Window Replacement specifications.docx
DOCX document 843 KB Posted
- Solicitation number
- 1240LU22Q0030
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_ExperienceQuestionnaire.pdf | ||
| 1240LU22Q0030 sf 18.pdf | ||
| 1240LU22Q0030 window replacement RFQ.pdf | ||
| Wage determinations.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIG. 1 East View
FIG. 2 South View
FIG. 3 North View
SECTION 01000 MOBILIZATION
PART I: GENERAL
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.
PART II: PRODUCTS
(There are no applicable requirements.) PART III: EXECUTION (There are no applicable requirements.) PART IV: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: Progress payments will be made as follows:
1. When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
2. When 10% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.
3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10% of the original Contract amount will be paid.
4. The total sum of all payments shall not exceed the original Contract amount bid for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.
4.2 BASIS OF PAYMENT:
Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
(01000) Mobilization. Lump Sum
SECTION 01025 MEASUREMENT AND PAYMENT
PART I - GENERAL
1.1 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.
When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be bid.
1.2 Determination of Quantities - The following methods of measurement are used to determine contract quantities for payment.
For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.
Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the COR in writing to fit field conditions.
For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
1.3 Units of Measurement - Payment will be by units defined and determined according to U.S. Standard measure as follows:
A. Acre – Make longitudinal and transverse measurements for area computations horizontally.
B. Cubic Yard - A measurement computed by one of the following methods:
1. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.
3. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.
D. Each - One complete unit, which may consist of one or more parts.
E. Gallon – The quantity may be measured by any of the following methods:
1. Measured volume container.
2. Metered volume. Use an approved metering system
3. Commercially packaged volumes.
F. Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor.
G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.
H. MFBM - One thousand board feet measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job.
I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.
J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.
K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal.
L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal.
M. Station - One hundred linear feet measured horizontally.
N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.
O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.
P. Ton - Short ton consisting of 2,000 pounds.
Q. Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile.
1.4 Methods of Measurement - One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:
A. Contract Quantities (CQ) AND Design Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
1. As a result of changes in the work authorized by the Contracting Officer.
2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by more than 15 percent.
3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by more than 15%. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.
C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.
D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.
E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
PART II - PRODUCTS (Not Applicable) PART III - EXECUTION (Not Applicable)
END OF SECTION
SECTION 01400
QUALITY CONTROL AND QUANTITY MEASUREMENT
PART I - GENERAL
1.1 Scope - This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 Measurement and Payment - No separate payment will be made for the work included under this section. Payment for this work is considered incidental to other items of work.
PART II - PRODUCTS (Not Applicable) PART III – EXECUTION (Not Applicable)
END OF SECTION
SECTION 07000 BUILDING MAINTENANCE
PART I - GENERAL
1.1 Scope - Furnish all labor, materials, and equipment required to remove and dispose of existing windows, complete installation of all new windows and related work as indicated. Submit all instructions, warranties, specifications, and color samples to the Contraction Officer (C.O.) for approval.
PART II - PRODUCTS
2.1 Materials:
A. Windows shall be Alside Series 80 or equal product and manufacturer, vinyl windows, Low E 366, U-factor = 0.29 or better for bidding purposes.
See Window Schedule for window sizes (for bidding purposes only – Contractor is responsible for final window measurements before ordering). Contractor will be responsible for the protection and condition of the windows. Damage to the windows during installation shall be repaired or replaced by the contractor.
B. Bat or Foam Insulation shall be put in place around windows to ensure a weatherproof install.
C. Fasteners shall be exterior grade screws, 2.5” screws where windows are installed over exterior insulating foam and 2” screws when installed directly to sheathing/framing.
D. Sealants, to include window tape, caulk or silicone
2.2 Submittals
A. Submit product information, color samples, warranties, and manufacturer installation instructions before ordering for the following:
Windows Fasteners Exterior Trim Insulation Exterior Sealant (caulk/silicone, window tape) Exterior Paint Installation Instructions per window manufacturer Safety plan
Written approval from the CO is required prior to ordering materials. Allow 7 days for CO approval.
PART III - EXECUTION
3.1 Installation
A. Before ordering windows, installing windows, or starting work, verify governing dimensions at buildings: examine, clean and repair, replace if necessary, any adjoining work on which this work is in any way dependent for its proper installation. Submit warranty, specifications, and installation instructions to C.O. prior to construction. The Contractor is required to provide any additional materials or appurtenances in order to properly install and finish all items. All costs for completing any item shall be included in bid items in the schedule.
B. Install all items according to manufacturer’s instructions, Latest Version of the International Building Code, and according to industry standard. All items shall be neat, straight and weather tight. A professional installation is required.
C. Irregular surfaces, as is typical of older structures, may be encountered. The Contractor will be required to compensate for those irregularities, so the finished work is both structurally sound and conforming to the standards of the industry.
D. Wood trim on the exterior and interior shall be salvaged. The contractor will not be required to reinstall the interior trim.
E. Some of the windows are located on the second floor of the building as shown in Figure
3. All OSHA and safety precautions shall be followed during the project.
PART IV – PAYMENT
A. Payment shall be as shown on the schedule of items.
SECTION 085000 – WINDOWS AND TRIM
PART 1 - GENERAL
SECTION REQUIREMENTS
Submittals: Installation materials Fasteners Insulation Exterior Sealant (caulk/silicone, window tape) Installation method, such as: scaffold, boom lift. Safety plan
PRODUCTS WINDOWS
Per Section 085213
EXTERIOR TRIM
A. Trim: Exterior trim shall be Smart Side to match existing trim. Caulk reinstalled trim-siding interface tocreate a weatherproof seal. Caulk color to match trim.
B. Fasteners: Fasteners to be galvanized ring-shank nails or screws, long enough to penetrate framingminimum 1.5”, or per trim manufacturer instructions.
C. Flashing: Retain metal flashing over window trim and under siding above.Install per Code requirements and manufacturer’s instructions.
INTERIOR TRIM
A. Trim: Interior trim shall be of the similar material, shape and size of existing interior trim, purchased, painted or stained to match existing with a professional appearance. Touch up paint to be used as needed.
B. Fasteners: Fasteners to be galvanized trim nails, long enough to penetrate framing minimum 1.5”. Putty,caulk and paint nail holes for a professional finished product.
EXECUTION
INSTALLATION
A. Install per manufacturer’s instructions, in compliance with current ICC Commercial Code.
B. Set units level, plumb, and true to line, without warp or rack of frames and panels. Provide proper support and anchor securely in place.
C. Set sill members in bed of sealant or with gaskets, as indicated, to provide weathertight construction.
D. Install window sealing tape around all windows. Insulate gaps between new windows and framing withfiberglass or foam insulation.
E. Adjust operating panels, screens, and hardware to provide a tight fit at contact points and weatherstripping for smooth operation and weathertight closure.
F. Clean glass and vinyl surfaces immediately after installing windows. Remove nonpermanent labels from glass surfaces.
END OF SECTION 08500
SECTION 08565
VINYL WINDOWS AND PATIO DOORS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Vinyl windows and patio doors.
1.2 RELATED SECTIONS
A. Section 054000 - Cold-Formed Metal Framing.
B. Section 061000 - Rough Carpentry.
C. Section 079200 - Joint Sealants.
1.3 REFERENCES
A. AAMA/NWWDA 101/I.S. 2-97 - Voluntary Standard for Aluminum and Poly (Vinyl Chloride) (PVC) Prime Windows and Glass Doors American Architectural Manufacturers Association (AAMA)
1. AAMA/WDMA/CSA 101/I.S.2/A440-08 North American Fenestration Standard/Specification for windows, doors, and skylights.
2. AAMA 506 Voluntary Specification for Hurricane Impact and Cycle Testing of Fenestration Products.
B. American Society for Testing and Materials (ASTM):
1. ASTM E1886 Standard Test Method for Performance of Exterior Windows, Curtain Walls, Doors, and Impact Protective Systems Impacted by Missile(s) and Exposed to Cyclic Pressure Differentials
2. ASTM E1996 Standard Specification for Performance of Exterior Windows, Curtain Walls, Doors, and Impact Protective Systems Impacted by Windborne Debris in Hurricanes.
C. National Fenestration Rating Council (NFRC):
1. NFRC 100 - Thermal Properties; National Fenestration Rating Council.
2. NFRC 200 - Solar Heat Gain; National Fenestration Rating Council.
D. IGCC - Classification of Insulating Glass Units; Insulated Glass Certification Council.
E. U.S. Department of Energy - Energy Star Windows Program.
1.4 SUBMITTALS
A. Submit under provisions of Section 013000.
B. Product Data:
1. Manufacturer's standard details and catalog data demonstrating compliance with referenced standards; include manufacturer's standard installation instructions.
2. Manufacturer's product drawings showing details of fabrication, hardware, weatherstripping, fasteners, screens, glazing, accessories, and related items.
C. Shop Drawings: Manufacturer's field measured openings, window and door schedules including all dimensions, finishes, accessories, and site specific installation details.
D. Verification Samples: Operating sample of each window type specified illustrating fabrication, hardware, glazing, screen, and finish.
E. Test Reports: For each window type specified, furnish test reports from accredited independent testing laboratory certifying that identical or larger window units meet requirements specified for air infiltration, water penetration and structural performance by AAMA/WDMA/CSA
101/I.S.2/A440-08, for thermal performance by NFRC-97, and for seal integrity of insulating glass units by IGCC.
1. Test reports to test standards other than those listed will not be accepted.
F. Closeout Submittals: Warranty documents, properly executed.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: Minimum ten years experience producing vinyl (PVC) windows and doors of the quantity and complexity required for this project, and capable of sending an authorized representative to the project site for field measurements and periodic installation inspections.
B. Installer Qualifications: Minimum 2 years experience and acceptable to the manufacturer.
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver windows to project site in undamaged condition; handle windows to prevent damage to components and to finishes.
B. Store windows out of contact with ground; protect windows from weather and construction traffic in well-ventilated area.
1.7 WARRANTY
A. Furnish manufacturer's standard limited warranty against deficiencies in materials or fabrication.
1. Lifetime Limited Warranty. PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer: Alside , which is located at: 3773 State Rd.; Cuyahoga Falls, OH 44223; Toll Free Tel: 800-922-6009; Tel: 330-922-5350; Fax: 330-922-5387;
B. Substitutions of equal product and manufacturer permitted.
2.2 VINYL WINDOWS AND PATIO DOORS
A. New Construction, 80 Series, Alside vinyl windows:
1. Single Hung Windows:
a. Model: A581.
b. Performance Class and Grades as Tested: LC-PG45 to 50 and LC-PG25.
c. Glazing: Manufacturer's standard insulating glass unit with low-e coating.
2. Three-Lite Slider Windows:
a. Model: A283.
b. Performance Class and Grades as Tested: LC-PG20 to 40 and R-PG20.
c. Glazing: Manufacturer's standard insulating glass unit with low-e coating.
2.3 FABRlCATlON
A. Frames:
1. Material: PVC (Vinyl)
2. Reinforcement: Manufacturer’s standard
a. Composite
3. Insulation: Manufacturer’s standard
4. Thermal Break: Manufacturer’s standard
5. Locks: Manufacturer’s standard
B. Glass:
1. Glass Packages: Manufacturers standard configurations of annealed or laminated glass with air or argon interspace with varying acoustical and thermal performance in accordance with current published test results.
2. Energy Efficiency: Manufactures ClimaTech multi-layered low-emissivity (Low-E) glass and argon gas with one of the following warm edge spacers:
a. PPG Intercept: One-piece metal alloy in U-channel design.
3. Insulated Glass Thickness:
a. Typical, Single Strength: 3/4 inch.
2.4 FlNlSHES
A. Exterior Window Color:
1. White.
B. Interior Window Color:
1. White.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verification of Conditions: Openings are in correct location, and of correct size, in accordance with approved shop drawings and manufacturer's installation instructions.
B. Installer's Examination:
1. Have installer of this section examine conditions under which construction activities of this section are to be performed, then submit written notification if such conditions are unacceptable.
2. Transmit two copies of installer's report to Architect within 24 hours of receipt.
3. Beginning construction activities of this section before unacceptable conditions have been corrected is prohibited.
4. Beginning construction activities of this section indicates installer's acceptance of conditions.
3.2 INSTALLATION
A. Install products specified in this section square, plumb and level, in accordance with approved shop drawings and manufacturer's installation instructions.
B. Installation of flashing is specified in Section 07620.
C. Installation of joint sealers is specified in Section 07900.
3.3 ADJUSTING
A. Adjust operating hardware for correct operation in accordance with manufacturer's installation instructions.
3.4 CLEANING
A. Clean interior and exterior surfaces free of labels, mortar, plaster, paint, joint sealers, and other foreign matter to prevent damage to weatherstrip, and to prevent interference with operation of hardware.
3.5 PROTECTION
A. Protect ventilators and operating parts from dirt and damage caused by subsequent construction activities.
B. Replace units damaged by subsequent construction activities.
3.6 WINDOW AND DOOR SCHEDULE
Window Schedule
(inches)
| Width (Inches) |
| Count |
Triple Unit – Picture with Single Hung
58 - 1/16
| 93 - 3/8 |
| 1 |
Single Hung
| 71 - 3/8 |
| 32 |
| 2 |
Single Hung
| 59 - 3/8 |
| 35 - 7/8 |
| 4 |
Single Hung
| 35 - 3/8 |
| 31 - 7/8 |
| 1 |
Triple Unit – Picture with Single Hung
| 53 |
| 100 - 1/4 |
| 1 |
Single Hung
50 – 5/8
| 48 |
| 1 |
* Sizes are approximate, for bidding purposes, and shall be field verified by Contractor prior to ordering image1.jpeg image2.jpeg image3.jpeg