Western_Attachment_4_-_Pricing_Sheet.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Master Agreement AZ|CTR060743
- Contract number
- CTR060743
- Issued by
- Arizona
About this file
This document is a Pricing Sheet from a Request for Proposal (RFP No. BPM004175) for Statewide Tanks Services, issued by the Arizona Department of Environmental Quality (ADEQ). The document specifically details a contract with Western Technologies, Inc. as the offeror, presenting comprehensive labor rates and equipment pricing for environmental and underground storage tank (UST) related services.
The pricing schedule includes detailed labor rates across multiple skill levels, ranging from Support Level I clerical staff at $35/hour to Principal-level professionals at $130/hour, with qualifications based on experience and educational background. The equipment pricing section provides daily, weekly, and monthly rental rates for various specialized environmental testing and monitoring equipment, including multi-gas meters, pumps, sampling equipment, air compressors, and soil vapor extraction (SVE) systems. Equipment rental rates vary from $40 to $8,000 depending on the specific technology and rental duration, with options for daily, weekly, and monthly pricing. The contract appears designed to provide flexible, comprehensive environmental services with transparent, predefined pricing for labor and equipment.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Attachment 4 - Pricing Sheet Request for Proposal No. BPM004175 Statewide Tanks Services Offeror Company Name: Western Technologies, Inc.
PRICE SCHEDULE (WESTERN TECHNOLOGIES, INC.) TANKS - LABOR RATES
SOLICITATION ADEQ
| POSITION | DESCRIPTION | HOURLY RATE (whole number only) | ||
| Field Project | ||||
| (Section 2A • Scooe of Work 5.1 • 5.41 | Capacity Support |
(Section 2A - Scooe of Work 5.5)
| Support Level I | Clerical, word processing, filing, copying, general administration. No experience required. No education requirements. | $35 | NA | |||||||||||||||
| Support Level II | Drafting, project manage(s assistant, graphics. 1-2 years experience. No education requirements. | $40 | NA | |||||||||||||||
| Support Level Ill | Drafting supervisor, senior word processor, administrative supervisor. 2-4 years experience. No education requirements. | $50 | NA | |||||||||||||||
| Field Level I | Closely supervised, conducts routine heavy labor during equipment installations, sampling/ gauging, equipment maintenance . Entry level , 1-2 years experience. No education requirements. | $35 | NA | |||||||||||||||
| Field Level II | Limited supervision, occasional heavy labor, sampling/ gauging, equipment installations, operations, troubleshooting. 2-4 years | |||||||||||||||||
| experience. No education requirements. | $45 | NA | ||||||||||||||||
| Field Level Ill | Supervises on-site tasks such as system installation and operations, trouble shooting; technical advisor. 5-7 years experience. No | |||||||||||||||||
| education requirements. | $54 | NA | ||||||||||||||||
| Field Staff | Limited supervision, experience specific to Scope of Work. Independent field work and/or specialist. 7-9 years experience/special knowledge or expertise in field. No education requirements. | $55 | NA | |||||||||||||||
| Field Services Manager | Overall supervision of field services staff, works with Project Managers on scheduling and coordination. 7-9 years experience. Bachelors of Science (BS) degree in applicable field of study or 15+ years experience. | $57 | NA | |||||||||||||||
| Professional Level I | Close supervision, routine tasks associated with environmental projects. 1-2 years experience. Bachelors of Science degree. | $65 | NA | |||||||||||||||
| Professional Level II | Collects and interprets data, report writing, provides project input. 2-4 years of experience. Bachelors of Science degree. | $75 | NA | |||||||||||||||
| ProfessionalLevel Ill (Staff) | Responsibilities:Limited supervision, independent fieldwork, oversees Professional Levels I and II. Qualifications No. 1: 6 - 8 years of experience with Bachelor of Science (BS) degree or registration (PE or RG) | |||||||||||||||||
| Qualification No. 6: 5 - 7 years of experience with Masters degree. | $85 | NA | ||||||||||||||||
| Professional Level IV (Project) | Responsibilities:Managesprojects of moderate scope, prepares cost estimates, supervises others. Qualifications No. 1: 9 - 12 years experience with Bachelor of Science (BS) degree or registration (PE or RG). Qualification§ No. 2: 8 - 11 years of experience with Masters degree. | $100 | NA | |||||||||||||||
| Professional Level V (Senior) | Senior techinical leader for environmental projects, QA of project plans, report review. 8+ years of experience and advanced degree in field, or reoistration /PE or RGl . | $110 | NA | |||||||||||||||
| Professional Level VI (Principle) | Recognized registered professional, resident expert, expert testimony, QA of project plans and report review and/or oversees and coordinates all levels of personnel, senior technical leader and has signature authority. | $130 | NA | |||||||||||||||
| Qualifications - 5 or more years in field project fo011ulation, survey, excavation and technical reporting experience. Doctorate Education #1 degree and registration as PE or RG. or Doctorate degree in Risk Assessment or Toxicology. | ||||||||||||||||||
| Qualifications - 12 or more years of experience. Advanced degree in field and registration as PE or RG or advanced degree in Risk Education #2 Assessment or Toxicology. | ||||||||||||||||||
| Qualifications - 20 or more years in field project fo011ulation, survey, excavation and technical reporting experience. Bachelors of Education #3 Science (BS) degree in applicable field of study. | ||||||||||||||||||
| PRICE SCHEDULE (WESTERN TECHNOLOGIES, INC.) TANKS - EQUIPMENT | ||||||||||||||||||
| - -- | SOLICITATION ADEQ | - - - - - | - - - - | - -- - | ||||||||||||||
| Category of Work | -- - | --. - - - - - .- - | -- - ---- | --- | ||||||||||||||
| UST Permanent Closure | Site Investigation | Remedial Design & Implementation | Equipment Name | Price Per Day (whole number) | Price Per Week (whole number) | Price Per Month (whole number) | ||||||||||||
| Required | Required | Required | Multi-Gas Meter or Lower Explosive Limit/ Oxygen Meter | $90 | $270 | $810 | ||||||||||||
| Required | Required | Required | Photoionization Detector | $90 | $270 | $810 | ||||||||||||
| Required | Required | Required | Generator (small; field-usage) | $85 | $255 | $765 | ||||||||||||
| Not Required | Required | Required | Interface Probe - Oil / Water (200 ft) | $85 | $255 | $765 | ||||||||||||
| Not Required | Required | Required | Water Level Indicator (200 ft) | $40 | $120 | $360 | ||||||||||||
| Not Required | Required | Required | Bladder ($18 each) | |||||||||||||||
| Not Required | Required | Required | Bladder Pump | $75 | $225 | $675 | ||||||||||||
| Not Required | Required | Required | Bladder Pump Controller | $75 | $225 | $675 | ||||||||||||
| Not Required | Required | Required | Sampling Tubing ($.50 per foot) | |||||||||||||||
| Not Required | Required | Required | Submersible Pump (RediFlo 2 200 ft) | $180 | $540 | $1,620 | ||||||||||||
| Not Required | Required | Required | Submersible Pump Controller | $75 | $225 | $675 | ||||||||||||
| Not Required | Required | Required | Pneumatic Pump | $60 | $180 | $540 | ||||||||||||
| Not Required | Required | Required | Vacuum Pump (gas sample collection) | $60 | $180 | $540 | ||||||||||||
| Not Required | Required | Required | Aquifer Pump Testing Equipment | $315 | $945 | $2,835 | ||||||||||||
| Not Required | Required | Required | Aquifer Slug Testing Equipment | $75 | $225 | $675 | ||||||||||||
| Not Required | Required | Required | Free Product Bail-Down Testing Equipment | $100 | $300 | $900 | ||||||||||||
| Not Required | Required | Required | Flow-Through Cell (see next line) | |||||||||||||||
| Not Required | Required | Required | Multi-Parameter Meter w/ Flow-Through Cell | $150 | $450 | $1,350 | ||||||||||||
| Not Required | Required | Required | Pressure Transducer/ Cable / Data Logger (200 ft) | $110 | $330 | $990 | ||||||||||||
| Not Required | Not Required | Required | Air Compressor | $1,000 | $3,000 | $4,000 | ||||||||||||
| Not Required | Not Required | Required | SVE - Activated Carbon | $1,500 | $5,000 | $6,000 | ||||||||||||
| Not Required | Not Required | Required | Ozone Generator I Compressor | $2,000 | $5,000 | $10,000 | ||||||||||||
| Not Required | Not Required | Required | SVE System - Activated Carbon | $1,500 | $5,000 | $6,000 | ||||||||||||
| Not Required | Not Required | Required | AS / SVE System - Activated Carbon | $3,000 | $4,000 | $5,000 | ||||||||||||
| Not Required | Not Required | Required | AS / SVE System - Catalytic Oxidation | $7,000 | $7,000 | $8,000 | ||||||||||||
| Not Required | Not Required | Required | AS / SVE System - Thermal Oxidation | $8,000 | $8,000 | $9,000 | ||||||||||||
| Not Required | Not Required | Required | Mobile AS/SVE - Catalytic Oxidizer | $5,000 | $18,000 | $75,000 | ||||||||||||
| Not Required | Not Required | Required | Mobile AS/SVE - Thermal Oxidizer | $6,000 | $20,000 | $78,000 | ||||||||||||
| Not Required | Not Required | Required | Mobile MPE/SVE - Catalytic Oxidizer | $5,000 | $18,000 | $75,000 | ||||||||||||
| Not Required | Not Required | Required | Mobile MPE/SVE - Thermal Oxidizer | $6,000 | $20,000 | $78,000 | ||||||||||||
| Not Required | Not Required | Required | SVE System - Catalytic Oxidizer | $6,000 | $7,000 | $7,000 | ||||||||||||
| Not Required | Not Required | Required | SVE System - Thermal Oxidizer | $6,000 | $7,000 | $7,000 | ||||||||||||
| Not Required | Not Required | Required | Passive Skimmer (2 in diameter) (each) | $100 | $300 | $900 |
File details come from the government source that posted it. Updated .