This Request for Qualifications (RFQ) is issued by Wake Technical Community College (NCCCS# 2795) for Construction Materials Testing (CMT) and Special Inspections (SI) services related to the Conlon Western Wake Phase 1 project in Apex, North Carolina. The project encompasses site development, infrastructure installation, and construction of one new 125,000-square-foot building named Fujifilm Hall. Statements of Qualifications must be submitted by Wednesday, July 29th, 2026 at 2:00 p.m. to James M. Skinner, Project Manager, at Wake Technical Community College, 4723 Advantage Way, Building T, Suite 201, Raleigh, NC 27603. Hard copy submissions only are accepted; fax and email submissions will not be considered. The RFQ does not include a pre-RFQ meeting or public opening of submissions. Inquiries must be submitted by 4:30 p.m. on July 10th, 2026, directed to James M. Skinner via email at jmskinner@waketech.edu. The consultant selection period is estimated at one to two months, with a contract duration of eighteen to twenty-four months following selection.
Responding firms must be licensed to practice engineering in North Carolina and maintain Professional Liability Insurance coverage with limits to be determined prior to contract award. The total construction budget for the project is $114,000,000, and the project delivery system utilizes a Construction Manager at Risk (CMR) process. The design team is led by HKS, and the construction team is SKANSKA. Firms must demonstrate capacity to provide CMT and SI services through a team including a Construction Materials Testing Engineer, Special Inspections Engineer, and dedicated Inspector(s)/Technician(s), assembled from either internal staff or sub-consultants. Firms must submit Statements of Qualifications limited to a maximum of ten pages (8" x 11" format), with five hard copies and one electronic copy on USB drive. Evaluation criteria include corporate profile suitability, proposed team capacity and experience, past performance on similar projects within the last five years, quality management systems, and project delivery methodologies. Wake Technical Community College actively encourages participation by minority-owned and women-owned business enterprises (MWBE firms). Fee information is not requested and will not be considered in the evaluation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wake Tech eVP RFQ Ad for CMT_SI - Conlon 130-WTCC9225C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS (RFQ)
For Construction Materials Testing, and Special Inspections
Conlon Western Wake- Phase 1
NCCCS# 2795
RFQ Closing Time: Wednesday- July 29th, 2026 at 2:00 p.m.
Part 1 – Submittal Requirements
Section No.
Section Name
Section I Requests for Qualifications Section II Statement of Qualifications
Content Requirements
Section III Available Project Information
Section IV Sample SoQ Evaluation Form
1. INTENT
The intent of this Request for Qualifications (RFQ) is to solicit Statements of Qualifications (SoQ), in accordance with the requirements described in this RFQ, for the following:
The RFQ is for Construction Materials Testing (CMT) and Special Inspections (SI) services for a new site development with associated infrastructure installation, and the construction of one (1) new building (to be named Fujifilm Hall) at approximately 125,000 square feet located in Apex, NC.
A.
CMT-SI services from firms acting as the lead firm and their assembled sub-consultant teams. Wake Technical Community College encourages participation by MWBE firms and supports efforts to ensure and promote opportunities for minority businesses.
B.
A Qualification and Performance analysis process will be employed for this selection. The successful Firm(s) will be those who show successful experience in the scope and types of work proposed.
2. DEFINITIONS
A. “The Owner” means officers or employees of Wake Technical Community College, Raleigh, NC.
B. "Firm" means the person or organization responding to this RFQ.
C. "Statement of Qualifications (SoQ)" means the submission received from a Firm in response to this RFQ.
D. "Request for Qualifications" or "RFQ" means this entire document, including all of the documents and any addenda thereto issued before the RFQ closing time.
3. STATEMENT OF QUALIFICATIONS SUBMISSION
A. SoQ’s will be received up to 2:00 p.m. on Wednesday, July 29th, 2026, (the RFQ closing time) by:
James M. Skinner Project Manager Wake Technical Community College 4723 Advantage Way Building T, Suite 201
Raleigh, NC 27603 B. SoQ’s submitted via fax or e-mail are not acceptable and will not be considered.
C. Firms will be evaluated on experience and qualifications. Fee related information is not requested and will not be used in the evaluation process.
D. Clearly indicate on the envelope the name of the Firm, the name of Project which the RFQ is submitting a SoQ for, as well as the firm’s selected contact person with associated email address.
E. Refer to Section II - SoQ Content Requirements, for details.
F. There will not be a "public opening" of the SoQ’s with Firms present.
4. COST OF SUBMISSION AND OWNERSHIP OF SoQ’s A. Wake Technical Community College is not responsible for any costs incurred by Firms in preparing, submitting, or presenting their SoQ’s.
B. All SoQ’s become the property of Wake Technical Community College upon submission and will not be returned.
5. THE SERVICES AND THE SCHEDULE
A. The Scope of Work to be provided under the contract is specified in Section III, 1. of the RFQ.
B. Schedule objectives for the project are currently estimated as follows:
1. Consultant Selection- 1-2 months
2. Contract Duration- 18-24 months
6. Minimum qualification requirements A.
Firms must be licensed to practice engineering in the State of North Carolina in accordance with the laws of the State of North Carolina.
B. Firms must have Professional Liability Insurance coverage. Limits shall be determined prior to award of the design contract(s).
7. EVALUATION Process A. The evaluation team will be comprised of representatives of Wake Technical Community College and others, as deemed appropriate by the college.
B. Firms are deemed to understand and agree that the SoQ’s submitted by them will be used by the evaluation team in determining, according to the evaluation team's sole and best judgment and discretion, the Firms who are best qualified to provide the required services.
8.
PRE‑RFQ meeting
N/A
9. Inquiries
A.
Inquires for this RFQ are to be submitted on or before 4:30 PM on July 10th, 2026, and directed to the following person via email:
James M. Skinner Project Manager- Design & Construction Wake Technical Community College jmskinner@waketech.edu
END OF SECTION
1.
INTENT
A.
This Section specifies in detail, the form and minimum content requirements for information required to be submitted in each SoQ.
B.
Firms may at their discretion include additional information which they consider relevant to ensure a full and proper evaluation, provided that the specified maximum allowable number of pages is not exceeded.
2.
FORMAT REQUIREMENTS
A. Limit SoQ submission to a maximum of 10 pages, sized 8½" x 11" or equivalent (e.g. 11" x 17" fold out sheets for charts, schedules, etc. count as a single page, any other use of 11” x 17” sheets counts as two pages). A page shall be considered to have printing only on one side. A sheet printed on both sides shall be considered as two pages. This page limit excludes a transmittal letter, title page, and table of contents. The page limit includes resumes of key personnel and any unsolicited supplementary information such as corporate brochures, etc.
B. Organize the SoQ submission to clearly and succinctly present the required information. Use the main headings and present the information in the order provided in Section III - SoQ Evaluation Form.
C. Provide five (5) complete hard copies of the SoQ and one (1) electronic copy on USB drive.
3.
CORPORATE PROFILE
A.
Provide general information about the Firm, which need not be specific to this RFQ. Include history of the firm, years in business, office locations, number and experience of staff, types of services provided and specialist areas of expertise. State the size of the Firm, including all offices, and size and skills/expertise of specific offices where the services will be provided.
4.
PROPOSED PRIME CONSULTANT AND SUBCONSULTANT TEAM
A.
Firms must demonstrate in their SoQ that they, together with their sub-consultants, have the capacity available to commit to managing and performing all the consulting services and producing all of the deliverables required for this particular project, within the required project schedule. Capacity includes sufficient qualified staff resources, technology and equipment.
B.
Firms must assemble, and identify in their SoQ, a consulting team that includes, at a minimum, the following specialist disciplines:
1. Construction Materials Testing Engineer
2. Special Inspections Engineer
3. Dedicated Inspector(s)/Technician(s) C.
Firms must indicate whether each of the above disciplines will be resourced through the Firm's own staff or through sub-consultants.
D.
Provide, for the Firm's (prime consultant) and for each proposed sub-consultant firm:
1. Name of firm, head office address, telephone number – if joint venture, whether special or ongoing relationship.
2. If different from the above, the firm's branch, regional or other office address, telephone number, at the location from which most of the services will be performed.
3. Name, position, office address, telephone number, and e-mail address of firm's primary contact person for purposes of this RFQ.
4. Name(s) of firm's principal(s) and their professional credentials.
5. Names of key personnel proposed to be committed to the project. Identify their discipline, their role (e.g. team leader, lead designer, technical expert, etc.), their professional credentials and experience (in the form of maximum one page resumes) and their proposed extent of participation in the project.
6. Other relevant information, at the Firm's discretion, within the specified maximum page limitation requirement for the Proposal.
E.
Describe how the prime consultant and sub-consultant team will be organized, by indicating formal reporting lines and informal lines of communication in a proposed organization chart.
5.
EXPERIENCE AND PAST PERFORMANCE
A.
Firms should provide summaries of four to six projects completed within the last five years, for which the Firm has provided CMT-SI consultant services. These referenced projects must include:
1. At least two projects similar in nature and scope of services to the project for which Proposals are being sought and,
2. At least two projects that have been performed by the prime consultant and sub-consultant team, including key personnel, substantially the same as the one proposed for this project.
B.
The referenced projects may be past projects for Wake Technical Community College or for other clients.
C.
The summary for each referenced project should include:
1. Name, location and brief description of the project.
2. Name of client (owner) and name, telephone number and e-mail address of client representative.
3. Identification of prime consultant and sub-consultant team, including names of key personnel.
4. Name of construction contractor and name, telephone number and e-mail address of contractor representative.
5. Client satisfaction feedback or recommendations.
6. Other pertinent information that demonstrates the Firm's experience and past performance record, e.g. unique project challenges or problems, innovative design solutions, project successes, client recommendations, etc.
6. PROJECT DELIVERABLES AND CLOSE OUT
A. Describe the management systems, strategies and skills that will be employed to ensure that:
1. Wake Technical Community College’s expectations around project scope, time, cost, quality, performance and aesthetics will be met.
2. The highest quality of professional services and deliverables will be provided to Wake Technical Community College within the required timelines.
B. Provide any other relevant information about the Firm's work methodologies.
C. Provide overview of how the various aspects CMT and SI will be managed, documented, follow-up on and closed out.
END OF SECTION
1.
PROJECT DESCRIPTION
Wake Tech's existing Western Wake Campus, located in a leased facility in Cary, will be relocated to a highly accessible 34-acre site located in the Veridea development near N.C. Highway 55, the N.C. Highway 540 Triangle Expressway and U.S. Highway 1, the Conlon Western Wake Campus will be adjacent to the future 230-acre North Carolina Children's Hospital, the state's first freestanding hospital dedicated to serving the needs of children, and Dell Technologies. It will also be located within 4 miles of new and expanding biopharmaceutical facilities in Holly Springs: Amgen, CSL Seqirus, Fujifilm Biotechnologies and Genentech.
In addition to biotech and future health sciences training, the campus will offer business and IT programs, along with the Associate in Arts and Associate in Science degrees for university transfer.
The master plan for development, shows three academic buildings on the 34-acre site.
Included in Phase 1 will be site development, infrastructure installation, and the construction of one (1) new building (to be named Fujifilm Hall) at approximately 125,000 square feet.
The 125,000-square-foot building will house campus operations such as Admissions, Financial Aid and a library. It will also feature space for specialized biotechnology and advanced manufacturing training to meet the growing needs of nearby biopharma and life sciences companies in Holly Springs and other parts of Wake County. The building will also be the hub for Entrepreneurship & Small Business Center resources.
2.
PROJECT BUDGET
A.
The total construction estimate for this project is $114,000,000 3.
PROJECT SCHEDULE
A.
See Section I, 5-B for project schedule objectives.
4.
PROJECT DELIVERY SYSTEM
A. The project delivery system is by Construction Manager at Risk (CMR) process.
5.
PROJECT TEAM
A. Project Design Team: HKS
B.
Project Construction Team: SKANSKA 6.
PROJECT MANAGEMENT FRAMEWORK
A.
A Project Manager, employed by Wake Technical Community College, has authority and responsibility for the overall management and delivery of the project. No other Wake Tech representatives are authorized to make decisions or commit Wake Tech on the project unless specifically approved by the Wake Tech Project Manager or their supervisor chain.
B.
The successful Firm will be expected to appoint a project leader who will interface with the Wake Technical Community College's Project Manager. The Successful firm’s representative will also participate in the review of drawings. This interface will be the formal and principal point of contact and communication between the successful Firm and Wake Technical Community College.
END OF SECTION
NAME OF RFQ/PROJECT: Conlon Western Wake- Phase 1
NAME OF FIRM:
Evaluation Criteria Item Description
1) Corporate Profile (suitability of corporate profile for project needs)
2) Proposed Prime Consultant and Sub-consultant Team
a) Overall capacity and sufficiency of qualified staff resources
b) Experience, and track record of consultant's team leadership
c) Experience and track record of key personnel:
1. Construction Materials Testing Engineer (CMT)
2. Special Inspections Engineer (SI)
3. Project Inspectors/Technicians
3) Experience and Past Performance Record:
a) Similarity of four to six referenced projects to SoQ project within the last 5 years
b) Previous Client satisfaction and other project participant(s) satisfaction
d) Services and deliverables quality management systems
4) Project Deliverables and Close Out:
a) Management Strategies, strategies & skills to ensure project meets WTCCs expectations
b) Work Methodologies/ Project Deliverables organization and quality
c) Close-out and Completion Management