Project 515-21-202 Drawings.pdf
PDF 13 MB Posted
- Attached to
- Install 800MHZ Repeater for Security 515-21-202 Federal contract opportunity
- Solicitation number
- 36C25022B0043
About this file
This document outlines a federal contract opportunity for installation services. The solicitation seeks a contractor to furnish all labor, material, equipment, supervision, documentation and related information to install 800MHZ repeaters campus wide at the VA Medical Center in Battle Creek, Michigan. This is intended to increase the 800MHZ service for the Battle Creek VA Medical Center. The contractor will have 540 days to complete the work. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25022B0043 Amendment 0004.pdf | ||
| 36C25022B0043 Amendment 0003.pdf | ||
| 02-EP.101 - BUILDING 02 - FIRST FLOOR POWER PLAN.pdf | ||
| 02-EP.100 - BUILDING 02 - BASEMENT POWER PLAN.pdf | ||
| 36C25022B0043 Amendment 0002.pdf | ||
| 36C25022B0043 Amendment 0001.pdf | ||
| 36C25022B0043.pdf | ||
| Wage Determination MI20220100.pdf | ||
| RFI Form Solicitation.doc | DOC document | |
| Project 515-21-202 Specifications.pdf | ||
| Project 515-21-202 SOW.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
EW
S
N
EW
S
N
EW
S
DIRECTOR
ASSISTANT DIRECTOR
ASSOCIATE DIRECTOR
CHIEF, FACILITIES MANAGEMENT
SERVICE
CHIEF, ENGINEERING SERVICE
SAFETY OFFICER
INFECTION CONTROL OFFICER
UNION REPRESENTATIVE
POLICE SERVICE
FIRE DEPARTMENT
CONTRACTING OFFICER
PROJ. #515-21-202 SIGNATURE DATE
INSTALL 800MHZ REPEATERS FOR SECURITY,
VARIOUS BUILDINGS
01/10/2022
VA PROJECT #515-21-202
100% BID DOCUMENTS
DEPARTMENT OF VETERANS AFFAIRS
BATTLE CREEK, MICHIGAN
BATTLE CREEK VA MEDICAL CENTER
PL AY G ROUN D
DETROIT 115 mi
PROJECT LOCATION
CHICAGO 160 mi
KALAMAZOO 23 mi
I-94
(M -9
6) D
IC
K M
A N
R O
A D
A R
M S
T R
O N
G R
O A
D
KALAMAZOO RIVER
TRAINING CENTER
FT CUSTER
H E
L M
E R
R O
A D
BATTLE CREEK
I-94
BATTLE CREEK
LANSING
L A
K E
M
IC
H
IG
A N
KALAMAZOO
RAPIDS
GRAND
ERIE
LAKE
LAKE SUPERIOR
LOCATION MAP
NO SCALE
VICINITY MAP
NO SCALE
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
2/1/2022 4:06:28 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
COVER SHEET
G.001
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% BID DOCUMENTS
Revisions Date
ST
ATE OF MICHIGAN
L
IC
E N
SED PROFESSIONA L E
N G
IN
E
E
RENGINEER
No.
50400
SCOTT E.
TOWNSEND
01-10-2022
DEMOLITION KEY NOTE NUMBER 1
CONSTRUCTION KEY NOTE NUMBER 1
SECTION NUMBER 4
DRAWING NOTATION
SHEET E5.2 ON WHICH
SECTION IS DRAWN
E5.2
L1
DRAWING INDEX
SHEET
NO
APPLICABLE CODES
AND REGULATIONS
CODEYEAR
MICHIGAN BUILDING CODE2015
NATIONAL ELECTRICAL CODE (NFPA 70)
MICHIGAN RESIDENTIAL CODE
MICHIGAN ENERGY CODE
NFPA 20
NFPA 72
NFPA 101
NFPA 110
ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS & FACILITIES
1A
Z1 DAYLIGHTING CONTROL ZONE '1'
(MAY NOT APPEAR ON EVERY
TAG)
SCENE SCHEDULE ID 'A' (MAY
NOT APPEAR ON EVERY TAG) LIGHTING CONTROL
SPACE TYPE '1'
LIGHTING CONTROL TAG
MICHIGAN REHABILITATION CODE
MICHIGAN ELECTRICAL CODE RULES, PART 8
J
F
M
FACP
H
TS
FS
FAA
JUNCTION BOX
ELECTRICAL PANEL
T TRANSFORMER
POWER RECEPTACLE - DUPLEX TYPE
POWER RECEPTACLE - SIMPLEX TYPE
POWER RECEPTACLE - QUADRUPLEX TYPE
POWER RECEPTACLE - DUPLEX 6" ABOVE COUNTER
POWER RECEPTACLE - RECESSED FLOOR TYPE
POWER RECEPTACLE - SPECIALTY TYPE
METER
GROUNDING BAR
DISCONNECT SWITCH - NON-FUSED
DISCONNECT SWITCH - FUSED
DISCONNECT SWITCH - COMB. MOTOR STARTER
POWER SYMBOL LIST
FIRE ALARM SYMBOL LIST
FD
GROUND
GROUNDING ROD
M MOTOR RATED SWITCH
I/O
POWER RECEPTACLE - USB/DUPLEX COMBO. DEVICEUSB
NOTES:
1. DRAWINGS INDICATE DESIGN INTENT ONLY, FINAL LOCATIONS AND
DEVICE SPECIFICATIONS SHALL BE PROVIDED BY FIRE ALARM
MANUFACTURER. REFER TO PROJECT SPECIFICATIONS FOR
APPROVED MANUFACTURERS.
CO
NOTES:
1. ALL DEVICE RATINGS/SIZES SHALL BE COORDINATED WITH PLANS
AND SCHEDULES.
TC TIME CLOCK
MOTOR - SINGLE PHASE
MOTOR - THREE PHASE
CONDUIT DOWN
CONDUIT UP
ELECTRICAL ABBREVIATIONS
DESCRIPTIONSYMBOL
(E)
FACP
FA
AIC
CB
EMT
EWC
AFF
A
AF
AWG
AT
ATS
C
CU
CT
DIA
DISC
EPO
EQUIPMENT
DH
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOLDESCRIPTIONABBREV. DESCRIPTION
E5.2
SHEET E5.2 ON WHICH SECTION IS CUT
(ENLARGED PARTIAL PLAN SIMILAR)
SCALE: 1/4" = 1' - 0"
SECTION
SECTION NO. 6
S
F
F
F
F
F
F
S
CS
S
S
FLA
F
G/GRD
GFCI/GFI
HOA
HP
IG
KV
KVA
KW
KWH
LP
MCB
MDP
MLO
MAX
MIN
NEC
NEMA
N/NEU
NF
NC
NO
NIC
PH. OR Ø
P
PF
PVC
(R)
(RR)
RMC
RP
TBB
TYP.
UC
UL
UPS
USB
V
VA
W
WG
WP
XFMR
AUDIBLE DEVICE - WALL MOUNTED
VISUAL DEVICE - WALL MOUNTED
COMBINATION AUDIBLE/VISUAL DEVICE - WALL MOUNTED
AUDIBLE DEVICE - CEILING MOUNTED
VISUAL DEVICE - CEILING MOUNTED
COMBO AUDIBLE/VISUAL DEVICE - CEILING MOUNTED
CO ALARM/SMOKE DETECTOR
SMOKE DETECTOR
SMOKE DETECTOR WITH AUDIO
CO ALARM
DUCT MOUNTED SMOKE DETECTOR
HEAT DETECTOR
FIRE DEPARTMENT COMMUNICATION OUTLET
EXISTING
NEW
COMBINATION FIRE/SMOKE DAMPER
(VERTICAL)
EXISTING
NEW
COMBINATION FIRE/SMOKE DAMPER
(HORIZONTAL)
MAGNETIC DOOR HOLDER
MANUAL PULL STATION
FLOW SWITCH
TAMPER SWITCH
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM CONTROL PANEL
INPUT/OUTPUT CONTROL MODULE
LIGHTING FIXTURE TAG
COPPER FEEDER SIZE TAG
(REFER TO FEEDER SCHEDULE)
ALUMINUM FEEDER SIZE TAG
(REFER TO FEEDER SCHEDULE)
EQUIPMENT TAG
EXISTING DEVICES OR EQUIPMENT
NEW OR MODIFIED DEVICES OR EQUIPMENT
NEW OR MODIFIED UNDERGROUND WIRING
EXISTING SYSTEM COMPONENT TO BE REMOVED
POINT OF NEW CONNECTION.
ABOVE FINISHED FLOOR
AMPERE
AMPERE FUSE/AMPERE FRAME
AMERICAN WIRE GAUGE
AMPERE TRIP
AUTOMATIC TRANSFER SWITCH
AVAILABLE INTERRUPTING CURRENT (AMPS)
CONDUIT OR CEILING MOUNTED
CIRCUIT BREAKER
COPPER
CURRENT TRANSFORMER
DIAMETER
DISCONNECT
ELECTRICAL METALLIC TUBING
ELECTRIC WATER COOLER
EMERGENCY POWER OFF
EXISTING ELECTRICAL EQUIPMENT OR WORK
FIRE ALARM
FIRE ALARM CONTROL PANEL
FULL LOAD AMPS
FUSE
GROUND
GROUND FAULT CIRCUIT INTERRUPTER
HAND-OFF-AUTO
HORSEPOWER
ISOLATED GROUND
KILOVOLT
KILOVOLT AMPERE
KILOWATT
KILOWATT HOUR
LIGHTING PANEL
MAIN CIRCUIT BREAKER
MAIN DISTRIBUTION PANEL
MAIN LUG ONLY
MAXIMUM
MINIMUM
NATIONAL ELECTRICAL CODE
NATIONAL ELECTRICAL MANUFACTURERS ASSOC.
NEUTRAL
NON-FUSIBLE
NORMALLY CLOSED
NORMALLY OPEN
NOT IN CONTRACT
PHASE
POLE
POWER FACTOR
POLYVINYL CHLORIDE (PLASTIC)
RELOCATED EXISTING ELECTRICAL EQUIPMENT
REMOVE AND REINSTALL
RIGID METALLIC CONDUIT
RECEPTACLE PANEL
TELEPHONE BACKBOARD
TYPICAL
UNDERCOUNTER
UNDERWRITERS LABORATORIES
UNINTERRUPTIBLE POWER SUPPLY
UNIVERSAL SERIAL BUS
VOLT
VOLT AMPERE
WATT
WIRE GUARD
WEATHERPROOF
TRANSFORMER
REC OR RECP RECEPTACLE
VFD VARIABLE FREQUENCY DRIVE
NOTE: THE TAG DOES NOT REFLECT THE QUANTITY OF CONTROL DEVICES
REQUIRED IN AREA.
CR
TECHNOLOGY SYMBOL LIST
WAP
NOTES:
1. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR BOX AND CONDUIT FOR
ALL DEVICES INDICATED.
2. LOW VOLTAGE CONTRACTOR SHALL PROVIDE EXACT SPECIFICATIONS AND
LOCATIONS OF ALL DEVICES.
I
TV
DESCRIPTIONSYMBOL
S S
S
BELL OUTLET
CAMERA
CARD READER
TECHNOLOGY OUTLET - 6" ABOVE COUNTER
TECHNOLOGY OUTLET - FLOOR
TECHNOLOGY OUTLET - WALL
LOW VOLTAGE PANEL
TELEVISION OUTLET
PUSH BUTTON
INTERCOM
SPEAKER, WALL - CEILING
WALL CLOCK - SINGLE FACE
WALL CLOCK - DOUBLE FACE
WALL CLOCK AND SPEAKER UNIT
WIRELESS ACCESS POINT
A DISTRIBUTED ANTENNA SYSTEM (DAS) ANTENNA
SYSTEM RISER (DAS)
SYSTEM SPLITTER (DAS)
RI
SP
PROJECT PHASING -
MOST BUILDINGS WITHIN THE SCOPE OF WORK OF THIS PROJECT ARE
OCCUPIED. THE CONTRACTOR SHALL COORDINATE WITH THE VA TO
MINIMIZE DISRUPTIONS IN OCCUPIED AREAS. CONTRACTOR SHALL
COORDINATE WITH THE VA AND PROVIDE A PHASING PLAN AND
ALTERNATIVE TIME WORK SCHEDULE. BUILDINGS 2 AND 7 ARE PATIENT
AREAS WHICH SHALL REMAIN OCCUPIED DURING CONSTRUCTION.
30N
35N
40N
45N
50N
60N
70N
80N
90N
100N
25N
20N
15N
30S
35S
40S
45S
50S
60S
70S
80S
90S
100S
25S
20S
15S
3 WIRE WITH GROUND 4 WIRE WITH GROUND
COND.
SIZE
FEEDER
(AMPS)
3#12, 1#12 GND IN 3/4"C
3#12, 1#12 GND IN 3/4"C
3#10, 1#10 GND IN 3/4"C
3#10, 1#10 GND IN 3/4"C
3#8, 1#10 GND IN 3/4"C
3#8, 1#10 GND IN 3/4"C
3#6, 1#10 GND IN 3/4"C
3#6, 1#10 GND IN 3/4"C
3#4, 1#10 GND IN 1"C
3#4, 1#8 GND IN 1"C
3#3, 1#8 GND IN 1"C
3#2, 1#8 GND IN 1 1/4"C
3#1, 1#8 GND IN 1 1/4"C
1 4#1, 1#8 GND IN 1 1/2"C
4#2, 1#8 GND IN 1 1/2"C
4#3, 1#8 GND IN 1 1/4"C
4#4, 1#8 GND IN 1 1/4"C
4#4, 1#10 GND IN 1 1/4"C
4#6, 1#10 GND IN 1"C
4#6, 1#10 GND IN 1"C
4#8, 1#10 GND IN 3/4"C
4#8, 1#10 GND IN 3/4"C
4#10, 1#10 GND IN 3/4"C
4#10, 1#10 GND IN 3/4"C
4#12, 1#12 GND IN 3/4"C
4#12, 1#12 GND IN 3/4"C
COPPER FEEDER SCHEDULE
COND.
SIZE
FEEDER
(AMPS)
2 WIRE WITH GROUND
COND.
SIZE
FEEDER
(AMPS)
2#12, 1#12 GND IN 3/4"C
2#12, 1#12 GND IN 3/4"C
2#10, 1#10 GND IN 3/4"C
2#10, 1#10 GND IN 3/4"C
2#8, 1#10 GND IN 3/4"C
2#8, 1#10 GND IN 3/4"C
2#6, 1#10 GND IN 3/4"C
2#6, 1#10 GND IN 3/4"C
2#4, 1#10 GND IN 1"C
2#4, 1#8 GND IN 1"C
2#3, 1#8 GND IN 1"C
2#2, 1#8 GND IN 1"C
2#1, 1#8 GND IN 1 1/4"C
NOTES:
1. AMPACITIES FOR FEEDER SIZES ARE BASED ON N.E.C. CODE 110-14. (TERMINATION PROVISIONS FOR EQUIPMENT RATED 100A OR LESS ARE RATED FOR USE WITH CONDUCTORS RATED 60°C. TERMINATION PROVISIONS FOR EQUIPMENT RATED GREATER THAN
100A ARE RATED FOR USE WITH CONDUCTORS RATED 75°C.)
2. CONDUIT FILL IS BASED ON 40% FILL USING SINGLE CONDUCTOR BUILDING WIRE OF INSULATION TYPES THHN, THWN, THWN-2, XHH, XHHW, AND XHHW-2 IN RMC. FOR OTHER RACEWAY TYPES REFER TO APPROPRIATE N.E.C. APPENDIX C TABLES.
3. EQUIPMENT GROUND SIZING BASED ON N.E.C. TABLE 250.122.
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:43:47 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
ELECTRICAL GENERAL
INFORMATION
E.000
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
G.001 COVER SHEET
E.000 ELECTRICAL GENERAL INFORMATION
ES.101 SITE PLAN
02-EP.100 BASEMENT POWER PLAN
02-EP.101 FIRST FLOOR POWER PLAN
02-EP.102 SECOND FLOOR POWER PLAN
05-EP.100 BASEMENT POWER PLAN
05-EP.101 FIRST FLOOR POWER PLAN
05-EP.102 SECOND FLOOR POWER PLAN
07-EP.100 BASEMENT POWER PLAN
07-EP.101 FIRST FLOOR POWER PLAN
07-EP.102 SECOND FLOOR POWER PLAN
14-EP.100 BASEMENT POWER PLAN
14-EP.101 FIRST FLOOR POWER PLAN
14-EP.102 SECOND FLOOR POWER PLAN
22-EP.100 BASEMENT POWER PLAN
22-EP.101 FIRST FLOOR POWER PLAN
22-EP.102 SECOND FLOOR POWER PLAN
27-EP.101 FLOOR POWER PLANS
39-EP.100 BASEMENT POWER PLAN
39-EP.101 FIRST FLOOR POWER PLAN
39-EP.102 SECOND FLOOR POWER PLAN
82-EP.100 BASEMENT POWER PLAN
82-EP.100s SUB BASEMENT POWER PLAN
82-EP.101 FIRST FLOOR POWER PLAN
82-EP.102 SECOND FLOOR POWER PLAN
83-EP.100 BASEMENT POWER PLAN
83-EP.101 FIRST FLOOR POWER PLAN
83-EP.102 SECOND FLOOR POWER PLAN
84-EP.100 BASEMENT POWER PLAN
84-EP.101 FIRST FLOOR POWER PLAN
84-EP.102 SECOND FLOOR POWER PLAN
EP.500 ELECTRICAL DETAILS
EP.501 ELECTRICAL DETAILS
EP.502 ELECTRICAL DETAILS
Revisions Date
NORTH
GRID
G
G
G
G
G
G
G
G
G
G
G
G G
G
G
G
A rm s tro n g
R o a d
Lam ber s
Tra il
Ur ba n
Dr iv e
S ha el c f re t iCr u So ht
Dewe y
Lane
F u rlo n g
La n e
S h a fte r C irc le
N o rth
WilliamsLane
J o h n s o n
D riv e
F o x
La n e
Shafter Circle West
S h a fte r C irc le
E a s t e n a l l a r o l
F
H a m m er b er g
La n e
P
O P
V V
V V
V
V
V
V
V
V
N O
P A R K
IN
G
V
V
V
V
V
V
V
P P
VV G
P
PP
L A B
G G G
G G G G G G
FD
FD
FD
FD
VV
C U C
C U
CV V V
C U C
C U C
CU
CU
OP
PPP V
ON
A V
E L
TRO PH
PLAYGROUND
VAMC boundary
BUILDING 14
BUILDING 7
BUILDING 39
BUILDING 82
BUILDING 5
BUILDING 2
BUILDING 83
BUILDING 84
BUILDING 22
BUILDING 27
S1
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:43:50 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
SITE PLAN
ES.101
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
ELECTRICAL SITE PLAN KEYED NOTES
S1 PROVIDE FIBER CONNECTION BETWEEN BUILDINGS. ROUTE THROUGH EXISTING
PATHWAYS ON CAMPUS, COORDINATE WITH VA. REFER TO PLANS FOR FIBER QUANTITIES
AND TERMINATION LOCATIONS.
A
SP
A
A
A
WAITING ROOM
RECEPTION
STORAGE
2202B
CHASE
2203A
WAITING
TOILET
2203A
CHASE
2204E
WOMENS TOILET
MENS TOILET
CHASE
2207E
H.A.C.
OFFICE
STORAGE
CONFERENCE/BREAK
ROOM
2212STORAGE
LOCKERS
OFFICE
OFFICE
DEV LAB
OFFICE
OFFICE
MICROBIOLOGY
BIOSAFETY LAB
2220A
OFFICE
2220B
MEDICAL WASTE
CORRIDOR
C22
STAIR
S3
LAB
STAIR
S1
ULTRASOUND
TOILET
2222A H.A.C.
CORRIDOR
STORAGE
2224A
BREAKROOM
STORAGE
2225A
ELEV
E2
ELEV
E1
ELEV
E3
OFFICE
OFFICE
X-RAY
FILM PROCESSING
TOILET
2231A
X-RAY
OFFICE
WAITING AREA
CORRIDOR
C23
CONTROL
X-RAY 1
BATH
2237A
EXAM
STAIR
S2
OFFICE
360 X-RAY
TREATMENT
TREATMENT ROOM
TREATMENT ROOM
SOILED UTILITY
TREATMENT ROOM
TREATMENT ROOM
TREATMENT ROOM
DENTIST OFFICES
OFFICE
OFFICE
2249A
CORRIDOR
C24
H.A.C.
STORAGE
OFFICE
DENTAL
PROSTHETIC LAB
LOUNGE ROOM
TREATMENT
TREATMENT
MENS TOILET
CHASE
2259E
WOMENS TOILET
CHASE
2261E
CORRIDOR
C25
H.A.C.
EXAM
OFFICE
2263A
WAITING ROOM
EXAM
2264A
RECEPTION
CT CONTROL ROOM
CT GANTRY
NUCLEAR MEDICINE
HOT LAB
2271A
HOT LAB
2271B
TOILET
STRESS TESTING
STAIR
S5
STORAGE
CORRIDOR
C26
CORRIDOR
C21
STAFF OFFICES
R2
CAP
DOWN FROM ROOF TO LIGHTNING
ARRESTORS BELOW ON 2ND FLOOR.
LOCATION TBD.
R4
R4
R4
R4
R4
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:43:45 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
SECOND FLOOR POWER PLAN
02-EP.102
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 3/32" = 1'-0"
SECOND FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA
CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 ACTUAL LOCATION OF DONOR ANTENNAS ON ROOF TO BE FIELD VERIFIED. SHOWN HERE
ON DRAWING FOR PURPOSES FOR EACH DONOR RUN OF 100'. DIRECTION IN WHICH DONOR
ANTENNAS POINT TBD.
R3 PROVIDE 12 STRAND, SINGLE MODE, ARMORED CABLE TO EACH BUILDING LISTED:
5, 7, 14, 22, 27, 39, 82, 83 AND 84.
COORDINATE WITH COR TO ROUTE CABLE IN EXISTING PATHWAYS ON CAMPUS.
R4 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
All new equipment shall match.
A
SP
RI
SPA
A
SP
STORAGE
MAIN
REFRIGERATION
TRANSFORMER
ROOM
004A
STORAGE
XXX
STAIR
S4
CORRIDOR
C01
CORRIDOR
XXX
CRAWL SPACE
XXX
TANK ROOM
XXX
CORRIDOR
005E
PIPE TUNNEL
XXX
AREA WELL
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
CRAWL SPACE
XXX
STAIR
S3
ELEV
R3
R3
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:56:30 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
BASEMENT POWER PLAN
05-EP.100
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
BASEMENT POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA
CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPICITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE BACK TO MAIN EQUIPMENT
RACK IN BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2. REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
DN
DN
DN
SP
A
RI
A
A
A SP
A
RI
RETAIL STORE
100A
STORAGE
100B
FOOD COURT
100C
TOILET
100D STORAGE
100F
H.A.C.
100G
STAIR
S2
OFFICE
100H
OFFICE
100I
PATIENT DINING
CORRIDOR
C11
CORRIDOR
C12
COOKING/ FOOD
PREP
SUPERVISOR
101A
CORRIDOR
C13
CORRIDOR
C14
CORRIDOR
C15
WOMENS TOILET
LOCKERS
102A
DINING ROOM
103K
CLINICAL SECTION
CHIEF
103B
SECRETARY
103C
CHIEF
103D
ELEV
STAIR
S3
SUPERVISORS
FEC
101B
REFRIGERATOR
101C
DISH ROOM
101E
REFRIGERATOR
CLERKS
H.A.C.
INGREDIENT
CONTROL/ PANTRY
108A
TOILET
106A
EQUIPMENT
CLEANING
REFRIGERATOR
SOILED LINEN
FOOD TRAY
ASSEMBLY
REFRIGERATOR
STORAGE
REFRIGERATOR
119B
REFRIGERATOR
119C
CORRIDOR
C16
CORRIDOR
C17
CORRIDOR
C18
RECEIVING
FREEZER
116A
CART WASH
PAPER STORAGE
112A
PAPER STORAGE
112B
MECHANICAL
113E
MENS TOILET
DATA
100E
STORAGE
100J
FEC
103A
GROUP OFFICE
103H
REFRIGERATOR
101D
STAIR
S1
CORRIDOR
C12A
NOURISHMENT
101B
CORRIDOR
103E
CLOSET
103F
TEMP KITCHEN
103G
SERVING
100L
LOADING DOCK
101F
STAIR
S4
OFFICE
100J
CAPR1
R2
R3
R3
R3
R3
R3
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:56:33 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
FIRST FLOOR POWER PLAN
05-EP.101
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
FIRST FLOOR POWER PLAN
KEY PLAN
POWER KEYED NOTES
R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA
CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPICITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE BACK TO MAIN EQUIPMENT
RACK IN BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2. REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
RI SP
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
WOMENS TOILET
FEC
MENS TOILET
MAS OFFICE
CORRIDOR
C21
CLOSET
208A
H.A.C.
OFFICE
OFFICE
OFFICE
OFFICE
BREAKROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
H.A.C.
CORRIDOR
C22
STAIR
S1
STAIR
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:56:34 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
SECOND FLOOR POWER PLAN
05-EP.102
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
SECOND FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA
CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPICITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE BACK TO MAIN EQUIPMENT
RACK IN BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2. REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
SP
A A
A
STAIR
S4
STAIR
S3
STAIR
S2
STAIR
S5-0B
STAIR
S1-0B
STORAGE
STORAGE
STORAGE
BEHAVIORAL
HEALTH,
MESSENGER POOL
STAFF AREA
STORAGE
003A OFFICE
005A
OFFICE
005B
OFFICE
005C
ELEC
006E
ELEC
B38
MECH
STORAGE
STAIR
S6
H.A.C.
008A
STORAGE
009A
STORAGE
009B
MECH
009D
TOILET
CHASE
010E H.A.C.
MECH
011EOFFICE
VACANT
STORAGE
VACANT
WOMENS LOCKER
TOILET
016A
ELEC
027E
MORGUE
TOILET
VACANT
VACANT
VACANT
OFFICE
028A
TOILET
028C
STORAGE
028B
STORAGE
H.A.C.
CORRIDOR
C02
STORAGE
CORRIDOR
C05
CORRIDOR
C03
WHEEL CHAIR
REPAIR
CORRIDOR
C04
ELEV
S5
CLOSET
S7
ATRIUM
S8
VESTIBULE
S9
ELEV MACHINE
S10
ELEV
S11
LOBBY
S13
R1
R3
R3
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:59:16 PM
INSTALL 800MHZ REPEATER
FOR SECURITY SERVICE,
VARIOUS BUILDINGS
01.10.2022
BASEMENT POWER PLAN
07-EP.100
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
BASEMENT POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A A
DATA
OFFICE
OFFICE
GROUP
OFFICE
OFFICE
TOILET
OFFICE
OFFICE
INTERVIEW
LOUNGE
GROUP
OFFICE
WORK ROOM
OFFICE
OFFICE
GROUP ROOM
OFFICE
OFFICE
ELEC
169E
LAB
MEDS
TREATMENT
WAITING ROOM
STAIR
S1
TOILET
OFFICE
OFFICE
GROUP
GROUP
OFFICE
CORRIDOR
OFFICE
TRAINING
GROUP
OFFICE
OFFICE
TOILET
OFFICE
OFFICE
OFFICE
OFFICE
STAIR
S2
CORRIDOR
C1-4
CORRIDOR
C1-1
RECEPTION
CORRIDOR
C1-3
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
BIOFEEDBACK
CONTROL
STAFF
TOILET
BIOFEEDBACK LAB
TESTING
131A
CUBICLE
TOILET
OFFICE
ELEV
P-1
H.A.C.
OFFICE
WORK ROOM
OFFICE
TOILET
OFFICE
OFFICE
ELEV
P-2
MECH
102A
LOBBY
ATRIUM
A101
TOILET
ELEC
108E
OFFICE
OFFICE
128OFFICE
OFFICE
WORK
TOILET
OFFICE
COMMUNICATION
CLERICAL
102A
CAP
R1
R2
R3
R3
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:59:19 PM
INSTALL 800MHZ REPEATER
FOR SECURITY SERVICE,
VARIOUS BUILDINGS
01.10.2022
FIRST FLOOR POWER PLAN
07-EP.101
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
FIRST FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A
STAIR
S2-02
SHELL SPACE
CHIEF
PSYCHOLOGY
SERVICE
ADMINISTRATIVE
OFFICER
3 BED ROOM
ELEC
STAFF LOUNGE
INTERVIEW ROOM
TOILET
207A
STAIR
S1-02
CORRIDOR
H.A.C.
ELEC
209E
CLERICAL
OFFICE
SOCIAL WORK
SUPERVISOR
OFFICE
215 CHIEF PSYCHIATRY
SERVICE
SHELL SPACE
TOILET
CORRIDOR
C21
OFFICE
MENTAL HEALTH
SECTION
SUPERVISOR
WORKROOM
EDUCATION
SECRETARY
CHIEF SOCIAL
WORK SERVICE
CORRIDOR
COMMUNITY
HEALTH NURSING
TOILET
TOILET
H.A.C.
200A
ELEV
P202
LOBBY
CONFERENCE
ROOM
CONFERENCE
ROOM
STORAGE
MENTAL HEALTH
SERVICE
SUICIDE
PREVENTION
COORDINATOR
SUICIDE
PREVENTATION
CASE MANAGER
WORK ROOM
CHIEF MENTAL
HEALTH SERVICE
SECRETARY
PSYCHOLOGY
RECOVERY
COORDINATOR
CHIEF MENTAL
HEALTH NURSE
CORRIDOR
C2-1
ELEV
P201
R3
R3
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 2:59:21 PM
INSTALL 800MHZ REPEATER
FOR SECURITY SERVICE,
VARIOUS BUILDINGS
01.10.2022
SECOND FLOOR POWER PLAN
07-EP.102
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
SECOND FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A AASP
STORAGE
CORRIDOR
C01
CONFERENCE
ROOM
SOILED LINEN
VENDING
VACANT
OFFICE
WAITING
007A
TRANSFORMER
ROOM
008E
DATA
005A
KITCHEN
009A
STORAGE
009B
OFFICE
009C
OFFICE
009D
SOCIAL WORK
OFFICE
009F
OFFICE
009G
CONFERENCE
009H
OFFICE
009I
OFFICE
009J
CONFERENCE
009K
STAIR
S1
TOILET STAFF
CHASE
010E
MENS TOILET
STORAGE
STORAGE
OFFICE
OFFICE
WOMENS TOILET
CORRIDOR
C03
CORRIDOR
C02
CHASE
015E
CHASE
016E
SHOWER ROOM
016A
STAIR
S2 MECH
S01E
OFFICE
OFFICE
CONFERENCE
PRINTING
H.A.C.
Room
019A Room
019B
BREAK ROOM
017A
OFFICE
017B
OFFICE
017C
OFFICE
017D
MECH
017E
OFFICE
017F
OFFICE
017G
OFFICE
017H
OFFICE
017I
OFFICE
017J
OFFICE
017K
OFFICE
017L
OFFICE
017M
RECEPTION
CORRIDOR
A
MECH
007J
OFFICE
007B
OFFICE
007C
CONFERENCE
ROOM
007D
OFFICE
007E
OFFICE
007F
OFFICE
007G
OFFICE
007H
ELEV
S3
R3 R3
R3
CABLE TO
FLOOR ABOVE
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:03:20 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
BASEMENT POWER PLAN
14-EP.100
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
BASEMENT POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A AA
CORRIDOR
C11
TOILET
WAITING
OFFICE
CLEAN LINEN
SOILED LINEN
CMS
1 BED
CORRIDOR
1 BED
1 BED
109 BREAKROOM
2 BED
3 BED
4 BED
1 BED
LAUNDRY
H.A.C.
SHOWERS
115A
MENS TOILET
CHASE
117E
1 BED
CORRIDOR
C13
1 BED
2 BED
121A
DAY ROOM
121B
2 BED
121C
BREAKROOM
CONFERENCE
H.A.C.
1 BED
1 BED
MED
RECEPTION
STAIR
S1
CORRIDOR
C12
BEDROOM
CORRIDOR
C15
CORRIDOR
C14
BEDROOM
130A
TOILET
BEDROOM
BREAKROOM
TOILET
STORAGE
STORAGE
OFFICE
OFFICE
OFFICE
H.A.C.
OFFICE
OFFICE
142A
DAY ROOM
142B
PORCH
142C
OFFICE
142D
KITCHEN
MENS TOILET
CHASE
145E
H.A.C.
SHOWER
QUIET ROOM
148A
CORRIDOR
C17
CONFERENCE
148B
RECREATION
148C
1 BED
148D
BEDROOM
148F
EXAM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
C16
STAIR
S2
TOILET
101A
DIRTY LINEN
115A
CORRIDOR
CORRIDOR
B
CHASE
135E
CORRIDOR
CHASE
143E
SHOWER
147A
CORRIDOR
D
CAP
R1
R2
R3
R3
R3R3
CABLE TO
FLOOR
BELOW AND
ABOVE
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:03:23 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
FIRST FLOOR POWER PLAN
14-EP.101
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
FIRST FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
AA A
CORRIDOR
C21
FAMILY WAITING
201 OFFICE
LINEN
SOILED LINEN
1 BED
1 BED
ANTEROOM
1 BED
1 BED
QUIET ROOM
2 BED
3 BED
3 BED
1 BED
SHOWER
H.A.C.
CHASE
217E
CHUTE
CORRIDOR
C24
CORRIDOR
C23
TOILET
3 BEDS
2 BEDS
4 BEDROOM
2 BEDS
3 BEDS
H.A.C.
1 BED
1 BED
MED
STATION
BEDROOM
BEDROOM
WOMENS LOUNGE
TOILET
STAFF BREAK
TOILET
STORAGE
235STORAGE
OFFICE
EXAM
OFFICE
239H.A.C.
OFFICE
DAYROOM
CORRIDOR
C25
CORRIDOR
C26
CORRIDOR
C22
CORRIDOR
C27
PORCH
242A
STAIR
S2-02
CORRIDOR
C28
LAUNDRY
MENS TOILET
CHASE
245E
STORAGE
CONFERENCE
GROUP ROOM
248A
GROUP ROOM
248C
GROUP ROOM
248B
INTERVIEW OFFICE
CORRIDOR
C29
OFFICE
OFFICE
NURSING
NURSING
NURSING
TOILET
254A
STAIR
S1
TOILET
CHASE
219E
CHASE
235E
CHASE
243E
VENDING
246A
CORRIDOR
TOILET
207A
CABLE TO
FLOOR BELOW
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:03:25 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
SECOND FLOOR POWER PLAN
14-EP.102
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
SECOND FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
ELEC
B24
STORAGE
B22
MECHANICAL
B21
STORAGE
B20
EXISTING
BASEMENT
STAIRS
S2
CABLE TO
FLOOR ABOVE
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:05:29 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
BASEMENT POWER PLAN
22-EP.100
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
BASEMENT POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A
A
CORRIDOR
C101
STAIRS
S1
NURSE OFFICE
STAIRS
S3
STAIRS
S2
PATIENT/EDUCATION/
CONFERENCE
ROOM
EXIST ELEV
LOADING
ELEC
132 STORAGE
TOILET
106A
PORCH
P11
DOMICILARY
MANAGER OFFICE
PHYSICIAN OFFICE
CLERICAL OFFICE
COUNSELOR
OFFICE
COPY/MAIL/SPD
SUPPLIES
ELEC
144E
STAFF LOUNGE
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
SOCIAL WORK
OFFICE
STAFF TOILET
STAFF TOILET
ELEV MACHINE RM
PATIENT/EDUCATION/
GROUP ROOM
VENDING
H.A.C.
SPD SUPPLY
STORAGE PATIENT
CLOTHING
WAITING
PRIVATE ROOM
VESTIBULE
C107
TOILET
100A
STORAGE
NURSE STATION
EXAM ROOM
TOILET
125A
SELF MEDS
ELEC
123E
CLOSET
EQUIPMENT
STORAGE
TOILET
107A
PRIVATE ROOM
PRIVATE ROOM
PRIVATE ROOM
TOILET
105A TOILET
104A
PRIVATE ROOM
SCHEDULER/
INTERVIEW OFFICE
CONSULT/ LOUNGE
SEMI-PRIVATE
ROOM
TOILET
103A
TOILET
102A
SEMI-PRIVATE
ROOM
CLOSET
114A
SEMI-PRIVATE
ROOM
PRIVATE ROOM
TOILET
112A
TOILET
111A
PRIVATE ROOM
SEMI-PRIVATE
ROOM
TOILET
110A
COMPUTER/
PATIENT LOUNGE
TOILET
113A
PANTRY
MED ROOM
TOILET
HAC
SOILED LINEN
CLEAN LINEN
TOILET
LAUNDRY
CORRIDOR
C102
CORRIDOR
C103
CORRIDOR
C104
ELEV
C24
CAP
R1
R2
R3
R3
R3
R3
CABLE TO
FLOOR ABOVE
CABLE TO
FLOOR BELOW
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:05:32 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
FIRST FLOOR POWER PLAN
22-EP.101
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
FIRST FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
SEMI-PRIVATE
ROOM
BATH
207A
SEMI-PRIVATE
ROOM
BATH
208A
PRIVATE ROOM
BATH
209A
ELECT
210E
CLEAN LINEN
STORAGE
SOILED LINEN
BATH
214A
BF PRIVATE ROOM
PATIENT LOUNGE
TOILET
WOMEN'S LOUNGE
SEMI-PRIVATE
ROOM
PANTRY
BATH
205A
STAIRS
S1
PRIVATE ROOM
BATH
203A
BATH
202A
SEMI-PRIVATE
ROOM
BATH
201A
PRIVATE ROOM
DATA
MONUMENTAL
STAIRS 3
S3
COORIDOR C2-2
C202
CORRIDOR
C20
PRIVATE ROOM
BATH
219A
SEMI-PRIVATE
ROOM
BATH
222A
SEMI-PRIVATE
ROOM
BF PRIVATE ROOM
MECH
BATH
223A
SEMI-PRIVATE
ROOM
H.A.C.
BATH
224A
STAIRS 2
S2
SEMI-PRIVATE
ROOM
BATH
227A
BATH
226A
SEMI-PRIVATE
ROOM
BATH
228A
BF PRIVATE ROOM
NURSE STATION
CORRIDOR
C23
BATH
220A
OFFICE
ELEVATOR P-1
P201
ELEC
221E
MECH
201M
EXERCISE ROOM
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:05:33 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
SECOND FLOOR POWER PLAN
22-EP.102
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
SECOND FLOOR POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A
ELECTRIC
115E
OFFICE
MALE LOCKER
ROOM
OFFICE
CLOSET
117A
LOBBY
OFFICE
CORRIDOR
C12
KITCHEN
MENS TOILET
WOMENS TOILET
STORAGE
H.A.C.
HOLDING CELL
ARMORY
109A
EVIDENCE
OFFICE
CORRIDOR
C11
OFFICE
103INTERVIEW ROOM
102A
TRAINING
VESTIBULE
OFFICE
100G
OFFICE
100H
CORRIDOR
C13A
OFFICE
100I
OFFICE
100F
OFFICE
100C
OFFICE
100B
BREAK ROOM
100J
OFFICE
100A
OFFICE
100K
ELECTRIC
WORKSHOP
LOADING DOCK
OFFICE
100D
CLOSET
100G1
CAP
R1
R2
R3
R3
R3
Room
Room
002A
Room
Room
001A
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:08:03 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
FLOOR POWER PLANS
27-EP.101
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 1/8" = 1'-0"
FIRST FLOOR POWER PLAN
KEY PLAN
SCALE: 1/8" = 1'-0"
BASEMENT POWER PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
AA
A SP
SP
HAC
STORAGE
WOMENS TOILET
OFFICE
AREA
MAINTAINENCE
OFFICE
COMPUTER REPAIR
SHOP
OFFICE
006A
CLOSET
006B
STORAGE
007B
TOILET
007C
CORRIDOR
C01
CORRIDOR
C-0
VESTIBULE
011A
CORRIDOR
008B
FOOD
PREP(COOK/CHILL)
008A
THERAPY
STAIR
S2-0B
STAIR
S3
STORAGE
UNISEX TOILET
MECHANICAL
STORAGE
009A
BARBER/BEAUTY
SHOP
STORAGE
012A
STORAGE
012B
STAIR
S5
CORRIDOR
C02
CORRIDOR
C03
ELECTRICAL
013E
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
UNISEX TOILET
OFFICE
CLEAN LINEN
ENVIROMENTAL
MANAGEMENT
STORAGE
STORAGE
033OFFICE
STAIR
S6-0B
CORRIDOR
C04
CORRIDOR
C05
CORRIDOR
BC-01
CORRIDOR
BC-02
CORRIDOR
BC-03
CORRIDOR
BC-04
CORRIDOR
BC-05
RECEIVING
BC-06
STAIR
BS2
ELEVATOR
B1
ELEVATOR
EQUIPMENT
B001
SOILED LINEN
B002
STORAGE
B003
H.A.C
B004
DATA
B005
STORAGE
B006
MECHANICAL
B010
STORAGE
B020
ELECTRICAL
B030
MECHANICAL
B040
STAIR
BS1
ELEVATOR
S7
CAP
R1
R2
R3 R3
R3
R3
R3
VA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: VA CHIEF ENGINEER
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
STAMP
CONSULTANT
321 4 5 6 7 8 9 10
FOR CONSTRUCTION
1/10/2022 3:09:38 PM
INSTALL 800MHZ REPEATER
FOR SECURITY, VARIOUS
BUILDINGS
01.10.2022
BASEMENT POWER PLAN
39-EP.100
MMRSET
515-21-202
Battle Creek, Michigan (515)
VA Station No:
100% CONSTRUCTION
DESIGN
SCALE: 3/32" = 1'-0"
BASEMENT POWER PLAN
KEY PLAN
POWER GENERAL NOTES
1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND
WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE
RECEPTACLE.
2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF
DEVICES.
3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.
4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.
5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.
6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO
EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE
EVENT OF LOSS OF NORMAL POWER.
POWER KEYED NOTES
R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO
EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.
R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EUIPMENT RACK IN
BUILDING 2.
R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED
BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,
SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.
ELECTRICAL DEMOLITION NOTES
1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND
THE EXTENT OF DEMOLITION WORK.
2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)
COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.
BCVAMC uses 741MHz frequency.
A SP
A A
A
RI
SP A
BED
EXAM
BED
BED
LAUNDRY
104A
CLEAN UTILITY
104 BED
103A
DAY ROOM
GROUP ROOM
105A
CORRIDOR
C-21
NOURISHMENT
105E
MEDS
107A
TOILET
107D
STAFF ROOM
QUIET ROOM
MENS TOILET
SHOWER
TOILET
BEDROOM
BEDROOM
BEDROOM
BEDROOM
H.A.C.
108A
NURSE STATION
C24A
CORRIDOR
C14
CORRIDOR
C15
CORRIDOR
C13
STAIR
S3
SOILED UTILITY
BED
BED
BED
LOCKERS
OFFICE
OFFICE
BREAK ROOM
CONFERENCE
VISITORS ROOM
OFFICE
OFFICE
BED
BATH
STAIR
S5-01
EXAM
SOILED UTILITY
CORRIDOR
C12
CORRIDOR
C16
CORRIDOR
C17
CORRIDOR
C18
STAIR
S6-01
BED
BED
BED
MENS TOILET
H.A.C.
SHOWER
138B
OFFICE
137A TOILET
139B
STAFF ROOM
CORRIDOR
C19
NURSE STATION
C18A
MEDS
139A
DAY ROOM
CORRIDOR
C20
GROUP ROOM
141A
NOURISHMENT
141B
LAUNDRY
142A
CLEAN UTILITY
142B
BED
143A
BED
143B BEDROOM
BED
OFFICE
STORAGE
144A
CORRIDOR
C11
STAIR
S4-01
ELEVATOR
CORRIDOR
BC-11
CORRIDOR
BC-12
CORRIDOR
BC-13
CORRIDOR
BC-14
CORRIDOR
BC-15.2
CORRIDOR
BC-16
CORRIDOR
BC-17.2
CORRIDOR
BC-4
CORRIDOR
BC-17.1
CORRIDOR
BC-15.1
ELEVATOR
B1-1
UNIT EQUIPMENT
B101
SOILED LINEN
B102
H.A.C.
B104
CLEAN LINEN
B105
TREATMENT
B106
OFFICE
B107
OFFICE
B108
OFFICE
B109
OFFICE
B110
STAFF OFFICE
B111
OFFICE
B112
NURSE STATION
B113
GROUP ROOM
B114
STORAGE
B113A
STORAGE
B118A
MEDS
B120
TOILET
B121
SECLUSION
B122
SEMI
B123
ANTEROOM
B124
SEMI
B125
ISOLATION
B126
SEMI
B127
PRIV…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .