Wage Determination MI20220100.pdf

PDF 69 KB Posted

Attached to
Install 800MHZ Repeater for Security 515-21-202 Federal contract opportunity
Solicitation number
36C25022B0043
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a wage determination and related federal contract opportunity. The wage determination sets the prevailing wage rates for various construction worker classifications in Washtenaw County, Michigan for building construction projects. Covered classifications include asbestos workers, boilermakers, bricklayers, carpenters, electricians, engineers, ironworkers, laborers, painters, plumbers and others. The wage determination also provides effective dates and instructions for appealing determinations.

The related federal contract opportunity is a solicitation to install 800MHz repeaters campus-wide at the VA Medical Center in Battle Creek, Michigan to increase 800MHz radio service. The contractor will have 540 days to complete the work. The solicitation number is 36C25022B0043 and is for project 515-21-202.

View the file

Other files for this federal contract opportunity

Other files attached to Install 800MHZ Repeater for Security 515-21-202, newest first.
File Type Posted
36C25022B0043 Amendment 0004.pdf PDF
36C25022B0043 Amendment 0003.pdf PDF
02-EP.101 - BUILDING 02 - FIRST FLOOR POWER PLAN.pdf PDF
02-EP.100 - BUILDING 02 - BASEMENT POWER PLAN.pdf PDF
36C25022B0043 Amendment 0002.pdf PDF
36C25022B0043 Amendment 0001.pdf PDF
36C25022B0043.pdf PDF
Project 515-21-202 Drawings.pdf PDF
RFI Form Solicitation.doc DOC document
Project 515-21-202 Specifications.pdf PDF
Project 515-21-202 SOW.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: MI20220100 02/25/2022

Superseded General Decision Number: MI20210100

State: Michigan

Construction Type: Building

County: Washtenaw County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 02/25/2022

ASBE0025-003 06/01/2021

Townships of Ann Arbor, Augusta, Lodi, Northfield, Pittsfield, Salem, Saline, Scio, Superior, Webster, Ypsilanti & York

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.41 32.91

ASBE0047-001 07/01/2021

Townships of Bridgewater, Dexter, Freedom, Lims, Lyndon, Manchester, Sharon & Sylvan

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 33.77 18.18

BOIL0169-001 01/01/2021

Rates Fringes

BOILERMAKER......................$ 35.95 34.52

BRMI0009-010 08/01/2020

Rates Fringes

BRICKLAYER.......................$ 36.26 24.56

TILE FINISHER....................$ 28.58 21.34

TILE SETTER......................$ 35.71 21.34

CARP0687-001 06/01/2021

Rates Fringes

CARPENTER, Includes Drywall Hanging, Form Work, and Metal Stud Installation................$ 35.16 29.22

CARP1045-001 06/01/2020

Rates Fringes

CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 30.60 24.58

CARP1102-002 06/01/2020

Rates Fringes

MILLWRIGHT.......................$ 35.30 34.10

ELEC0252-010 06/01/2021

Rates Fringes

ELECTRICIAN......................$ 47.46 27%+12.25

ENGI0324-017 06/01/2021

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 44.69 24.95

GROUP 2....................$ 43.19 24.95

GROUP 3....................$ 41.69 24.95

GROUP 4....................$ 41.39 24.95

GROUP 5....................$ 40.57 24.95

GROUP 6....................$ 39.71 24.95

GROUP 7....................$ 38.74 24.95

GROUP 8....................$ 37.03 24.95

GROUP 9....................$ 28.69 24.95

FOOTNOTES:

Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.

Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane with boom and jib or leads 400' or longer

GROUP 2: Crane with boom and jib or leads 300' or longer

GROUP 3: Crane with boom and jib or leads 220' or longer

GROUP 4: Crane with boom and jib or leads 140' or longer

GROUP 5: Crane with boom and jib or leads 120' or longer

GROUP 6: Regular crane operator, and concrete pump with boom operator

GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher

GROUP 8: Forklift & extend-a-boom forklift

GROUP 9: Oiler

IRON0025-019 06/01/2019

Rates Fringes

IRONWORKER

REINFORCING.................$ 30.98 27.99

STRUCTURAL..................$ 36.77 29.03

LABO0334-005 06/01/2021

Rates Fringes

LABORER: Landscape & Irrigation

GROUP 1.....................$ 21.35 7.40

GROUP 2.....................$ 19.35 7.40

CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)

GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO0499-005 08/01/2021

Rates Fringes

LABORER

Common or General; Grade Checker; Sandblaster........$ 30.21 14.45 Mason Tender - Brick;

Mason Tender - Cement/Concrete.............$ 30.42 14.45 Pipelayer...................$ 30.56 14.45

PAIN0022-003 06/01/2015

Rates Fringes

PAINTER: Brush and Roller.......$ 26.06 17.66 PAINTER: Drywall Finishing/Taping.................$ 27.05 18.26 PAINTER: Spray..................$ 26.86 17.66

PAIN0357-002 06/01/2020

Rates Fringes

GLAZIER..........................$ 34.10 21.46

PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;

provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.

PLAS0514-006 06/01/2018

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 31.47 13.81

PLUM0190-004 06/01/2021

Rates Fringes

PIPEFITTER (Including HVAC Pipe Installation; Excluding HVAC System Installation)........$ 44.31 0.00 PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 44.31 23.70

ROOF0070-001 05/08/2021

Rates Fringes

ROOFER...........................$ 36.17 18.85

SFMI0704-001 08/01/2021

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 46.13 30.99

SHEE0080-001 06/01/2020

Rates Fringes

SHEET METAL WORKER, Includes HVAC Duct and Unit Installation.....................$ 44.13 26.27

TEAM0247-001 06/01/2018

Rates Fringes

TRUCK DRIVER

GROUP 1

Flatbed; Pickup; Dump & Tandem.....................$ 26.71 0.70+a

GROUP 2

Semi.......................$ 26.86 0.70+a

GROUP 3

Lowboy.....................$ 26.96 0.70+a

PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.

FOOTNOTE:

a. $456.70 per week, plus $67.10 per day.

* SUMI2011-025 02/01/2011

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 18.48 7.93

TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 ** 1.18

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"

File details come from the government source that posted it. Updated .