This is a project manual and bidding document issued by Western Connecticut State University for structural repair work at the O'Neill Athletic Center on the Westside Campus in Danbury, Connecticut. The project involves repairs to the existing boiler room ceiling concrete beams and the exterior concrete walkway bridge and adjacent concrete sidewalk near Gate 6. Western Connecticut State University is accepting sealed bids for all labor and materials required to complete this work. A mandatory pre-bid site visit is scheduled for Tuesday, July 28, 2026, at 10:30 a.m. at the Main Entrance to the O'Neill Athletic Center on the tennis court side of the building located at 7 University Boulevard, Danbury, CT. This is the only permitted site visit during the bidding phase, and contractors are required to bring any potential subcontractors to view existing conditions. Sealed bids are due on Tuesday, August 25, 2026, by 2:30 p.m. and must be submitted to Mr. Timothy Keith, Contract Compliance & Procurement Specialist, in Purchasing Office Room 008 at University Hall, 182 White Street, Danbury, CT 06810. One original and one copy are required, with bids submitted in a sealed envelope clearly marked with the bid number and project name. The Request for Information (RFI) deadline is Monday, August 3, 2026, by 4:00 p.m., with addenda to be issued no later than Friday, August 7, 2026, by 4:00 p.m. All work must be completed no later than February 10, 2027, with commencement upon issuance of the contract or letter of intent. Bids must be held for 90 calendar days following the bid opening date.
The Connecticut Department of Labor's Prevailing Wage Rates requirement applies to this project. The bid is reserved for vendors holding current SBE/MBE set-aside certification from the Connecticut Department of Administrative Services Supplier Diversity Program, and bidders must indicate their set-aside status on the bid envelope. State law requires a minimum spending allocation goal of 25 percent of the state-funded portion of the contract for award to subcontractors holding current DAS certification as Small Business Enterprises (SBE) and 6.25 percent for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled-owned businesses (M/W/DisBE). The contractor must demonstrate good faith effort to meet these spending allocation goals. Bidders must submit a 10 percent bid bond as part of their proposal, with a 10 percent Performance Bond and 10 percent Material and Labor Bond required upon contract award. The project is subject to Connecticut General Statutes requirements, Executive Orders concerning labor employment practices, workplace violence prevention, and state procurement policies. A pre-award meeting will be required with the apparent lowest qualified bidder within five calendar days of notification to review project scope, timelines, and deliverables. A letter of intent to award will be issued following the pre-award meeting and approval by the Project Manager, at which time the contractor must submit performance and labor/material bonds, certificate of insurance, certified schedule of values on AIA forms, and signed contracts from all subcontractors before the purchase order is issued.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 01 01
TITLE PAGE
WCSU BID NO.: 2026-PAD-0001 STATE PROJECT NO.: BI-RD-325
Volume 1 of 1
Project Manual
The O’Neill Center Boiler Room Bridge Structural Repairs Project – Westside Campus
Western Connecticut State University 7 University Boulevard, Danbury, CT
Project No.: WCSU-2023-19
Conlon Engineering 246 Federal Road, Suite B23
Brookfield, CT 06804
Western Connecticut State University Facilities Planning Architecture and Design
1 Fifth Avenue, Suite 001 Danbury, CT 06810
Bids Due: August 25, 2026 – 2:30pm
Mandatory Bid Site Visit: July 28, 2026 – 10:30am
Project Manual Date: June 19, 2026
WCSU Bid Number – 2026-PAD-0001
SECTION 00 01 01
TITLE PAGE
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 00 01 15
LIST OF DRAWING SHEETS
List of Drawing Sheets
Sheet No. Title
G-001 COVER SHEET
S-001 GENERAL NOTES & MATERIAL SPECIFICATIONS
S-100 BRIDGE AND BOILER ROOM FRAMING PLAN
S-200 STRUCTURAL REPAIR SECTIONS AND DETAILS
S-201 STRUCTURAL REPAIR SECTIONS AND DETAILS
End of Section 00 01 15 List of Drawing Sheets
SECTION 00 01 15
LIST OF DRAWING SHEETS
SECTION 00 01 16
INVITATION TO BID
Notice is hereby given that WESTERN CONNECTICUT STATE UNIVERSITY will accept bids for the following project:
THE O’NEILL CENTER BOILER ROOM BRIDGE
STRUCTURAL REPAIRS PROJECT
WCSU WESTSIDE CAMPUS
BID NO. 2026-PAD-0001
Western Connecticut State University is seeking bid proposals for all labor and materials required to provide for structural repairs needed for the existing Boiler Room ceiling concrete beams and the exterior concrete walkway bridge and adjacent concrete sidewalk near Gate 6 that serves the O’Neill Athletic Center located on the Westside Campus in Danbury, CT. Please note: The CT Department of Labor’s Prevailing Wage Rates requirement shall apply to this project.
The Project Manual and project related drawings are available on the State of Connecticut’s State Contracting Portal, CTsource-CT.gov. Reference Bid No.: 2026-PAD-0001.
MANDATORY SITE VISIT
All contractors are required to visit the site and verify existing conditions. A mandatory pre-bid meeting is scheduled for Tuesday, July 28, 2026, at 10:30 a.m., beginning at the Main Entrance to the O’Neill Athletic Center on the tennis court side of the building. The building’s address is 7 University Boulevard, Danbury, CT on WCSU’s Westside Campus. This is the only time you will be allowed to visit the site during the bid phase so please bring any of your potential subcontractors to view the existing conditions. No one will be allowed to revisit the building after this visit.
RFI DUE DATE AND ADDENDA
Any questions or discrepancies should be submitted in writing via email, no later than Monday August 3, 2026 by 4:00 p.m., to the WCSU’s Department of Administrative Services office, located in University Hall, WCSU, 182 White Street, Danbury, CT 06810; Attn: Timothy Keith, Contract Compliance & Procurement Specialist; e-mail: keitht@wcsu.edu. Responses to any and all inquiries shall be issued via addenda, no later than Friday, August 7, 2026, 4:00 p.m., Any and all addenda shall be posted on the State of Connecticut’s State Contracting Portal, CTsource- CT.gov.
BID DUE DATE AND BID OPENING
Sealed bids should be submitted to Mr. Timothy Keith, Contract Compliance & Procurement Specialist, University Hall, Lower Level, in Purchasing Office Room 008, Western Connecticut State University, 182 White Street, Danbury, CT 06810. Bids should be submitted on or before Tuesday, August 25, 2026, by 2:30 p.m. One (1) original and one (1) copy are required. Bidders should submit bids in a sealed envelope with words, “Sealed Bid No. 2026-PAD-0001- O’Neill Center Boiler Room Bridge Structural Repairs Project,” and the due date. Bids will be opened publicly at the aforementioned time in Lounge Room 009 adjacent to the Purchasing
SECTION 00 01 16
WCSU BID NO.: 2026-PAD-0001 STATE PROJECT NO.: BI-RD-325
Office. Bids received after that time will not be accepted. Interested parties are invited to attend.
In the event of an unexpected closing by the University at the scheduled bid due date and time (i.e. inclement weather closing), the bid due date shall default to 2:30 p.m. on the next business day the University is open (a business day defined as Monday – Friday, excluding weekends).
Closing information can be obtained via the University’s website www.wcsu.edu or via the University’s weather closing phone line, 203-837-9377.
Bids are to be based on the work called for on the sketches and specifications for the subject project, as well as any addenda issued during the bid process. Bids showing informalities, qualifications or conditions may be rejected at the option of the University. Each bidder must note receipt of any Addenda or bulletins when submitting a bid. All bidders shall verify dimensions and conditions at the site and be responsible for satisfying himself as to all requirements of the contract.
Bids must be held for a period of 90 calendar days following the date of the bid opening.
Following 90 calendar days, if attempted negotiations with the lowest bidder fail to result in a contract, the University reserves the right to re-bid the project.
Work shall commence with the issuance of the contract or letter of intent; all work must be completed no later than February 10, 202 . Commencement of work is defined as project initiation items such as schedules and submittals for processing for ordering materials. Actual construction start date shall be defined in the proposed construction schedule. Western Connecticut State University understands that the product and materials delivery times affecting the receipt of materials in a timely manner can have an impact on the actual schedule. WCSU will work with the awarded Contractor to review product and equipment delivery dates and come to a mutual completion date if this becomes an issue.
The University reserves the right to waive any technical defects in the bids, to reject any bids that do not conform to the terms described herein, and to accept or reject any part of any bid, and to reject all bids and, again, invite bids.
END OF SECTION
ADMISSIONS OFFICE (203) 837-9000
ACCESSABILITY SERVICES (203) 837-8278
BOOKSTORE (203) 837-8464
CASHIER’S OFFICE (203) 837-8381
DEAN OF STUDENTS (203) 837-8547
FINANCIAL AID & STUDENT EMPLOYMENT (203) 837-8580
HOUSING & RESIDENCE LIFE (203) 837-8531
REGISTRAR’S OFFICE (203) 837-9200
INFORMATION DESK (203) 837-8200
ANCELL SCHOOL OF BUSINESS (203) 837-9600
MACRICOSTAS SCHOOL OF ARTS & SCIENCES (203) 837-9400
SCHOOL OF PROFESSIONAL STUDIES (203) 837-9500
SCHOOL OF VISUAL & PERFORMING ARTS (203) 837-8851
TO MIDTOWN CAMPUS (181 White Street)
From the East: Take Exit 5 off I-84 to first traffic light (Clapboard Ridge Road); turn right and contin-ue on Main Street to White Street (fifth traffic light);
turn left onto White Street and continue one-half mile to campus on left.
From the West: Take Exit 5 off I-84 to first traffic light (Main Street); turn right and continue on Main Street to White Street (fourth traffic light); turn left onto White Street and continue one-half mile to campus on left. Visitor parking is available in the lot adjacent to Old Main on the Midtown campus.
TO WESTSIDE CAMPUS (43 Lake Ave. Extension)
Take Exit 4 off I-84; turn right onto Lake Avenue.
Travel approximately one mile to campus entrance on right.
CAMPUS-TO-CAMPUS
Midtown to Westside: Follow White Street and take a right onto Main Street (third traffic light).
Follow Main Street to third traffic light (Main Street becomes Clapboard Ridge). Turn left onto I-84 West. Take Exit 4 off I-84. Turn right onto Lake Avenue. Travel approximately one mile. Campus entrance is on the directly across from Stop & Shop. General parking is available along University Boulevard.
Westside to Midtown: Turn left onto Lake Avenue for approximately one mile. Turn left onto I-84 East (third traffic light). Take Exit 5 off I-84 to first traffic light (Main Street). Turn right and continue on Main Street to White Street (fourth traffic light). Turn left onto White Street and continue one half mile. The campus is on the left.
White Street (Route 6)CityCenter Danbury, Interstate 84, Railroad Station
Danbury Hospital
Osborne Street
F if th A ve n u e
N in th A ve n u e
Eig h th A ven u e
Wheelchair Access Emergency Callbox Handicapped Parking
HallUniversity
Parking Garage
Higgins Hall
Higgins Annex
Facilities Operations & Central Steam Plant
Litchfield Hall
Newbury Hall
Health & Wellness Center
Fairfield Hall
Student Center
Old Main
WESTERN CONNECTICUT STATE UNIVERSITY MIDTOWN CAMPUS
Map is not to scale.
D
r. Jam e s R o ach
A ve n u e
Alumni & Friends Circle
Quad
Centennial Grove
Warner Hall
White Hall
CCCCCCCCCCCCCCCCCCeCeCeCeeenntteCCee te
Parking Garage
Haas Library
N in th A ve n u e
Science Building
Alumni Hall
Berkshire Hall
Police
Western Connecticut State University Midtown Campus 181 White Street Danbury, CT 06810
Commuter Parking
WESTERN CONNECTICUT STATE UNIVERSITY WESTSIDE CAMPUS
Map is not to scale.
Western Connecticut State University Westside Campus 43 Lake Avenue Ext Danbury, CT 06811
Lake Avenue
University Grounds, Nature Preserve & Magnet School
Wheelchair Access Emergency Callbox Handicapped Parking
University Boulevard
Access Road
Observatory
Classroom Building
Athletics Complex
Practice Field
Baseball FieldBaseball Field
Pinney Hall
Campus Center
Visual & Performing Arts Center
Ives Concert Park
Tennis Courts
O’Neill Center
Grasso Hall
Parking Garage
Centennial Hall
WCSU Bid No.: 2026-PAD-0001 State Project No.: BI-RD-325
University Hall 182 White Street Bid Drop Location
University Hall
The O'Neill Athletic Center 7 University Boulevard Westside Campus
O’Neill Center
WCSU Bid No.: 2026-PAD-0001 State Project No.: BI-RD-325
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
A. Bids are to be based on the work called for on the drawings and specifications for the subject project, as well as any addenda issued during the bid process. Bids showing informalities, qualifications or conditions may be rejected at the option of the University.
The University reserves the right to waive any technical defects in the bids, to reject any bids that do not conform to the terms described herein, and to accept or reject any part of any bid, and to reject all bids and again invite bids.
B. Time limits will be as here-in-forth set:
1. All work shall commence with the issuance of the contract or letter of intent;
shop drawing submittal schedule must be submitted within ten (10) days after the award of the contract.
2. All work must be completed no later than February 10, 2027. Please see
Instructions to Bidders for additional information.
C. Addenda – Any addenda issued to this bid will be posted on the State of Connecticut Department of Administrative Services’ website bid portal, under Western Connecticut State University’s (WCSU) bid postings. The DAS website is CTsource. Each bidder must note receipt of any Addenda or bulletins when submitting a bid.
D. The bidding documents are as follows:
1. Project Manual entitled “The O’Neill Center Boiler Room Bridge Structural Repairs Project”, dated June 19, 2026.
2. Drawings entitled “The O’Neill Center Boiler Room Bridge Structural Repairs Project”.
E. The bid package will contain the following:
WCSU Bid Form – This will contain the costs to provide all of the work shown or called for in the contract documents.
CHRO State Spending Allocation Goals - This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. State law requires a minimum spending allocation goal of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification as Small Business Enterprises (“SBE”) from the Connecticut Department of Administrative Services (“DAS”).
A minimum spending allocation goal of 6.25% of the state-funded portion for subcontractors holding current DAS certification as Minority-, Women-, and/or Disabled-owned businesses (“M/W/DisBE”). The contractor must demonstrate good faith effort to meet the 25% spending allocation goals.
Checklist Items – All other required documentation must be submitted in order, as per the “Bid Submission Checklist Form.”
F. Bids must be held for a period of 90 calendar days following the date of the bid opening. Following 90 calendar days, if attempted negotiations with the lowest bidder fail to result in a contract, the University reserves the right to re-bid the project.
G. All bidders will verify dimensions and conditions at the site and be responsible for satisfying himself as to all requirements of the contract.
H. All bids will assume that any and all electrical work shall be executed by licensed electricians, in accordance with current codes.
I. Mandatory Pre-bid Meeting – All contractors are required to visit the site and verify existing conditions. A mandatory pre-bid meeting is scheduled for Tuesday, July 28, 2026, at 10:30 a.m., beginning at the Main Entrance to the O’Neill Athletic Center on the tennis court side of the building. The building’s address is 7 University Boulevard, Danbury, CT on WCSU’s Westside Campus. This is the only time you will be allowed to visit the site during the bid phase so please bring any of your potential subcontractors to view the existing conditions. No one will be allowed to revisit the building after this visit.
J. Inquiry Period - Any questions or discrepancies should be submitted in writing via
Any questions or discrepancies should be submitted in writing via email, no later than Monday August 3, 2026 by 4:00 p.m., to the WCSU’s Department of Administrative Services office, located in University Hall, WCSU, 182 White Street, Danbury, CT 06810; Attn: Timothy Keith, Contract Compliance & Procurement Specialist; e-mail:
keitht@wcsu.edu . Responses to any and all inquiries shall be issued via addenda, no later than Friday, August 7, 2026, 4:00 p.m., Any and all addenda shall be posted on the State of Connecticut’s State Contracting Portal, CTsource-CT.gov.
K. Bid Opening – Sealed bids should be submitted to Timothy Keith, Contract
Compliance & Procurement Specialist, University Hall, Lower Level, in Purchasing Office Room 008, Western Connecticut State University, 182 White Street, Danbury, CT 06810. Bids should be submitted on or before Tuesday, August 25, 2026, by 2:30 p.m. One (1) original and one (1) copy are required. Bidders should submit bids in a sealed envelope with words, “Sealed Bid No. 2026-PAD-0001 - O’Neill Center Boiler Room Bridge Structural Repairs Project,” and the due date. Bids will be opened publicly at the aforementioned time in Lounge Room 009 adjacent to the Purchasing Office. Bids received after that time will not be accepted.
L. Bonds – Please provide the following as part of the Bid - 10% Bid Bond. A 10%
Material and Labor Bond and 10% Performance Bond are not required as part of the bid but will be required as part of the award of Contract.
SECTION 00 21 14
SPECIAL BID PROVISIONS
SPECIAL BID PROVISION
In our continuing effort to assist in the economic development of Connecticut’s small and minority business enterprises, this Invitation to Bid is reserved for vendors holding a current SBE/MBE set-aside certificate from the State of Connecticut Department of Administrative Services (DAS) Supplier Diversity (Set-Aside) Program. Please note, set-aside certificates that will have expired prior to the bid opening date, but are pending recertification approval by the DAS, do not qualify.
Set-Aside Bidder Requirements
Bidders are required to provide a copy of the company’s current certification. Also, DAS-certified bidders must indicate their Set-Aside status by writing SBE/MBE on the lower left-hand corner of the envelope in which the bid is submitted.
How to Obtain a Set-Aside Application
For information regarding eligibility requirements, and to obtain certification or re-certification applications, please contact:
Department of Administrative Services Supplier Diversity Program 165 Capitol Avenue Hartford, CT 06106 Phone: 860-713-5236
OR
Visit their website at www.das.state.ct.us and click on “Supplier Diversity” under the “Services to Businesses” heading.
SECTION 00 21 14
SPECIAL BID PROVISIONS
SECTION 00 21 15
NOTICE TO BIDDERS
1.01 BIDS AND REJECTION OF BIDS
A. Bids shall be submitted only on the FORM OF PROPOSAL furnished for this Project. In no event will bids or changes in bids made by telephone or telegraph be considered. Any bid form omitting or adding items, altering the form, containing conditional or alternative bids will be rejected. Bids showing irregularities of any kind, or without the original signature of the Bidder or its authorized representative, will be rejected.
B. Any bid received after the scheduled closing time for the receipt of bids will not be considered.
C. Any bid once received by the Purchasing Department may only be withdrawn by letter of request, signed by the Bidder and approved by the Purchasing Officer prior to the time specified for the opening of the bids in the Invitation to Bid.
D. General bids shall be for the complete work as specified and shall include the names of any subcontractors and the dollar amounts of their subcontracts, and the general contractor shall be selected on the basis of such general bids.
It shall be presumed that the general Bidder intends to perform with its own employees all work for which no subcontractor is named. The general Bidder's qualifications for performing such work shall be subject to review under Section 4b-92 and Section 4a-93 of the Connecticut General Statutes.
E. Every general bid which is conditional or obscure, or which contains any addition not called for shall be invalid. The Agency shall reject every such general bid. The Agency shall be authorized to waive minor irregularities which it considers in the best interest of the Agency, provided the reasons for any such waiver are stated in writing by the Agency and made a part of the contract file. The Agency shall be authorized to reject any general bid which fails to include price or subcontractor information as requested on the Form of Proposal.
F. General Bids shall be publicly opened and read by the Agency. The Agency may require, in the Form of Proposal that the prospective general contractor agree to perform a stated, minimum percentage of work with his own forces.
The Agency may also require the prospective general contractor to set aside a portion of the contract for subcontractors who are eligible for set aside contracts. The Agency shall not permit the substitution of a subcontractor for one named in accordance with the provisions of this section, or the substitution of a subcontractor for any subtrade work designated to be performed by the prospective general contractor's own forces, except for good cause. The term "good cause" includes but is not limited to a subcontractor's, or where appropriate, a general contractor's: (1) Death or physical disability, if the listed subcontractor is an individual; (2) dissolution, if a corporation or partnership; (3) bankruptcy; (4) inability to furnish a Performance Bond or a Labor and Material Bond, in accordance with the requirements of these Contract Documents; (5) inability to obtain, or the loss of, any license(s) necessary for the performance of any portion of the Work;
(6) failure or inability to comply with any requirement of law applicable to contractors, subcontractors, construction, alteration, or repair projects; (7) failure to perform its agreement to execute a subcontract under Section 4b-96 of the Connecticut General Statutes.
G. The Proposed Contract Price shall be the Lump Sum Price set forth in the space provided on the Form of Proposal. Failure to correctly state a subcontractor's bid or the failure to name any subcontractor, as required by Section 4b-93 of the Connecticut General Statutes, shall be cause for the Agency's rejection of the general Bidder's bid. The Agency may waive minor errors in naming a subcontractor, as long as the name(s) of the subcontractor(s) is/are clearly identifiable on the Form of Proposal.
H. Per Connecticut General Statute Sec. 4b-94, agency reserves the right to reject any or all general bids if (1) the agency determines that the general bidder or bidders involved are not competent to perform the work as specified, based on objective criteria established for making such determinations, including past performance and financial responsibility, (2) the low bid price exceeds the amount of money available for the project, (3) the agency determines that the project shall not go forward or (4) the agency finds cause to reject such bids
1.02 ADDENDA AND DOCUMENT INTERPRETATION
No interpretations the meaning of the Plans, Specifications, or other Contract
Documents will be made orally to any Bidder. Every request for such interpretation shall be made in writing to the Architect at least ten (10) days prior to the date specified for the opening of bids. Any and all interpretations of the Contract Documents will be in the form of written addenda to those Documents. Such addenda shall be posted at http://www.CTsource-CT.gov It shall be the responsibility of prospective bidders and other interested parties to familiarize themselves with the web site and visit it regularly during the RFQ process for updated information or addenda related to this RFQ.
Receipt of addenda must be acknowledged by each bidder, and the failure of a bidder to acknowledge any addendum shall not relieve the bidder of the responsibility for complying with the terms thereof. All addenda must be signed by an authorized respondent representative and returned with the bid documents at the time of bid submittal.
1.03 BONDS
A. Performance Bond: For all general bids in excess of $50,000.00, the
Apparent Lowest Qualified Bidder, upon being notified by the Agency of its apparent lowest qualified Bidder status, shall within ten (10) days after notification thereof, substitute for the Bid Security accompanying his bid, a properly executed Performance Bond, in the form provided herein, in the amount of one hundred (100%) percent of the Contract Price. The Bond shall be conditioned upon the faithful performance of the Contract and having as surety thereto such Surety Company or Companies acceptable to the Agency and as are authorized to transact business in this State.
B. Labor and Material Bond: For all general bids in excess of $50,000.00, the
Apparent Lowest Qualified Bidder, upon being notified by the Agency of its apparent lowest qualified Bidder status, shall within ten (10) days after notification thereof, submit to the Agency an additional Bond, in the sum of not less than one hundred (100%) percent of the Contract Price. The Bond shall be conditioned that the Contractor will promptly pay for all material furnished and labor supplied, or performed, in the prosecution of the Work; whether or not the materials or labor enters into and becomes a component part of the structure, or structures, to be erected or Work to be performed under this Contract. The Bond shall have as Surety thereto such Surety Company or Companies as are authorized to transact business in this State. The Bond shall be held by Western Connecticut State University (WCSU) for the use of each party who, as subcontractor or otherwise, shall have furnished materials, or supplies, or shall have performed labor in the prosecution of the Work as herein specified and who has not been paid therefore. The Bond shall provide specifically that any person may bring suit thereon in the name of the person suing, prosecute the same to the final judgment and have execution thereon for such sum or sums as may be justly due.
1. The Agency shall not be liable to furnish counsel; nor for the payment of any costs or expenses of any such suit. This Bond is to be furnished pursuant to Section 49-41 of the General Statutes of Connecticut, as revised to 1991.
1.04 AWARD SEQUENCE, SUBMITTALS AND CONTRACT FOR
CONSTRUCTION
A. PRE-AWARD MEETING / PROJECT SCOPE REVIEW –
The apparent lowest qualified bidder will be required to meet with the WCSU project manager (or designee) within no more than 5 calendar days of a request to meet. The meeting will be to review project scope of work, timelines and deliverables. The contractor shall bring to the meeting a summary of costs for the project (or draft Schedule of Values) to demonstrate that all aspects of the project have been addressed and are present. Note that a final, certified Schedule of Values, using AIA forms G702/G703, will be required prior to issuance of a Purchase Order.
B. LETTER of INTENT TO AWARD –
After the meetings and upon approval from the Project Manager, WCSU Purchasing will issue a letter of intent to award, which shall serve as formal notice for the Contractor and WCSU to initiate the contracting phase. The letter shall also notify the Contractor as to submittals expected to be delivered to WCSU as soon as possible and prior to issuance of a Purchase Order, such as -
1. Performance Bond and Labor & Material Bond
2. Certificate of Insurance - The Certificate Holder is “State of
Connecticut and Western Connecticut State University as additionally insured, 181 White Street, Danbury, CT, 06810
3. Certified Schedule of Values on AIA forms G702/G703
4. Signed contracts from all subcontractors
C. CONTRACT FOR CONSTRUCTION –
WCSU shall enter into a Contract for Construction with the awarded contractor. Work cannot begin on this project until the contract is executed by the State of Connecticut Attorney General’s Office. For a sample of a contract for construction (for reference) see Specification Section 00 52 03 Sample Contract.
D. PURCHASE ORDER –
A Purchase Order from WCSU’s Purchasing Office shall be issued once an executed contract is in place in order to encumber funding and pay subsequent invoices.
1.05 CHRO REQUIREMENTS: STATE CONTRACT COMPLIANCE
REQUIREMENTS
A. The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f.
B. State law requires a minimum spending allocation goal of twenty-five
(25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of
CONN. GEN. STAT. § 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the spending allocation goals.
C. See Specification Section 00 73 38 – CHRO Contractor Compliance
Regulations for requirements.
1.07 POST-BID SUBMISSION OF SIGNED SUBCONTRACTS
A. In accordance with Section 4b-96 of the Connecticut General Statutes, the apparent low Bidder shall submit to the Agency within ten (10) days of the Agency's written request for the same, copies of executed contracts with all listed subcontractors (Article 1.07 above) and with all listed set aside contractors (Article 1.08). The subcontracts shall be in the format outlined in Section 4b-96 of the Connecticut General Statutes and shall include the following provision: "contingent upon the execution of a general contract between the Contractor and the Awarding Authority for the complete work". Refer to Appendix G, SUBCONTRACT AGREEMENT FORM.
B. The Agency may not issue a purchase order for the project until the
Contractor has fully complied with this condition, and with other bid and statutory requirements outlined herein.
1.08 CONNECTICUT SALES AND USE TAX EXEMPTION
Certain materials and supplies used by the Contractor and its
Subcontractors in fulfilling the terms of the Contract may be exempt from the Connecticut Sales Tax. All General Bidders and their prospective subcontractors shall familiarize themselves with the current regulations of the Department of Revenue Service. The Connecticut Sales Tax on materials, or supplies, exempted by such regulations, shall not be included in any Bidder's proposal.
1.09 CLAUSE FOR CONTRACTS, SUBCONTRACTS, AND BIDS
A. This Contract is subject to the provisions of Executive Order No. Three of
Governor Thomas J. Meskill, promulgated June 16, 1971, concerning labor employment practices, Executive Order No. Seventeen of Governor Thomas J. Meskill, promulgated February 15, 1973, concerning the listing of employment openings and Executive Order No. Sixteen of Governor John G. Rowland promulgated August 4, 1999, concerning violence in the workplace, all of which are incorporated into and are made a part of this Contract as if they had been fully set forth in it.
B. This Contract may be subject to (1) Executive Order No. 14 of Governor M. Jodi Rell, promulgated April 17, 2006, concerning procurement of cleaning products and services; and (2) Executive Order No. 61 of Governor Dannel P. Malloy promulgated December 13, 2017 concerning the Policy for the Management of State Information Technology Projects, as issued by the Office of Policy and Management, Policy ID IT-SDLC-17-
04. If any of the Executive Orders referenced in this subsection is applicable, it is deemed to be incorporated into and made a part of this Contract as if fully set forth in it.
1.10 PREVAILING WAGES
A. On all new construction projects in the amount of or in excess of
$1,000,000.00 and on all renovation or repair projects in the amount of or in excess of $100,000.00; the wages paid to any mechanic, laborer, or workman employed upon the Work, herein contracted to be done, shall be equal to the rate of wages specified in the Prevailing Wage Rates schedule, specifically published for this Project by the State of Connecticut Labor Department, and included in the Purchasing Department Insert Document Package.
Each Contractor, who is awarded a contract on or after October 1, 2002, shall be subject to provisions of the Connecticut General Statues, Section 31-53, as amended by Public Act 02-69, “An Act Concerning Annual Adjustments to Prevailing Wages”. These provisions should be used in determining bid price. Wage rates will be posted each July 1st on the Department of Labor website: www.ctdol.state.ct.us . Such prevailing wage adjustment will not be considered a matter for an annual contract amendment.
B. On all new construction projects in the amount of or in excess of
$1,000,000.00 and on all renovation or repair projects in the amount of or in excess of $100,000.00; the Contractor shall submit to the Labor Department a properly executed "CONTRACTOR'S WAGE CERTIFICATION FORM", with a copy to the Agency, certifying the Contractor's compliance with the prevailing wage rates for this Project. A copy of said form is enclosed in the Purchasing Department Insert.
1.11 WHISTLE BLOWER PROTECTION
The Auditors of Public Accounts have been authorized to receive information concerning matters involving corruption, unethical practices, violation of State laws or regulations, mismanagement, gross waste of funds, abuse of authority or danger to the public safety occurring in any State department or agency.
The Auditors can be reached by calling (800) 797-1702 or by email at patricia.wilson@ct.gov or in writing:
Auditors of Public Accounts 18 Trinity Street Hartford, CT 06106-1628 Attention: Patricia Wilson, Administrative Auditor
Any awarded Contract as a result of this RFQ may be subject to the provisions of Section 4-61dd of the Connecticut General Statutes. In accordance with this statute, if an officer, employee or appointing authority of the Contractor takes or threatens to take any personnel action against any employee of the Contractor in retaliation for such employee’s disclosure of information to any employee of the contracting state or quasi-public agency or the Auditors of Public Accounts or the Attorney General under the provisions of subsection (a) of such statute, the Contractor shall be liable for a civil penalty of not more than five thousand dollars for each offense, up to a maximum of twenty per cent of the value of this Contract. Each violation shall be a separate and distinct offense and in the case of a continuing violation, each calendar day’s continuance of the violation shall be deemed to be a separate and distinct offense. The State may request that the Attorney General bring a civil action in the Superior Court for the Judicial District of Hartford to seek imposition and recovery of such civil penalty. In accordance with subsection (f) of such statute, each large state Contractor, as defined in the statute, shall post a notice of the provisions of the statute relating to large state Contractors in a conspicuous place which is readily available for viewing by the employees of the Contractor.
1.12 NONDISCRIMINATION STATEMENT
Connecticut State University is an equal opportunity employer. The University will not knowingly do business with any bidder, contractor, subcontractor or supplier of materials found to be in violation of any state or federal anti-discrimination law.
THIS PAGE INTENTIALLY LEFT BLANK
SECTION 00 41 00
BID FORM
WESTERN CONNECTICUT STATE UNIVERSITY
BIDDER:_____________________________________________________________
Address Telephone No.
BID PROPOSAL FOR:
THE O’NEILL ATHLETIC CENTER BOILER ROOM BRIDGE
STRUCTURAL REPAIRS PROJECT – WESTSIDE CAMPUS
WCSU BID NO. 2026-PAD-0001
ADDRESSED TO:
Mr. Timothy Keith Contract Compliance & Procurement Specialist Western Connecticut State University, 182 White Street, Danbury, CT 06810
In preparing this Bid, we have carefully examined the Bidding Documents for this Work.
We have visited the site and noted the conditions affecting the Work.
The Bidding Documents referred to include Drawings and Specifications prepared by Western Connecticut State University and entitled:
We acknowledge receiving the following Addenda issued by the Architect:
No. 1 dated ______ No. 2 dated ______ No. 3 dated ______ No. 4 dated ______
BASE BID:
We propose to perform the Work described in the Bidding Documents, in keeping with the definitions of Article 1 of the Instructions to Bidders, for the Base Bid Sum of:
Dollars
SECTION 00 41 00
TIME OF COMPLETION:
We agree that all work will be completed no later than February 10, 2027. (See additional clarification information in the Invitation to Bid).
BID ACCEPTANCE:
We agree that this proposal shall not be withdrawn for a period of ninety calendar days after date of submittal. We understand that Owner reserves the right to accept any Bid, reject any or all Bids, and to waive any informality in the Bidding. At the time of execution of the contract, we shall furnish all required documentation as listed on the Bid Submission Checklist Form.
1. Performance Bond and Labor & Material Payment Bond each in the full amount of the Contract.
2. Certificate of Insurance.
3. EEO forms as required.
4. Contractor’s proposed construction schedule in format acceptable to University.
Firm Name: _____________________________________________________________
Address: _____________________________________________________________
By: ____________________________________ Title: ______________________ (Name Typed) Signature: ______________________________ Date: ______________________
The Bidder is a/an (individual) (partnership) (corporation). Names and titles of other officers or partners are:
(For corporation, give State of incorporation and affix corporate seal.)
Section 00 41 10 Bid Package Submittal Requirements
WESTERN CONNECTICUT STATE UNIVERSITY
BID SUBMISSION CHECKLIST FORM
Project: The O’Neill Athletic Center Boiler Room Bridge Structural Repairs Project - Westside Campus Bid No.: 2026-PAD-0001
Listed below are the following forms/documentation that must be completed and submitted in the bid package before the official bid opening. Failure to comply may result in the disqualification of the bid submission.
Please organize your submission in the order of this list!
WCSU Bid Form Bid Bond Evidence of Insurance DAS – Contractor Prequalification Certificate DAS – Contractor Prequalification Update (Bid) Statement CHRO Contractor Compliance Regulations – Good Faith Efforts Plan State Campaign Contribution Certification – OPM Form 1 State Elections Enforcement Commission – SEEC Form 10 Bidders Qualification Statement CT Dept. of Labor Contractors Wage Certification Form CT Dept. of Labor Contracting Agency Certification Form
Below are the following forms/documentation that are to be submitted at time of Contract Execution:
Performance Bond Labor and Materials Payment Bond Contractor’s proposed construction schedule in format acceptable to the University
END
Section 00 41 10 Bid Package Submittal Requirements
SECTION 00 43 16
STANDARD BID BOND
CT DAS 5000 (Rev. 02.01.18) STANDARD FORM FOR ALL PROJECTS
INSTRUCTIONS FOR CERTIFIED CHECK OR BID BOND (select one):
All Bidders:
Edit this page, print, sign, and scan to PDF. Upload the PDF form to BizNet.
CERTIFIED CHECK OPTION: Prior to the Date and Time of the Bid Opening:
(1) Check the box for “Certified Check Option”;
(2) Print, scan to PDF, and upload the PDF form to Biznet; and
(3) Deliver the Certified Check, made payable to "Treasurer, State of Connecticut”, to the following address:
State of Connecticut Department of Administrative Services, Construction Services Office of Legal Affairs, Policy, and Procurement 450 Columbus Boulevard, North Tower, Suite 1302 Hartford, CT 06103-1835
BID BOND OPTION (see template below): Prior to the Date and Time of the Bid Opening:
(1) Check the box for “Bid Bond Option”;
(2) Complete the Standard Bid Bond (below), print, sign, scan to PDF, and upload the PDF Bid Bond to Biznet.
Standard Bid Bond DAS Construction Services Office of Legal Affairs, Policy, and Procurement
KNOW ALL MEN BY THESE PRESENTS, That we, , hereinafter called the Principal, of , as Principal, and ,hereinafter called the Surety, a corporation organized and existing under the laws of the
State of , and duly authorized to transact a surety business in the State of Connecticut, as Surety, are held and firmly bound unto the State of
Connecticut, as Obligee, in the penal sum of ten (10) percent of the amount of the bid set forth in a proposal hereinafter mentioned, lawful money of the United States of America, for the payment of which, well and truly to be made to the Obligee, the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, That, whereas the Principal has submitted or is about to submit a proposal to the Obligee related to a contract for Project No.:
NOW, THEREFORE, if the said contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the said contract in writing with the State of Connecticut and give the required bonds, with surety acceptable to the Obligee, or if the Principal shall fail to do so, pay to the Obligee the damages which the Obligee may suffer by reason of such failure not exceeding the penalty of this bond, then this obligation shall be void, otherwise to remain in full force and effect.
SIGNED, SEALED AND DELIVERED this day of , 20
(Principal's Signature) Surety by (Print Name) Its attorney in fact Signature
Company Name (Print Name)
WCSU BID NO.: 2026-PAD-0001 STATE PROJECT NO. BI-RD-325
WCSU BID NO.: 2026-PAD-0001 STATE PROJECT NO. BI-RD-325
SECTION 00 45 14
GENERAL CONTRACTOR BIDDER’S QUALIFICATION STATEMENT
GENERAL CONTRACTOR
BIDDERS QUALIFICATION STATEMENT
PROJECT
NAME/NO.:
Western Connecticut State University The O’Neill Athletic Center Boiler Room Bridge Structural Repairs Project
– Westside Campus Project No.: WCSU-2023-19 / WCSU Bid No.: 2026-PAD-0001
All bidders are required to file this form, properly completed, WITH THEIR PROPOSAL. Failure of a bidder to answer any question or provide required information may be grounds for the awarding authority to disqualify and reject their bid. if a question or request for information does not pertain to your organization in any way, use the symbol “NA” (Not Applicable). Use additional 8 ½” x 11” sheets with your letterhead as necessary.
1. Indicate exactly the name by which this organization is known:
Name:
2. How many years has this organization been in business under its present business name?
Years:
3. How many years has this organization been in business as a General Contractor?
Years:
4. If this organization has not always been a General Contractor, list the trade(s) that your firm customarily performed prior to the time that you became a General Contractor:
4.1
4.2
4.3
5. Indicate all other names by which this organization has been known and the length of time known by each name:
5.1
5.2
5.3
6. This firm is a:
Corporation Partnership Sole Proprietorship Joint Venture Other
7. Attach resumes of all supervisory personnel, such as Principals, Project Managers, and
Superintendents, who will be directly involved with project on which you are now a bidder. Indicate the number of years of construction experience and number of years of which they were in a Supervisory capacity.
8. List all sub-trades which your firm customarily performs with own employees.
8.1
8.2
8.3
8.4
8.5
9. Trade References: Names, addresses and telephone numbers of several firms with whom your organization has regular business dealings, (attach separate sheets as necessary):
10. All Construction Projects your organization has in process (attach separate sheets using the following format as necessary):
10.1 Specific Title & Location:
10.2 Contract Amount:
10.3 Description of your scope
of work performed.
10.4 Owner:
10.5 Designer:
10.6 Start Date:
10.7 Finish Date:
*10.8 Any Complaint on Quality or Management
10.9 Owners Representative:
(Name) Telephone Number
*Please Attach A Separate Sheet Explaining Any Negative Entry In This Row.
11 All Construction Projects your organization has completed in the past five years or the twenty projects most recently completed (attach separate sheets using the following format as necessary):
11.1 Specific Title & Location:
11.2 Contract Amount:
11.3 Description of your scope
of work performed.
11.4 Owner:
11.5 Designer:
11.6 Start Date:
11.7 Finish Date:
*11.8 Any Complaint on Quality or Management
11.9 Owners Representative:
(Name) Telephone Number
*Please Attach A Separate Sheet Explaining Any Negative Entry In This Row.
12. Has your organization ever failed to complete a contract, or has any officer or partner of your organization ever been an officer or partner of another organization that failed to complete a contract?
If so, indicate the circumstances leading to the project failure and the name of the company which provided the bonding for the failed contract(s):
13. List all legal or administrative proceedings currently pending or concluded adversely within the last five years which relate to procurement or performance of any public or private construction contracts.
(Exclude OSHA violations which are called for elsewhere in this statement).
13.1 Attached:
13.2 N/A:
14. List all willful or serious violations of any Occupational Safety and Health Act (OSHA) or of any standard, order or regulation promulgated pursuant to such act, during the three year period preceding the bid, provided such violations were cited in accordance with the provisions of any State Occupational Safety and Health Act or Occupational Safety and Health Act of 1970. Indicate whether these were abated within the time fixed by the citation or whether the citation was appealed.
If appealed what is the status or disposition.
14.1
14.2
15. Has your organization had any criminal convictions related to the injury or death of any employee in the three year period preceding the bid. Please list any such convictions below.
15.1
15.2
15.3
Dated at
Signed this day of 20
Name of Organization:
Signature
(Print Name)
Title
Notary Statement:
Mr./Mrs./Ms. being duly sworn deposes and says that he/she is the of (Position or Title)
, and that the answers to the foregoing
(Firm Name) questions and all statements therein contained are true and correct.
Subscribed and sworn before me this day of 20
Notary Public
My Commission Expires 20
Rev. 09-2025
DRAFT-FOR REVIEW WCSU-2027-PAD-0001
CONTRACT FOR CONSTRUCTION RENOVATION
between
WESTERN CONNECTICUT STATE UNIVERSITY
and
CONTRACTOR NAME
This Contract for construction renovation services is entered into by and between Western Connecticut State University (hereinafter “University”, “Owner”, “Agency” or “State”) located at 181 White Street, Danbury, CT 06810 (“campus”) and Contractor’s Name, with a principal place of business at XXX Business Address, Town, CT 06XXX (“Contractor”). This Contract is pursuant to an award made to the Contractor 2026-PAD-000X for the provision of Building and Name of Project – Midtown or Westside Campus.
1. ENTIRE AGREEMENT. This written contract shall constitute the entire agreement between the parties and no other terms and conditions in any document, acceptance or acknowledgment shall be effective or binding unless expressly agreed to in writing by the University. This Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. Therefore the work to be performed pursuant to this Contract will be in accordance with the drawing set entitled Building and Name of Project – Midtown or Westside Campus, WCSU Project #202X-0X, Bid No. 2026-PAD-000X provided by the University’s Planning and Engineering Office, dated July X, 2026 (incorporated herein by reference and attached hereto as Attachment H). Contractor is responsible to ensure all contractor and subcontractor services are supplied in accordance with the Contract Documents.
1.1 In accordance with Articles #11 and #12 of this Contract, modifications to the Contract
Documents (i.e. - Drawing changes) not resulting in an increase in cost beyond the maximum contract value or an increase in the contract term can be negotiated between the parties and agreed to in writing. All other modifications shall require a formal amendment to the Contract executed by both parties and approved by the Office of the Attorney General.
2. DEFINITIONS. Whenever the following terms, or pronouns in place of them, are used the intent and meaning shall be as follows:
2.1 ADDITIONAL OR DELETED WORK: Work required by the University that involves any addition to, deduction from, or modification of the Work required by the Contract Documents.
2.2 AGENCY: The Agency of the State of Connecticut having administrative authority of the facility in which the Work is being performed. The Agency is Western Connecticut State University.
2.2.1 Agency Representative: Timothy Keith
Contract Compliance & Procurement Specialist Western Connecticut State University
2.2.2 Project Coordinator: Daniel L. Casinelli, AIA, LEED AP
Director of Planning Architecture and Design Western Connecticut State University
2.3 APPLICATION FOR PAYMENT, PARTIAL PAYMENT OR REQUISITION: Contractor’s request for payment for completed portions of the Work and, if the Contract so provides, for materials or equipment suitably stored pending their incorporation into the Work.
2.4 APPROVED: The term "approved" will be held to the limits of the Project Coordinator’s authority as specified in the Contract Documents. In no case shall the Project Coordinator’s approval relieve the Contractor of its responsibility to provide a Project constructed in accordance with the Contract Documents. The Project Coordinator’s approval shall be for general conformance to the Contract Documents and shall not relieve the General Contractor from its responsibility to accurately determine quantities and to correlate and verify dimensions.
2.5 BUILDER’S RISK INSURANCE: A specialized form of property insurance which provides coverage for loss or damage to the Work pursuant to the Contract Documents.
2.6 CALENDAR DAY: This is each day of the calendar.
2.7 CASH ALLOWANCE: An amount established in the Contract Documents for inclusion in the
Contract Sum to cover the cost of prescribed items not specified in detail.
2.8 CERTIFICATE OF COMPLETION: A document issued by the Contractor to the Project
Coordinator stating that the Contractor has met all contractual obligations.
2.9 CERTIFICATE OF COMPLETION and ACCEPTANCE: A document issued by the Project
Coordinator to the Contractor stating that all Work has been completed and that the Work is accepted by the University.
2.10 CERTIFICATE OF COMPLIANCE: A document issued to the University by a design professional stating that for the portion of the project completed, either the design portion or the construction portion, has been performed in substantial compliance with all applicable building codes.
2.11 CERTIFICATE OF OCCUPANCY: Document issued by the authority having jurisdiction certifying that all or a designated portion of a building is approved for its designated use.
2.12 CERTIFICATE OF SUBSTANTIAL COMPLETION: A document prepared by the Contractor and approved by the Project Coordinator on the basis of an inspection stating:
2.12.1 that the Work, or a designated portion thereof, is determined to be Substantially Complete;
2.12.2 the date of Substantial Completion;
2.12.3 the responsibilities of the University and the Contractor regarding security, maintenance, heat, utilities, damage to the Work and insurance; and
2.12.4 the time within which the Contractor shall complete the remaining work.
2.13 CHANGE ORDER: Written authorization signed by an authorized University employee, authorizing a modification in the Work, an adjustment in the Contract Sum, or an adjustment in the Contract Time.
2.14 CONSTRUCTION CHANGE DIRECTIVE: A written authorization signed by an authorized
University employee, directing a modification in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum.
2.15 CONTRACT DOCUMENTS OR CONTRACT: The Agreement between the University and
Contractor, Conditions of the Contract (General Conditions, Supplementary Conditions, General Requirements and other Conditions), Project Manual, Drawings,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .