Fed_Bid_RFQ_Window_Treatments.docx
DOCX document 16 KB Posted
- Attached to
- Window Treatments
- Solicitation number
- WESTPOINTSoGSSF0001
- Issued by
-
Department of the Army
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SCR_East.JPG | JPG image | |
| B_F_CSM.JPG | JPG image | |
| SCR_2.JPG | JPG image | |
| B_and_C_both.JPG | JPG image | |
| Rep_B_lower_and_G_upper.JPG | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
UNITED STATES MILITARY ACADEMY
West Point, New York 10996
MACS 25 May 2018
REQUEST FOR QUOTE
Custom Window Treatments 2nd Floor, Taylor Hall West Point, NY 10996
1. SCOPE OF WORK: The requirement is to manufacture and install custom window treatments, which requires verification of customer measurements, installation, and disposal of existing window treatments on the Second Floor, Building 600 (Taylor Hall), West Point, NY 10996.
| Definitions: | |
| * Existing window treatments include motorized shades, mini-blinds and draperies. | |
| * Remove existing window treatments includes the “treatment” and any | hardware (e.g. brackets, curtain rods, etc.). |
| * Disposal means removal off-post. |
2. TASKS:
| a. Manufacture custom window treatments to replace four (4) existing motorized shades in the Superintendent’s Conference Room. New motorized shades must meet the following specifications: | |
| (1) Replacement shades must be motorized roller shades (Blackout) with wireless remote control. | |
| (2) The motorized shades will be installed in windows with existing side channels. | |
| (3) To provide new wireless remote with pre-set limit. | |
| (4) To function independently on new wireless system. | |
| (5) This task may require the removable and re-installation of the existing cornices/valances. | |
| (6) Color: Linen | |
| (7) Remove and dispose of existing motorized shades. |
NOTE: These windows are located approximately 114” above the finished floor.
b. Manufacture custom window treatments to replace existing 28 window treatments (approximate size 25” x 52”) with manual roller shades with decorative head rail strip (fabric insert – PolyScreen 650 5%). Color: Blanco Linen. Remove and dispose of existing window treatments.
c. Manufacture custom window treatments to replace existing three (3) window treatments (approximate size 69” x 39”) with rechargeable battery operated roller shades and decorative head rail strip (fabric insert - PolyScreen 650 5%), with wireless remote. Color: Blanco Linen. Remove and dispose of existing window treatments.
d. Manufacture custom window treatments to replace existing two (2) window treatments (approximate size 24” x 78”) with manual roller shades. Remove and dispose of existing window treatments.
e. Install a decorative head rail strip (fabric insert – PolyScreen 650 5%) should be a single (1) unit with approximate size 80” x 28:”. Color: Blanco Linen.
f. Manufacture custom window treatments to replace existing six (6) window treatments (approximate size 25” x 36””) with rechargeable battery operated roller shades and decorative head rail strip (fabric insert - PolyScreen 650 5%), with wireless remote. Color: Blanco Linen. Remove and dispose of existing window treatments.
g. Manufacture custom window treatments to replace existing four (4) window treatments (approximate size 110” x 60”) with manual roller shades with decorative head rail strip (fabric insert – PolyScreen 650 5%). Color: Blanco Linen. Remove and dispose of existing window treatments.
h. Install a decorative head rail strip (fabric insert – PolyScreen 650 5%) should be a single (1) unit with approximate size 70” x 60:”. Color: Blanco Linen.
i. Install a decorative head rail strip (fabric insert – PolyScreen 650 5%) should be a single (1) unit with approximate size 36” x 60””. Color: Blanco Linen.
j. Install a decorative head rail strip (fabric insert – PolyScreen 650 5%) should be a single (1) unit with approximate size 32” x 60”:”. Color: Blanco Linen.
3. CONTRACTOR FURNISHED EQUIPMENT (CFE) Contractor will provide all necessary tools to conduct the installation of materials for this effort.
4. PERIOD AND PLACE OF PERFORMANCE: Period of Performance is, at most, one month from date of award.
5. CONTRACTOR MANPOWER REPORTING APPLICATION (CMRA) REQUIREMENTS Contractor Manpower Reporting Application (CMRA) Requirements. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Military Academy via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil.
4. Any questions should be directed to the undersigned, x4200.
| Encl | JUSTIN L. MILLER | |
| Representative Photos | LTC, LG | |
| Secretary of the General Staff |
File details come from the government source that posted it.