Water Main Replacement Phase III.pdf

PDF 153 KB Posted

Attached to
Water Main Replacement Phase III
Solicitation number
PW-NIB-702-WTR
Issued by
Los Angeles County, California

About this file

This is a Scope of Work document for the City of South Gate, California, detailing the Water Main Replacement Phase III project. The project encompasses the replacement of existing water mains throughout the city, including the installation of valves, fittings, service laterals, fire hydrants, and connections to existing mains with all related appurtenances. The contractor is responsible for providing all labor, materials, and equipment necessary to construct, test, and place new water mains into service, as well as abandon existing potable water service lines in accordance with the project plans and specifications.

The document establishes the technical and contractual framework for bidders to understand project scope, performance requirements, and deliverables. Bidders must demonstrate capability to execute water infrastructure work including main installation, testing protocols, service connections, and proper abandonment of legacy systems. The project requires compliance with all applicable standards and specifications as detailed in the accompanying plans, and contractors must be prepared to execute all phases of work from material procurement through final system commissioning and handover to the City.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of South Gate

Opportunity Detail

Bid Bond

Pre-Bid Meeting Information

WATER MAIN REPLACEMENT PHASE III, 702-WTR PW-NIB-702-WTR

Title WATER MAIN REPLACEMENT PHASE III, 702-WTR Invitation # PW-NIB-702-WTR

Posting Date 06/17/2026 10:18 AM (PDT) Project Stage Bidding Bid Due Date 07/20/2026 2:00 PM (PDT)

Response Format Paper

Type Bid Response Types Line Items

Type of Award Lump Sum Categories 221310 - Water Supply and Irrigation Systems

237110 - Water and Sewer Line and Related Structures Construction 237990 - Other Heavy and Civil Engineering Construction 332996 - Fabricated Pipe and Pipe Fitting Manufacturing

License Requirements See bid documents

Department Public Works Address 8650 California Avenue

South Gate, California 90280

County Los Angeles

Bid Valid Liquidated Damages See bid documents Estimated Bid Value Start/Delivery Date

Project Duration

Bid Bond 10.00% Payment Bond 100.00%

Performance Bond 100.00%

Pre-Bid Meeting Yes Meeting Type Onsite

Date & Time 06/30/2026 10:00 AM (PDT) Address City of South Gate Corporate Yard, 4244 Santa Ana St, South Gate, CA 90280

Attendance Required No

6/17/26, 4:25 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/60317/bo/bo-detail/143210#bidInformation 1/2

Online Q&A

Contact Information

Description

Search & Bid on Thousands of Contracts

Online Q&A Yes Q&A Deadline 07/02/2026 4:00 PM (PDT)

Contact Info Lorenzo Camargo 323-563-9594 lcamargo@sogate.org

Bids to Owner's Agent

Scope of Services This project consists of replacing existing water mains throughout the City of South Gate. The project also includes the installation of valves, fittings, service laterals, fire hydrants, connections to existing mains, and all related appurtenances. The Contractor shall provide all labor, materials, and equipment necessary to construct, test, and place the new water mains into service, as well as abandon the existing potable water service lines, in accordance with the plans and specifications.

Other Details Notes

Special Notices Local Programs & Policies www.vendorline.com

6/17/26, 4:25 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/60317/bo/bo-detail/143210#bidInformation 2/2 https://vendor.planetbids.com/

File details come from the government source that posted it. Updated .