Project 515-21-202 Drawings.pdf

PDF 13 MB Posted

Attached to
Install 800MHZ Repeater for Security 515-21-202 Federal contract opportunity
Solicitation number
36C25022B0043
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document outlines a federal contract opportunity for installation services. The solicitation seeks a contractor to furnish all labor, material, equipment, supervision, documentation and related information to install 800MHZ repeaters campus wide at the VA Medical Center in Battle Creek, Michigan. This is intended to increase the 800MHZ service for the Battle Creek VA Medical Center. The contractor will have 540 days to complete the work. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Other files attached to Install 800MHZ Repeater for Security 515-21-202, newest first.
File Type Posted
36C25022B0043 Amendment 0004.pdf PDF
36C25022B0043 Amendment 0003.pdf PDF
02-EP.101 - BUILDING 02 - FIRST FLOOR POWER PLAN.pdf PDF
02-EP.100 - BUILDING 02 - BASEMENT POWER PLAN.pdf PDF
36C25022B0043 Amendment 0002.pdf PDF
36C25022B0043 Amendment 0001.pdf PDF
36C25022B0043.pdf PDF
Wage Determination MI20220100.pdf PDF
RFI Form Solicitation.doc DOC document
Project 515-21-202 Specifications.pdf PDF
Project 515-21-202 SOW.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

EW

S

N

EW

S

N

EW

S

DIRECTOR

ASSISTANT DIRECTOR

ASSOCIATE DIRECTOR

CHIEF, FACILITIES MANAGEMENT

SERVICE

CHIEF, ENGINEERING SERVICE

SAFETY OFFICER

INFECTION CONTROL OFFICER

UNION REPRESENTATIVE

POLICE SERVICE

FIRE DEPARTMENT

CONTRACTING OFFICER

PROJ. #515-21-202 SIGNATURE DATE

INSTALL 800MHZ REPEATERS FOR SECURITY,

VARIOUS BUILDINGS

01/10/2022

VA PROJECT #515-21-202

100% BID DOCUMENTS

DEPARTMENT OF VETERANS AFFAIRS

BATTLE CREEK, MICHIGAN

BATTLE CREEK VA MEDICAL CENTER

PL AY G ROUN D

DETROIT 115 mi

PROJECT LOCATION

CHICAGO 160 mi

KALAMAZOO 23 mi

I-94

(M -9

6) D

IC

K M

A N

R O

A D

A R

M S

T R

O N

G R

O A

D

KALAMAZOO RIVER

TRAINING CENTER

FT CUSTER

H E

L M

E R

R O

A D

BATTLE CREEK

I-94

BATTLE CREEK

LANSING

L A

K E

M

IC

H

IG

A N

KALAMAZOO

RAPIDS

GRAND

ERIE

LAKE

LAKE SUPERIOR

LOCATION MAP

NO SCALE

VICINITY MAP

NO SCALE

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

2/1/2022 4:06:28 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

COVER SHEET

G.001

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% BID DOCUMENTS

Revisions Date

ST

ATE OF MICHIGAN

L

IC

E N

SED PROFESSIONA L E

N G

IN

E

E

RENGINEER

No.

50400

SCOTT E.

TOWNSEND

01-10-2022

DEMOLITION KEY NOTE NUMBER 1

CONSTRUCTION KEY NOTE NUMBER 1

SECTION NUMBER 4

DRAWING NOTATION

SHEET E5.2 ON WHICH

SECTION IS DRAWN

E5.2

L1

DRAWING INDEX

SHEET

NO

APPLICABLE CODES

AND REGULATIONS

CODEYEAR

MICHIGAN BUILDING CODE2015

NATIONAL ELECTRICAL CODE (NFPA 70)

MICHIGAN RESIDENTIAL CODE

MICHIGAN ENERGY CODE

NFPA 20

NFPA 72

NFPA 101

NFPA 110

ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS & FACILITIES

1A

Z1 DAYLIGHTING CONTROL ZONE '1'

(MAY NOT APPEAR ON EVERY

TAG)

SCENE SCHEDULE ID 'A' (MAY

NOT APPEAR ON EVERY TAG) LIGHTING CONTROL

SPACE TYPE '1'

LIGHTING CONTROL TAG

MICHIGAN REHABILITATION CODE

MICHIGAN ELECTRICAL CODE RULES, PART 8

J

F

M

FACP

H

TS

FS

FAA

JUNCTION BOX

ELECTRICAL PANEL

T TRANSFORMER

POWER RECEPTACLE - DUPLEX TYPE

POWER RECEPTACLE - SIMPLEX TYPE

POWER RECEPTACLE - QUADRUPLEX TYPE

POWER RECEPTACLE - DUPLEX 6" ABOVE COUNTER

POWER RECEPTACLE - RECESSED FLOOR TYPE

POWER RECEPTACLE - SPECIALTY TYPE

METER

GROUNDING BAR

DISCONNECT SWITCH - NON-FUSED

DISCONNECT SWITCH - FUSED

DISCONNECT SWITCH - COMB. MOTOR STARTER

POWER SYMBOL LIST

FIRE ALARM SYMBOL LIST

FD

GROUND

GROUNDING ROD

M MOTOR RATED SWITCH

I/O

POWER RECEPTACLE - USB/DUPLEX COMBO. DEVICEUSB

NOTES:

1. DRAWINGS INDICATE DESIGN INTENT ONLY, FINAL LOCATIONS AND

DEVICE SPECIFICATIONS SHALL BE PROVIDED BY FIRE ALARM

MANUFACTURER. REFER TO PROJECT SPECIFICATIONS FOR

APPROVED MANUFACTURERS.

CO

NOTES:

1. ALL DEVICE RATINGS/SIZES SHALL BE COORDINATED WITH PLANS

AND SCHEDULES.

TC TIME CLOCK

MOTOR - SINGLE PHASE

MOTOR - THREE PHASE

CONDUIT DOWN

CONDUIT UP

ELECTRICAL ABBREVIATIONS

DESCRIPTIONSYMBOL

(E)

FACP

FA

AIC

CB

EMT

EWC

AFF

A

AF

AWG

AT

ATS

C

CU

CT

DIA

DISC

EPO

EQUIPMENT

DH

DESCRIPTIONSYMBOL

DESCRIPTIONSYMBOLDESCRIPTIONABBREV. DESCRIPTION

E5.2

SHEET E5.2 ON WHICH SECTION IS CUT

(ENLARGED PARTIAL PLAN SIMILAR)

SCALE: 1/4" = 1' - 0"

SECTION

SECTION NO. 6

S

F

F

F

F

F

F

S

CS

S

S

FLA

F

G/GRD

GFCI/GFI

HOA

HP

IG

KV

KVA

KW

KWH

LP

MCB

MDP

MLO

MAX

MIN

NEC

NEMA

N/NEU

NF

NC

NO

NIC

PH. OR Ø

P

PF

PVC

(R)

(RR)

RMC

RP

TBB

TYP.

UC

UL

UPS

USB

V

VA

W

WG

WP

XFMR

AUDIBLE DEVICE - WALL MOUNTED

VISUAL DEVICE - WALL MOUNTED

COMBINATION AUDIBLE/VISUAL DEVICE - WALL MOUNTED

AUDIBLE DEVICE - CEILING MOUNTED

VISUAL DEVICE - CEILING MOUNTED

COMBO AUDIBLE/VISUAL DEVICE - CEILING MOUNTED

CO ALARM/SMOKE DETECTOR

SMOKE DETECTOR

SMOKE DETECTOR WITH AUDIO

CO ALARM

DUCT MOUNTED SMOKE DETECTOR

HEAT DETECTOR

FIRE DEPARTMENT COMMUNICATION OUTLET

EXISTING

NEW

COMBINATION FIRE/SMOKE DAMPER

(VERTICAL)

EXISTING

NEW

COMBINATION FIRE/SMOKE DAMPER

(HORIZONTAL)

MAGNETIC DOOR HOLDER

MANUAL PULL STATION

FLOW SWITCH

TAMPER SWITCH

FIRE ALARM ANNUNCIATOR PANEL

FIRE ALARM CONTROL PANEL

INPUT/OUTPUT CONTROL MODULE

LIGHTING FIXTURE TAG

COPPER FEEDER SIZE TAG

(REFER TO FEEDER SCHEDULE)

ALUMINUM FEEDER SIZE TAG

(REFER TO FEEDER SCHEDULE)

EQUIPMENT TAG

EXISTING DEVICES OR EQUIPMENT

NEW OR MODIFIED DEVICES OR EQUIPMENT

NEW OR MODIFIED UNDERGROUND WIRING

EXISTING SYSTEM COMPONENT TO BE REMOVED

POINT OF NEW CONNECTION.

ABOVE FINISHED FLOOR

AMPERE

AMPERE FUSE/AMPERE FRAME

AMERICAN WIRE GAUGE

AMPERE TRIP

AUTOMATIC TRANSFER SWITCH

AVAILABLE INTERRUPTING CURRENT (AMPS)

CONDUIT OR CEILING MOUNTED

CIRCUIT BREAKER

COPPER

CURRENT TRANSFORMER

DIAMETER

DISCONNECT

ELECTRICAL METALLIC TUBING

ELECTRIC WATER COOLER

EMERGENCY POWER OFF

EXISTING ELECTRICAL EQUIPMENT OR WORK

FIRE ALARM

FIRE ALARM CONTROL PANEL

FULL LOAD AMPS

FUSE

GROUND

GROUND FAULT CIRCUIT INTERRUPTER

HAND-OFF-AUTO

HORSEPOWER

ISOLATED GROUND

KILOVOLT

KILOVOLT AMPERE

KILOWATT

KILOWATT HOUR

LIGHTING PANEL

MAIN CIRCUIT BREAKER

MAIN DISTRIBUTION PANEL

MAIN LUG ONLY

MAXIMUM

MINIMUM

NATIONAL ELECTRICAL CODE

NATIONAL ELECTRICAL MANUFACTURERS ASSOC.

NEUTRAL

NON-FUSIBLE

NORMALLY CLOSED

NORMALLY OPEN

NOT IN CONTRACT

PHASE

POLE

POWER FACTOR

POLYVINYL CHLORIDE (PLASTIC)

RELOCATED EXISTING ELECTRICAL EQUIPMENT

REMOVE AND REINSTALL

RIGID METALLIC CONDUIT

RECEPTACLE PANEL

TELEPHONE BACKBOARD

TYPICAL

UNDERCOUNTER

UNDERWRITERS LABORATORIES

UNINTERRUPTIBLE POWER SUPPLY

UNIVERSAL SERIAL BUS

VOLT

VOLT AMPERE

WATT

WIRE GUARD

WEATHERPROOF

TRANSFORMER

REC OR RECP RECEPTACLE

VFD VARIABLE FREQUENCY DRIVE

NOTE: THE TAG DOES NOT REFLECT THE QUANTITY OF CONTROL DEVICES

REQUIRED IN AREA.

CR

TECHNOLOGY SYMBOL LIST

WAP

NOTES:

1. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR BOX AND CONDUIT FOR

ALL DEVICES INDICATED.

2. LOW VOLTAGE CONTRACTOR SHALL PROVIDE EXACT SPECIFICATIONS AND

LOCATIONS OF ALL DEVICES.

I

TV

DESCRIPTIONSYMBOL

S S

S

BELL OUTLET

CAMERA

CARD READER

TECHNOLOGY OUTLET - 6" ABOVE COUNTER

TECHNOLOGY OUTLET - FLOOR

TECHNOLOGY OUTLET - WALL

LOW VOLTAGE PANEL

TELEVISION OUTLET

PUSH BUTTON

INTERCOM

SPEAKER, WALL - CEILING

WALL CLOCK - SINGLE FACE

WALL CLOCK - DOUBLE FACE

WALL CLOCK AND SPEAKER UNIT

WIRELESS ACCESS POINT

A DISTRIBUTED ANTENNA SYSTEM (DAS) ANTENNA

SYSTEM RISER (DAS)

SYSTEM SPLITTER (DAS)

RI

SP

PROJECT PHASING -

MOST BUILDINGS WITHIN THE SCOPE OF WORK OF THIS PROJECT ARE

OCCUPIED. THE CONTRACTOR SHALL COORDINATE WITH THE VA TO

MINIMIZE DISRUPTIONS IN OCCUPIED AREAS. CONTRACTOR SHALL

COORDINATE WITH THE VA AND PROVIDE A PHASING PLAN AND

ALTERNATIVE TIME WORK SCHEDULE. BUILDINGS 2 AND 7 ARE PATIENT

AREAS WHICH SHALL REMAIN OCCUPIED DURING CONSTRUCTION.

30N

35N

40N

45N

50N

60N

70N

80N

90N

100N

25N

20N

15N

30S

35S

40S

45S

50S

60S

70S

80S

90S

100S

25S

20S

15S

3 WIRE WITH GROUND 4 WIRE WITH GROUND

COND.

SIZE

FEEDER

(AMPS)

3#12, 1#12 GND IN 3/4"C

3#12, 1#12 GND IN 3/4"C

3#10, 1#10 GND IN 3/4"C

3#10, 1#10 GND IN 3/4"C

3#8, 1#10 GND IN 3/4"C

3#8, 1#10 GND IN 3/4"C

3#6, 1#10 GND IN 3/4"C

3#6, 1#10 GND IN 3/4"C

3#4, 1#10 GND IN 1"C

3#4, 1#8 GND IN 1"C

3#3, 1#8 GND IN 1"C

3#2, 1#8 GND IN 1 1/4"C

3#1, 1#8 GND IN 1 1/4"C

1 4#1, 1#8 GND IN 1 1/2"C

4#2, 1#8 GND IN 1 1/2"C

4#3, 1#8 GND IN 1 1/4"C

4#4, 1#8 GND IN 1 1/4"C

4#4, 1#10 GND IN 1 1/4"C

4#6, 1#10 GND IN 1"C

4#6, 1#10 GND IN 1"C

4#8, 1#10 GND IN 3/4"C

4#8, 1#10 GND IN 3/4"C

4#10, 1#10 GND IN 3/4"C

4#10, 1#10 GND IN 3/4"C

4#12, 1#12 GND IN 3/4"C

4#12, 1#12 GND IN 3/4"C

COPPER FEEDER SCHEDULE

COND.

SIZE

FEEDER

(AMPS)

2 WIRE WITH GROUND

COND.

SIZE

FEEDER

(AMPS)

2#12, 1#12 GND IN 3/4"C

2#12, 1#12 GND IN 3/4"C

2#10, 1#10 GND IN 3/4"C

2#10, 1#10 GND IN 3/4"C

2#8, 1#10 GND IN 3/4"C

2#8, 1#10 GND IN 3/4"C

2#6, 1#10 GND IN 3/4"C

2#6, 1#10 GND IN 3/4"C

2#4, 1#10 GND IN 1"C

2#4, 1#8 GND IN 1"C

2#3, 1#8 GND IN 1"C

2#2, 1#8 GND IN 1"C

2#1, 1#8 GND IN 1 1/4"C

NOTES:

1. AMPACITIES FOR FEEDER SIZES ARE BASED ON N.E.C. CODE 110-14. (TERMINATION PROVISIONS FOR EQUIPMENT RATED 100A OR LESS ARE RATED FOR USE WITH CONDUCTORS RATED 60°C. TERMINATION PROVISIONS FOR EQUIPMENT RATED GREATER THAN

100A ARE RATED FOR USE WITH CONDUCTORS RATED 75°C.)

2. CONDUIT FILL IS BASED ON 40% FILL USING SINGLE CONDUCTOR BUILDING WIRE OF INSULATION TYPES THHN, THWN, THWN-2, XHH, XHHW, AND XHHW-2 IN RMC. FOR OTHER RACEWAY TYPES REFER TO APPROPRIATE N.E.C. APPENDIX C TABLES.

3. EQUIPMENT GROUND SIZING BASED ON N.E.C. TABLE 250.122.

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:43:47 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

ELECTRICAL GENERAL

INFORMATION

E.000

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

G.001 COVER SHEET

E.000 ELECTRICAL GENERAL INFORMATION

ES.101 SITE PLAN

02-EP.100 BASEMENT POWER PLAN

02-EP.101 FIRST FLOOR POWER PLAN

02-EP.102 SECOND FLOOR POWER PLAN

05-EP.100 BASEMENT POWER PLAN

05-EP.101 FIRST FLOOR POWER PLAN

05-EP.102 SECOND FLOOR POWER PLAN

07-EP.100 BASEMENT POWER PLAN

07-EP.101 FIRST FLOOR POWER PLAN

07-EP.102 SECOND FLOOR POWER PLAN

14-EP.100 BASEMENT POWER PLAN

14-EP.101 FIRST FLOOR POWER PLAN

14-EP.102 SECOND FLOOR POWER PLAN

22-EP.100 BASEMENT POWER PLAN

22-EP.101 FIRST FLOOR POWER PLAN

22-EP.102 SECOND FLOOR POWER PLAN

27-EP.101 FLOOR POWER PLANS

39-EP.100 BASEMENT POWER PLAN

39-EP.101 FIRST FLOOR POWER PLAN

39-EP.102 SECOND FLOOR POWER PLAN

82-EP.100 BASEMENT POWER PLAN

82-EP.100s SUB BASEMENT POWER PLAN

82-EP.101 FIRST FLOOR POWER PLAN

82-EP.102 SECOND FLOOR POWER PLAN

83-EP.100 BASEMENT POWER PLAN

83-EP.101 FIRST FLOOR POWER PLAN

83-EP.102 SECOND FLOOR POWER PLAN

84-EP.100 BASEMENT POWER PLAN

84-EP.101 FIRST FLOOR POWER PLAN

84-EP.102 SECOND FLOOR POWER PLAN

EP.500 ELECTRICAL DETAILS

EP.501 ELECTRICAL DETAILS

EP.502 ELECTRICAL DETAILS

Revisions Date

NORTH

GRID

G

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

A rm s tro n g

R o a d

Lam ber s

Tra il

Ur ba n

Dr iv e

S ha el c f re t iCr u So ht

Dewe y

Lane

F u rlo n g

La n e

S h a fte r C irc le

N o rth

WilliamsLane

J o h n s o n

D riv e

F o x

La n e

Shafter Circle West

S h a fte r C irc le

E a s t e n a l l a r o l

F

H a m m er b er g

La n e

P

O P

V V

V V

V

V

V

V

V

V

N O

P A R K

IN

G

V

V

V

V

V

V

V

P P

VV G

P

PP

L A B

G G G

G G G G G G

FD

FD

FD

FD

VV

C U C

C U

CV V V

C U C

C U C

CU

CU

OP

PPP V

ON

A V

E L

TRO PH

PLAYGROUND

VAMC boundary

BUILDING 14

BUILDING 7

BUILDING 39

BUILDING 82

BUILDING 5

BUILDING 2

BUILDING 83

BUILDING 84

BUILDING 22

BUILDING 27

S1

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:43:50 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

SITE PLAN

ES.101

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

ELECTRICAL SITE PLAN KEYED NOTES

S1 PROVIDE FIBER CONNECTION BETWEEN BUILDINGS. ROUTE THROUGH EXISTING

PATHWAYS ON CAMPUS, COORDINATE WITH VA. REFER TO PLANS FOR FIBER QUANTITIES

AND TERMINATION LOCATIONS.

A

SP

A

A

A

WAITING ROOM

RECEPTION

STORAGE

2202B

CHASE

2203A

WAITING

TOILET

2203A

CHASE

2204E

WOMENS TOILET

MENS TOILET

CHASE

2207E

H.A.C.

OFFICE

STORAGE

CONFERENCE/BREAK

ROOM

2212STORAGE

LOCKERS

OFFICE

OFFICE

DEV LAB

OFFICE

OFFICE

MICROBIOLOGY

BIOSAFETY LAB

2220A

OFFICE

2220B

MEDICAL WASTE

CORRIDOR

C22

STAIR

S3

LAB

STAIR

S1

ULTRASOUND

TOILET

2222A H.A.C.

CORRIDOR

STORAGE

2224A

BREAKROOM

STORAGE

2225A

ELEV

E2

ELEV

E1

ELEV

E3

OFFICE

OFFICE

X-RAY

FILM PROCESSING

TOILET

2231A

X-RAY

OFFICE

WAITING AREA

CORRIDOR

C23

CONTROL

X-RAY 1

BATH

2237A

EXAM

STAIR

S2

OFFICE

360 X-RAY

TREATMENT

TREATMENT ROOM

TREATMENT ROOM

SOILED UTILITY

TREATMENT ROOM

TREATMENT ROOM

TREATMENT ROOM

DENTIST OFFICES

OFFICE

OFFICE

2249A

CORRIDOR

C24

H.A.C.

STORAGE

OFFICE

DENTAL

PROSTHETIC LAB

LOUNGE ROOM

TREATMENT

TREATMENT

MENS TOILET

CHASE

2259E

WOMENS TOILET

CHASE

2261E

CORRIDOR

C25

H.A.C.

EXAM

OFFICE

2263A

WAITING ROOM

EXAM

2264A

RECEPTION

CT CONTROL ROOM

CT GANTRY

NUCLEAR MEDICINE

HOT LAB

2271A

HOT LAB

2271B

TOILET

STRESS TESTING

STAIR

S5

STORAGE

CORRIDOR

C26

CORRIDOR

C21

STAFF OFFICES

R2

CAP

DOWN FROM ROOF TO LIGHTNING

ARRESTORS BELOW ON 2ND FLOOR.

LOCATION TBD.

R4

R4

R4

R4

R4

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:43:45 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

SECOND FLOOR POWER PLAN

02-EP.102

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 3/32" = 1'-0"

SECOND FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA

CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 ACTUAL LOCATION OF DONOR ANTENNAS ON ROOF TO BE FIELD VERIFIED. SHOWN HERE

ON DRAWING FOR PURPOSES FOR EACH DONOR RUN OF 100'. DIRECTION IN WHICH DONOR

ANTENNAS POINT TBD.

R3 PROVIDE 12 STRAND, SINGLE MODE, ARMORED CABLE TO EACH BUILDING LISTED:

5, 7, 14, 22, 27, 39, 82, 83 AND 84.

COORDINATE WITH COR TO ROUTE CABLE IN EXISTING PATHWAYS ON CAMPUS.

R4 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

All new equipment shall match.

A

SP

RI

SPA

A

SP

STORAGE

MAIN

REFRIGERATION

TRANSFORMER

ROOM

004A

STORAGE

XXX

STAIR

S4

CORRIDOR

C01

CORRIDOR

XXX

CRAWL SPACE

XXX

TANK ROOM

XXX

CORRIDOR

005E

PIPE TUNNEL

XXX

AREA WELL

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

CRAWL SPACE

XXX

STAIR

S3

ELEV

R3

R3

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:56:30 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

BASEMENT POWER PLAN

05-EP.100

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

BASEMENT POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA

CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPICITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE BACK TO MAIN EQUIPMENT

RACK IN BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2. REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

DN

DN

DN

SP

A

RI

A

A

A SP

A

RI

RETAIL STORE

100A

STORAGE

100B

FOOD COURT

100C

TOILET

100D STORAGE

100F

H.A.C.

100G

STAIR

S2

OFFICE

100H

OFFICE

100I

PATIENT DINING

CORRIDOR

C11

CORRIDOR

C12

COOKING/ FOOD

PREP

SUPERVISOR

101A

CORRIDOR

C13

CORRIDOR

C14

CORRIDOR

C15

WOMENS TOILET

LOCKERS

102A

DINING ROOM

103K

CLINICAL SECTION

CHIEF

103B

SECRETARY

103C

CHIEF

103D

ELEV

STAIR

S3

SUPERVISORS

FEC

101B

REFRIGERATOR

101C

DISH ROOM

101E

REFRIGERATOR

CLERKS

H.A.C.

INGREDIENT

CONTROL/ PANTRY

108A

TOILET

106A

EQUIPMENT

CLEANING

REFRIGERATOR

SOILED LINEN

FOOD TRAY

ASSEMBLY

REFRIGERATOR

STORAGE

REFRIGERATOR

119B

REFRIGERATOR

119C

CORRIDOR

C16

CORRIDOR

C17

CORRIDOR

C18

RECEIVING

FREEZER

116A

CART WASH

PAPER STORAGE

112A

PAPER STORAGE

112B

MECHANICAL

113E

MENS TOILET

DATA

100E

STORAGE

100J

FEC

103A

GROUP OFFICE

103H

REFRIGERATOR

101D

STAIR

S1

CORRIDOR

C12A

NOURISHMENT

101B

CORRIDOR

103E

CLOSET

103F

TEMP KITCHEN

103G

SERVING

100L

LOADING DOCK

101F

STAIR

S4

OFFICE

100J

CAPR1

R2

R3

R3

R3

R3

R3

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:56:33 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

FIRST FLOOR POWER PLAN

05-EP.101

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN

KEY PLAN

POWER KEYED NOTES

R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA

CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPICITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE BACK TO MAIN EQUIPMENT

RACK IN BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2. REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

RI SP

OFFICE

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

WOMENS TOILET

FEC

MENS TOILET

MAS OFFICE

CORRIDOR

C21

CLOSET

208A

H.A.C.

OFFICE

OFFICE

OFFICE

OFFICE

BREAKROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

H.A.C.

CORRIDOR

C22

STAIR

S1

STAIR

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:56:34 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

SECOND FLOOR POWER PLAN

05-EP.102

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT FIBER HUB, ACTIVE DAS EQUIPMENT, AND REMOTE HUB UNIT IN EXISTING DATA

CLOSET. CONNECT TO EXISTING 120V CIRCUIT WITH AVAILABLE CAPICITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE BACK TO MAIN EQUIPMENT

RACK IN BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2. REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

SP

A A

A

STAIR

S4

STAIR

S3

STAIR

S2

STAIR

S5-0B

STAIR

S1-0B

STORAGE

STORAGE

STORAGE

BEHAVIORAL

HEALTH,

MESSENGER POOL

STAFF AREA

STORAGE

003A OFFICE

005A

OFFICE

005B

OFFICE

005C

ELEC

006E

ELEC

B38

MECH

STORAGE

STAIR

S6

H.A.C.

008A

STORAGE

009A

STORAGE

009B

MECH

009D

TOILET

CHASE

010E H.A.C.

MECH

011EOFFICE

VACANT

STORAGE

VACANT

WOMENS LOCKER

TOILET

016A

ELEC

027E

MORGUE

TOILET

VACANT

VACANT

VACANT

OFFICE

028A

TOILET

028C

STORAGE

028B

STORAGE

H.A.C.

CORRIDOR

C02

STORAGE

CORRIDOR

C05

CORRIDOR

C03

WHEEL CHAIR

REPAIR

CORRIDOR

C04

ELEV

S5

CLOSET

S7

ATRIUM

S8

VESTIBULE

S9

ELEV MACHINE

S10

ELEV

S11

LOBBY

S13

R1

R3

R3

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:59:16 PM

INSTALL 800MHZ REPEATER

FOR SECURITY SERVICE,

VARIOUS BUILDINGS

01.10.2022

BASEMENT POWER PLAN

07-EP.100

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

BASEMENT POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A A

DATA

OFFICE

OFFICE

GROUP

OFFICE

OFFICE

TOILET

OFFICE

OFFICE

INTERVIEW

LOUNGE

GROUP

OFFICE

WORK ROOM

OFFICE

OFFICE

GROUP ROOM

OFFICE

OFFICE

ELEC

169E

LAB

MEDS

TREATMENT

WAITING ROOM

STAIR

S1

TOILET

OFFICE

OFFICE

GROUP

GROUP

OFFICE

CORRIDOR

OFFICE

TRAINING

GROUP

OFFICE

OFFICE

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

STAIR

S2

CORRIDOR

C1-4

CORRIDOR

C1-1

RECEPTION

CORRIDOR

C1-3

OFFICE

CORRIDOR

OFFICE

OFFICE

OFFICE

BIOFEEDBACK

CONTROL

STAFF

TOILET

BIOFEEDBACK LAB

TESTING

131A

CUBICLE

TOILET

OFFICE

ELEV

P-1

H.A.C.

OFFICE

WORK ROOM

OFFICE

TOILET

OFFICE

OFFICE

ELEV

P-2

MECH

102A

LOBBY

ATRIUM

A101

TOILET

ELEC

108E

OFFICE

OFFICE

128OFFICE

OFFICE

WORK

TOILET

OFFICE

COMMUNICATION

CLERICAL

102A

CAP

R1

R2

R3

R3

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:59:19 PM

INSTALL 800MHZ REPEATER

FOR SECURITY SERVICE,

VARIOUS BUILDINGS

01.10.2022

FIRST FLOOR POWER PLAN

07-EP.101

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A

STAIR

S2-02

SHELL SPACE

CHIEF

PSYCHOLOGY

SERVICE

ADMINISTRATIVE

OFFICER

3 BED ROOM

ELEC

MAIL

STAFF LOUNGE

INTERVIEW ROOM

TOILET

207A

STAIR

S1-02

CORRIDOR

H.A.C.

ELEC

209E

CLERICAL

OFFICE

SOCIAL WORK

SUPERVISOR

OFFICE

215 CHIEF PSYCHIATRY

SERVICE

SHELL SPACE

TOILET

CORRIDOR

C21

OFFICE

MENTAL HEALTH

SECTION

SUPERVISOR

WORKROOM

EDUCATION

SECRETARY

CHIEF SOCIAL

WORK SERVICE

CORRIDOR

COMMUNITY

HEALTH NURSING

TOILET

TOILET

H.A.C.

200A

ELEV

P202

LOBBY

CONFERENCE

ROOM

CONFERENCE

ROOM

STORAGE

MENTAL HEALTH

SERVICE

SUICIDE

PREVENTION

COORDINATOR

SUICIDE

PREVENTATION

CASE MANAGER

WORK ROOM

CHIEF MENTAL

HEALTH SERVICE

SECRETARY

PSYCHOLOGY

RECOVERY

COORDINATOR

CHIEF MENTAL

HEALTH NURSE

CORRIDOR

C2-1

ELEV

P201

R3

R3

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 2:59:21 PM

INSTALL 800MHZ REPEATER

FOR SECURITY SERVICE,

VARIOUS BUILDINGS

01.10.2022

SECOND FLOOR POWER PLAN

07-EP.102

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A AASP

STORAGE

CORRIDOR

C01

CONFERENCE

ROOM

SOILED LINEN

VENDING

VACANT

OFFICE

WAITING

007A

TRANSFORMER

ROOM

008E

DATA

005A

KITCHEN

009A

STORAGE

009B

OFFICE

009C

OFFICE

009D

SOCIAL WORK

OFFICE

009F

OFFICE

009G

CONFERENCE

009H

OFFICE

009I

OFFICE

009J

CONFERENCE

009K

STAIR

S1

TOILET STAFF

CHASE

010E

MENS TOILET

STORAGE

STORAGE

OFFICE

OFFICE

WOMENS TOILET

CORRIDOR

C03

CORRIDOR

C02

CHASE

015E

CHASE

016E

SHOWER ROOM

016A

STAIR

S2 MECH

S01E

OFFICE

OFFICE

CONFERENCE

PRINTING

H.A.C.

Room

019A Room

019B

BREAK ROOM

017A

OFFICE

017B

OFFICE

017C

OFFICE

017D

MECH

017E

OFFICE

017F

OFFICE

017G

OFFICE

017H

OFFICE

017I

OFFICE

017J

OFFICE

017K

OFFICE

017L

OFFICE

017M

RECEPTION

CORRIDOR

A

MECH

007J

OFFICE

007B

OFFICE

007C

CONFERENCE

ROOM

007D

OFFICE

007E

OFFICE

007F

OFFICE

007G

OFFICE

007H

ELEV

S3

R3 R3

R3

CABLE TO

FLOOR ABOVE

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:03:20 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

BASEMENT POWER PLAN

14-EP.100

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

BASEMENT POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A AA

CORRIDOR

C11

TOILET

WAITING

OFFICE

CLEAN LINEN

SOILED LINEN

CMS

1 BED

CORRIDOR

1 BED

1 BED

109 BREAKROOM

2 BED

3 BED

4 BED

1 BED

LAUNDRY

H.A.C.

SHOWERS

115A

MENS TOILET

CHASE

117E

1 BED

CORRIDOR

C13

1 BED

2 BED

121A

DAY ROOM

121B

2 BED

121C

BREAKROOM

CONFERENCE

H.A.C.

1 BED

1 BED

MED

RECEPTION

STAIR

S1

CORRIDOR

C12

BEDROOM

CORRIDOR

C15

CORRIDOR

C14

BEDROOM

130A

TOILET

BEDROOM

BREAKROOM

TOILET

STORAGE

STORAGE

OFFICE

OFFICE

OFFICE

H.A.C.

OFFICE

OFFICE

142A

DAY ROOM

142B

PORCH

142C

OFFICE

142D

KITCHEN

MENS TOILET

CHASE

145E

H.A.C.

SHOWER

QUIET ROOM

148A

CORRIDOR

C17

CONFERENCE

148B

RECREATION

148C

1 BED

148D

BEDROOM

148F

EXAM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

C16

STAIR

S2

TOILET

101A

DIRTY LINEN

115A

CORRIDOR

CORRIDOR

B

CHASE

135E

CORRIDOR

CHASE

143E

SHOWER

147A

CORRIDOR

D

CAP

R1

R2

R3

R3

R3R3

CABLE TO

FLOOR

BELOW AND

ABOVE

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:03:23 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

FIRST FLOOR POWER PLAN

14-EP.101

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

AA A

CORRIDOR

C21

FAMILY WAITING

201 OFFICE

LINEN

SOILED LINEN

1 BED

1 BED

ANTEROOM

1 BED

1 BED

QUIET ROOM

2 BED

3 BED

3 BED

1 BED

SHOWER

H.A.C.

CHASE

217E

CHUTE

CORRIDOR

C24

CORRIDOR

C23

TOILET

3 BEDS

2 BEDS

4 BEDROOM

2 BEDS

3 BEDS

H.A.C.

1 BED

1 BED

MED

STATION

BEDROOM

BEDROOM

WOMENS LOUNGE

TOILET

STAFF BREAK

TOILET

STORAGE

235STORAGE

OFFICE

EXAM

OFFICE

239H.A.C.

OFFICE

DAYROOM

CORRIDOR

C25

CORRIDOR

C26

CORRIDOR

C22

CORRIDOR

C27

PORCH

242A

STAIR

S2-02

CORRIDOR

C28

LAUNDRY

MENS TOILET

CHASE

245E

STORAGE

CONFERENCE

GROUP ROOM

248A

GROUP ROOM

248C

GROUP ROOM

248B

INTERVIEW OFFICE

CORRIDOR

C29

OFFICE

OFFICE

NURSING

NURSING

NURSING

TOILET

254A

STAIR

S1

TOILET

CHASE

219E

CHASE

235E

CHASE

243E

VENDING

246A

CORRIDOR

TOILET

207A

CABLE TO

FLOOR BELOW

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:03:25 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

SECOND FLOOR POWER PLAN

14-EP.102

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

ELEC

B24

STORAGE

B22

MECHANICAL

B21

STORAGE

B20

EXISTING

BASEMENT

STAIRS

S2

CABLE TO

FLOOR ABOVE

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:05:29 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

BASEMENT POWER PLAN

22-EP.100

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

BASEMENT POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A

A

CORRIDOR

C101

STAIRS

S1

NURSE OFFICE

STAIRS

S3

STAIRS

S2

PATIENT/EDUCATION/

CONFERENCE

ROOM

EXIST ELEV

LOADING

ELEC

132 STORAGE

TOILET

106A

PORCH

P11

DOMICILARY

MANAGER OFFICE

PHYSICIAN OFFICE

CLERICAL OFFICE

COUNSELOR

OFFICE

COPY/MAIL/SPD

SUPPLIES

ELEC

144E

STAFF LOUNGE

OFFICE

SOCIAL WORK

OFFICE

SOCIAL WORK

OFFICE

SOCIAL WORK

OFFICE

STAFF TOILET

STAFF TOILET

ELEV MACHINE RM

PATIENT/EDUCATION/

GROUP ROOM

VENDING

H.A.C.

SPD SUPPLY

STORAGE PATIENT

CLOTHING

WAITING

PRIVATE ROOM

VESTIBULE

C107

TOILET

100A

STORAGE

NURSE STATION

EXAM ROOM

TOILET

125A

SELF MEDS

ELEC

123E

CLOSET

EQUIPMENT

STORAGE

TOILET

107A

PRIVATE ROOM

PRIVATE ROOM

PRIVATE ROOM

TOILET

105A TOILET

104A

PRIVATE ROOM

SCHEDULER/

INTERVIEW OFFICE

CONSULT/ LOUNGE

SEMI-PRIVATE

ROOM

TOILET

103A

TOILET

102A

SEMI-PRIVATE

ROOM

CLOSET

114A

SEMI-PRIVATE

ROOM

PRIVATE ROOM

TOILET

112A

TOILET

111A

PRIVATE ROOM

SEMI-PRIVATE

ROOM

TOILET

110A

COMPUTER/

PATIENT LOUNGE

TOILET

113A

PANTRY

MED ROOM

TOILET

HAC

SOILED LINEN

CLEAN LINEN

TOILET

LAUNDRY

CORRIDOR

C102

CORRIDOR

C103

CORRIDOR

C104

ELEV

C24

CAP

R1

R2

R3

R3

R3

R3

CABLE TO

FLOOR ABOVE

CABLE TO

FLOOR BELOW

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:05:32 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

FIRST FLOOR POWER PLAN

22-EP.101

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

SEMI-PRIVATE

ROOM

BATH

207A

SEMI-PRIVATE

ROOM

BATH

208A

PRIVATE ROOM

BATH

209A

ELECT

210E

CLEAN LINEN

STORAGE

SOILED LINEN

BATH

214A

BF PRIVATE ROOM

PATIENT LOUNGE

TOILET

WOMEN'S LOUNGE

SEMI-PRIVATE

ROOM

PANTRY

BATH

205A

STAIRS

S1

PRIVATE ROOM

BATH

203A

BATH

202A

SEMI-PRIVATE

ROOM

BATH

201A

PRIVATE ROOM

DATA

MONUMENTAL

STAIRS 3

S3

COORIDOR C2-2

C202

CORRIDOR

C20

PRIVATE ROOM

BATH

219A

SEMI-PRIVATE

ROOM

BATH

222A

SEMI-PRIVATE

ROOM

BF PRIVATE ROOM

MECH

BATH

223A

SEMI-PRIVATE

ROOM

H.A.C.

BATH

224A

STAIRS 2

S2

SEMI-PRIVATE

ROOM

BATH

227A

BATH

226A

SEMI-PRIVATE

ROOM

BATH

228A

BF PRIVATE ROOM

NURSE STATION

CORRIDOR

C23

BATH

220A

OFFICE

ELEVATOR P-1

P201

ELEC

221E

MECH

201M

EXERCISE ROOM

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:05:33 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

SECOND FLOOR POWER PLAN

22-EP.102

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

SECOND FLOOR POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A

ELECTRIC

115E

OFFICE

MALE LOCKER

ROOM

OFFICE

CLOSET

117A

LOBBY

OFFICE

CORRIDOR

C12

KITCHEN

MENS TOILET

WOMENS TOILET

STORAGE

H.A.C.

HOLDING CELL

ARMORY

109A

EVIDENCE

OFFICE

CORRIDOR

C11

OFFICE

103INTERVIEW ROOM

102A

TRAINING

VESTIBULE

OFFICE

100G

OFFICE

100H

CORRIDOR

C13A

OFFICE

100I

OFFICE

100F

OFFICE

100C

OFFICE

100B

BREAK ROOM

100J

OFFICE

100A

OFFICE

100K

ELECTRIC

WORKSHOP

LOADING DOCK

OFFICE

100D

CLOSET

100G1

CAP

R1

R2

R3

R3

R3

Room

Room

002A

Room

Room

001A

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:08:03 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

FLOOR POWER PLANS

27-EP.101

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN

KEY PLAN

SCALE: 1/8" = 1'-0"

BASEMENT POWER PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EQUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

AA

A SP

SP

HAC

STORAGE

WOMENS TOILET

OFFICE

AREA

MAINTAINENCE

OFFICE

COMPUTER REPAIR

SHOP

OFFICE

006A

CLOSET

006B

STORAGE

007B

TOILET

007C

CORRIDOR

C01

CORRIDOR

C-0

VESTIBULE

011A

CORRIDOR

008B

FOOD

PREP(COOK/CHILL)

008A

THERAPY

STAIR

S2-0B

STAIR

S3

STORAGE

UNISEX TOILET

MECHANICAL

STORAGE

009A

BARBER/BEAUTY

SHOP

STORAGE

012A

STORAGE

012B

STAIR

S5

CORRIDOR

C02

CORRIDOR

C03

ELECTRICAL

013E

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

OFFICE

OFFICE

UNISEX TOILET

OFFICE

CLEAN LINEN

ENVIROMENTAL

MANAGEMENT

STORAGE

STORAGE

033OFFICE

STAIR

S6-0B

CORRIDOR

C04

CORRIDOR

C05

CORRIDOR

BC-01

CORRIDOR

BC-02

CORRIDOR

BC-03

CORRIDOR

BC-04

CORRIDOR

BC-05

RECEIVING

BC-06

STAIR

BS2

ELEVATOR

B1

ELEVATOR

EQUIPMENT

B001

SOILED LINEN

B002

STORAGE

B003

H.A.C

B004

DATA

B005

STORAGE

B006

MECHANICAL

B010

STORAGE

B020

ELECTRICAL

B030

MECHANICAL

B040

STAIR

BS1

ELEVATOR

S7

CAP

R1

R2

R3 R3

R3

R3

R3

VA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved: VA CHIEF ENGINEER

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

STAMP

CONSULTANT

321 4 5 6 7 8 9 10

FOR CONSTRUCTION

1/10/2022 3:09:38 PM

INSTALL 800MHZ REPEATER

FOR SECURITY, VARIOUS

BUILDINGS

01.10.2022

BASEMENT POWER PLAN

39-EP.100

MMRSET

515-21-202

Battle Creek, Michigan (515)

VA Station No:

100% CONSTRUCTION

DESIGN

SCALE: 3/32" = 1'-0"

BASEMENT POWER PLAN

KEY PLAN

POWER GENERAL NOTES

1. ALL RECEPTACLES ON EXTERIOR, IN KITCHEN, IN CONCESSION, IN LABORATORY, AND

WITHIN 6'-0" OF SINK OR OTHER WATER SUPPLY SHALL BE READILY ACCESSIBLE GFCI TYPE

RECEPTACLE.

2. REFER TO ARCHITECTURAL FLOOR PLANS AND ELEVATIONS TO VERIFY LOCATION OF

DEVICES.

3. ALL CONDUITS SERVING 120 VOLTS OR GREATER SHALL INCLUDE A GROUND WIRE.

4. ALL CONDUITS SHALL BE ROUTED CONCEALED UNLESS NOTED OTHERWISE.

5. ALL 120 VOLT CIRCUITS SHALL UTILIZE A SEPARATE NEUTRAL.

6. ALL NEW DISTRIBUTED ANTENNA SYSTEM COMPONENTS SHALL BE CONNECTED TO

EMERGENCY POWER OR PROVIDE WITH BACKUP TO PROVIDE 24 HOURS OF POWER IN THE

EVENT OF LOSS OF NORMAL POWER.

POWER KEYED NOTES

R1 MOUNT DAS EQUIPMENT AND REMOTE HUB UNIT IN EXISTING DATA CLOSET. CONNECT TO

EXISTING 120V CIRCUIT WITH AVAILABLE CAPACITY IN ROOM.

R2 PROVIDE 12 STRAND, SINGLE MODE, FIBER ARMORED CABLE TO MAIN EUIPMENT RACK IN

BUILDING 2.

R3 REMOVE AND REINSTALL ANY WALL OR CEILING MOUNTED DEVICES THAT ARE IMPACTED

BY THIS WORK. THIS INCLUDES BUT IS NOT LIMITED TO LIGHT FIXTURES, SPEAKERS,

SECURITY CAMERAS, OCCUPANCY SENSORS, ETC.

ELECTRICAL DEMOLITION NOTES

1. VISIT THE SITE PRIOR TO SUBMISSION OF BID TO EXAMINE THE EXISTING CONDITIONS AND

THE EXTENT OF DEMOLITION WORK.

2 REMOVE ANY EXISTING EMERGENCY RESPONDER DISTRIBUTED ANTENNA SYSTEM (DAS)

COMPONENTS FROM THE BUILDING AND REPLACE WITH NEW.

BCVAMC uses 741MHz frequency.

A SP

A A

A

RI

SP A

BED

EXAM

BED

BED

LAUNDRY

104A

CLEAN UTILITY

104 BED

103A

DAY ROOM

GROUP ROOM

105A

CORRIDOR

C-21

NOURISHMENT

105E

MEDS

107A

TOILET

107D

STAFF ROOM

QUIET ROOM

MENS TOILET

SHOWER

TOILET

BEDROOM

BEDROOM

BEDROOM

BEDROOM

H.A.C.

108A

NURSE STATION

C24A

CORRIDOR

C14

CORRIDOR

C15

CORRIDOR

C13

STAIR

S3

SOILED UTILITY

BED

BED

BED

LOCKERS

OFFICE

OFFICE

BREAK ROOM

CONFERENCE

VISITORS ROOM

OFFICE

OFFICE

BED

BATH

STAIR

S5-01

EXAM

SOILED UTILITY

CORRIDOR

C12

CORRIDOR

C16

CORRIDOR

C17

CORRIDOR

C18

STAIR

S6-01

BED

BED

BED

MENS TOILET

H.A.C.

SHOWER

138B

OFFICE

137A TOILET

139B

STAFF ROOM

CORRIDOR

C19

NURSE STATION

C18A

MEDS

139A

DAY ROOM

CORRIDOR

C20

GROUP ROOM

141A

NOURISHMENT

141B

LAUNDRY

142A

CLEAN UTILITY

142B

BED

143A

BED

143B BEDROOM

BED

OFFICE

STORAGE

144A

CORRIDOR

C11

STAIR

S4-01

ELEVATOR

CORRIDOR

BC-11

CORRIDOR

BC-12

CORRIDOR

BC-13

CORRIDOR

BC-14

CORRIDOR

BC-15.2

CORRIDOR

BC-16

CORRIDOR

BC-17.2

CORRIDOR

BC-4

CORRIDOR

BC-17.1

CORRIDOR

BC-15.1

ELEVATOR

B1-1

UNIT EQUIPMENT

B101

SOILED LINEN

B102

H.A.C.

B104

CLEAN LINEN

B105

TREATMENT

B106

OFFICE

B107

OFFICE

B108

OFFICE

B109

OFFICE

B110

STAFF OFFICE

B111

OFFICE

B112

NURSE STATION

B113

GROUP ROOM

B114

STORAGE

B113A

STORAGE

B118A

MEDS

B120

TOILET

B121

SECLUSION

B122

SEMI

B123

ANTEROOM

B124

SEMI

B125

ISOLATION

B126

SEMI

B127

PRIV…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .