily Water Separator (OWS) System, Overahaul

WORK ITEM 8: Deck Covering (Polymeric), Repair and Seal

WORK ITEM 9: Fan Plenums, Preserve

WORK ITEM 10: Decks, Preserve (Full)

WORK ITEM 11: Deck Covering (Slip-Resistant), Renew

WORK ITEM 12: Bulkhead and/or Overhead Insulation, Renew

WORK ITEM 13: No.2 Main Propulsion Diesel Engine, Exhaust Piping Insulation, Renew

WORK ITEM 14: Tank Sounding Tube, Replace

WORK ITEM 15: Towline Platform, Modify

WORK ITEM 16: VCHT Room Escape Scuttle and Ladder, Install

WORK ITEM 17: Deck Covering (Polymeric), Repair and Seal

WORK ITEM 18: Mast Darken Ship Switches (Watertight Door and Scuttle), Install

WORK ITEM 19: Tenting, Provide

WORK ITEM 20: Temporary Services, Provide