Work Item Listing (DRAFT)_JAMES FY21 FYQ4.pdf
PDF 282 KB Posted
- Attached to
- Dock-Side: USCGC JAMES FY21 DS2
- Solicitation number
- 70Z08521SP-JAMES-DS-FY21-FYQ4
About this file
This document outlines a federal contract opportunity for dock-side repair services on the USCGC James. Interested vendors are invited to submit capability statements and past performance information by a specified date to be considered for the work. The repair period is from August 25 to October 19, 2021 at the ship's homeport in North Charleston, South Carolina. The scope of work includes cleaning and inspecting fuel tanks, replacing flexible hoses, performing annual inspection and testing of cargo handling equipment, leak testing rupture disks, overhauling and inspecting the oily water separator system, preserving and repairing decks and bulkheads, renewing insulation, replacing a tank sounding tube, modifying a towline platform, installing escape hatches and ladders, and providing tenting and temporary services. Responses should include company information, small business status if applicable, a statement of ability to perform as prime contractor if solicited, and relevant past performance examples.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DHS Form 11000-6_Non-Disclosure Agreement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Item Listing (DRAFT) Dock-Side: USCGC JAMES FY21 FYQ4
WORK ITEM 1: Tanks (MP Fuel Service), Clean and Inspect
WORK ITEM 2: Tanks (MP Fuel Stowage and Overflow), Clean and Inspect
WORK ITEM 3: SSDG Flexible Hoses, Renew
WORK ITEM 4: Cargo Handling Elevator, Annual Inspection and Test, Perform
WORK ITEM 5: Refrigeration System Rupture Disks, Leak Test
WORK ITEM 6: Oily Water Separator (OWS) System, Inspect and Groom
WORK ITEM 7: Oily Water Separator (OWS) System, Overahaul
WORK ITEM 8: Deck Covering (Polymeric), Repair and Seal
WORK ITEM 9: Fan Plenums, Preserve
WORK ITEM 10: Decks, Preserve (Full)
WORK ITEM 11: Deck Covering (Slip-Resistant), Renew
WORK ITEM 12: Bulkhead and/or Overhead Insulation, Renew
WORK ITEM 13: No.2 Main Propulsion Diesel Engine, Exhaust Piping Insulation, Renew
WORK ITEM 14: Tank Sounding Tube, Replace
WORK ITEM 15: Towline Platform, Modify
WORK ITEM 16: VCHT Room Escape Scuttle and Ladder, Install
WORK ITEM 17: Deck Covering (Polymeric), Repair and Seal
WORK ITEM 18: Mast Darken Ship Switches (Watertight Door and Scuttle), Install
WORK ITEM 19: Tenting, Provide
WORK ITEM 20: Temporary Services, Provide