Performance Work Statement For
Pacific Based Civil Support Teams (CST) FY2018 Culminating Training Events (CTE), Task
Proficiency Evaluations (TPE), and Field Training Exercise (FTX)
1.0 Objective: The objective of the task is to assist and execute a Culminating Training
Event (CTE) and a Task Proficiency Evaluation (TPE), full scale, Chemical/Biological/Radiological Weapons of Mass Destruction Field Training Exercise in FY 2018 for the Pacific-based Civil Support Teams in the following locations and dates:
- 94th CST (GU) CTE Guam (Barrigada, Hagatña, and Yigo) 26FEB18 – 02MAR18
- 94th CST (GU) TPE Guam (Barrigada, Hagatña, and Yigo) 12-16MAR18
- 103rd CST (AK) FTX Sitka, Alaska 07-11MAY18
These exercises shall create an environment to facilitate the accurate assessment of the twelve National Guard Mission Essential Tasks outlined in the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated May 09.
2.0 Specific Tasks: The contractor shall provide the necessary, personnel, labor, materials, supplies, and equipment as indicated below to perform the tasks outlined:
2.1 Scenario Development-The series of exercises shall not only measure the training and readiness level of the team in accordance with DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks, but will also reinforce interoperability, communications, and aid in the development of standard operating guidelines (SOGs). The scenarios must include at least one (1) elaborate Chemical, Biological, and Home-Made Explosives clandestine laboratories or processes. Each laboratory shall include more than 2 phase/step processes. In addition, contractors must incorporate at least one (1) elaborate and realistic Radiological scenarios. Contractors must utilize controlled Isotopes that will test radiological detection equipment beyond training check/button sources. Contractor shall facilitate and coordinate US approved radiological hazards IAW CFR requirements. All scenarios must be designed to aid in the identification of possible team shortcomings and weak areas, and to re-train those areas as necessary. They must also provide an environment ready for on-the-fly injects as necessary to ensure all of the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks are completed to standard. Should any weak areas be found, the scenarios should provide for immediate re-training in those areas. The scenarios must provide the complexity and realism to represent an actual Weapons of Mass Destruction (WMD) event. Contractor shall provide realistic training aids, devices, and simulations that properly simulate current CST detection and analytical equipment enabling the CST to make sophisticated assessments and decisions. Realism and technical exactitude are crucial for all training aids, devices, simulators, and locations. The contractor must also create scenarios that will incorporate the current emerging threats we face domestically and/or from overseas. The full scenarios should each provide for one complete and continuous demanding day of training not to exceed 24 hours.
2.2 Scenario Staffing- The contractor shall provide experienced and certified staff to create target sites that replicate elaborate chemical and biological laboratory production, radiological and explosives manufacturing labs, and act as role players in the scenario. The minimal roles include Incident Commander (IC), FBI or local law enforcement, Explosives Ordnance Disposal (EOD), Safety Officer, Staging Officer, Medical reach-back, and a planner to attend the mid-planning IPR. All staff must have a full understanding of the Incident Command System (ICS) and their role in WMD events. Since staff shall be playing the roles of trained Hazardous Materials (HAZMAT) professionals and reacting to the decisions of the CST, they must be fully trained and possess at least 10 years of experience in HAZMAT operations to the level of “Technician” in accordance with National Fire Protection Association (NFPA) 472. As these exercises are to assist in SOG construction and implementation, as well as reinforce Training and Evaluation Tasks enforced at a national certification level, prior contactor participation in at least three (3) national level training exercises to include having executed at least (5) CST External Evaluations (EXEVAL) is vital to plenary understanding of the training requirements. All staff must be well versed in CST Operations and all governing regulations to supplement the training and reinforcement of standard CST operating principals during the exercise. The contractor shall possess at least three certified Emergency Medical Technicians (EMT). Contractor shall establish a “Simulation Cell” of technical/subject matter experts to facilitate/adjudicate the synchronization and facilitation of all exercises as required. Contractor staff shall also possess basic skills in electrical, plumbing, and carpentry for target site adjustments (see 3.1 and 3.2 below).
3.0 Place of Performance. The contractor shall be responsible for acquiring and identifying adequate/appropriate target training venues to support each event. All target venues identified shall be vetted through the Exercise Director prior to final selection. The contractor ensures locations/buildings meet the requirements for target location, vehicle footprint, communications equipment, egress, and functioning utilities (electricity, water supply) in accordance with the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated, FM 3-11.22, and unit Standard Operating Guidelines (SOG).
3.1 Target Site. The contractor shall acquire and prepare all target venues as necessary to enhance the realism of the scenarios. Role players with the proper casualty simulation makeup may be necessary in some or all exercises.
Contractor must possess the ability to transport hazardous materials which require warning placards, or contract for said service. The contractor shall possess the skill set required to perform basic plumbing, carpentry, paint and finish, and electrical work (not requiring permit) to adequately prepare target buildings or, must be able to obtain such services as necessary to insure a realistic training environment. All furniture, decorations, props and chemical toilets/porta-potties (with servicing) shall also be provided by the contractor.
3.2 Site Adjustments. Any necessary adjustments to the site (to include building construction, inoperable vehicle placement, demolition, fabrications) shall be made by the contractor. This may include the use of heavy and or specialized equipment that the contractor may sub-contract if unable to perform this function with onsite staff. On average, contractor shall be required to improve/modify a minimum of (2) abandoned structures acquired for each exercise. The buildings range from approximately 500 – 2000 sq ft in size and are generally at 25%- 100% disrepair. Moderate to elaborate construction within the buildings shall/may be required, such as: secret room construction, false walls, doors and windows installation, repair or removal. All modifications required shall be driven based on the scenario. Minor changes not requiring monetary adjustment to the contract may be negotiated by the COTR or individual designated by the Contracting Officer (KO). The KO must negotiate any changes requiring increased expense to the contractor. At the conclusion of the exercise, the contractor shall return the site to its previous state. All clean-up shall be done by the contractor.
4.0 Period of Performance. On average, it is estimated that eleven (11) working days shall be needed to complete the tasks with seven (7) days for preparation of suitable chemical, biological, radiological, and explosives labs, two (2) days for execution, and two (2) days for clean-up.
5.0 Reporting Requirements and Deliverables: Contractor shall provide the following deliverables:
5.1 Refined Scenario Summary. The contractor shall provide copies of refined scenario summaries for each exercise to 196th IN BDE CST/CERFP Training and Readiness Division no later than 10 days prior to each exercise execution.
5.2 Master Scenario Events List (MSEL). The contractor shall provide the 196th IN BDE CST/CERFP Training and Readiness Division a draft of the MSEL no later than 3 days prior to exercises execution. As revisions are made, updated copies will be provided to the 196th IN BDE CST/CERFP Training and Readiness Division.
5.3 After Actions Review (AAR). The contractor shall provide a detailed after actions review of the exercise to include any deficiencies noted as they pertain to the DTMS CATS WMD-CST Mission Essential Tasks and/or SOG within 7 days after execution. Any major deficiencies shall be noted and provided immediately the day after execution.
5.4 Task Deliverable Schedule Table.
Deliverable Req. Ref. Due Date
Exercise Scenario Summary
5.1
10 days prior to exercise execution
MSEL
5.2
3 days prior to exercise execution
AAR
5.3
1 day for major deficiencies, 7 days for detailed AAR presentation
6.0 Government Furnished Information/Equipment. The Government will provide all training facilities/classrooms required outside of the scenario at no cost to the contractor.
7.0 Contractor Manpower Reporting Statement. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address "https://contractormanpower.army.pentagon.mil”. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including sub-contractor); (6) Estimated direct labor dollars paid this reporting period (including sub-contractor); (7) Total payments (including subcontractor); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different); (9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information); (10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website); (11) Presence of deployment or contingency contract language, and, (12) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.
8.0 Special Provisions
8.1 Quality Control. A representative from the 196th IN BDE CST/CERFP Training and Readiness Division will oversee conduct of training and skills test to ensure effective and appropriate training is being conducted.
8.2 Performance Assessment. The WMD-CST teams participating must be accurately assessed based on the twelve National Guard Mission Essential Tasks outlined in the DTMS Combined Armed Training Strategy (CATS) Civil Support Team Mission Essential Tasks dated May 09, requiring the contractor to assemble a realistic and appropriate environment as well as an effective scenario development and facilitation method.
8.3 Hours of Operation: Normal Duty Hours. It is estimated that the average preparation will take no less than the equivalent of seven (7) eight (8) hour workdays using 5-6 staff. Depending on the exercise script and the venue, up to 12-hour days may be necessary. The contractors shall accomplish the preparation in a timely fashion and facilitate each exercise for no more than 36 continuous hours.
8.4 Contractor Employees. The contractor shall determine the suitable number of staff needed to prepare all target sites and facilitate the 36-hour exercises.
8.5 Special Qualifications. The contractors must have qualifications that enable them to construct plausible, realistic WMD target site(s) and assess teams in accordance with DTMS CST CATS Tasks. (see 2.0, 2.1, and 2.2 above)
8.6 Security Requirements. Contractor personnel shall not be required to obtain security clearances. However, all personnel involved must have a valid driver’s license in order to obtain a military installation pass or to be signed on by a Government employee member.
8.7 Identification of Employees. Identification of Employees shall be at the discretion of the contractor.
8.8 Utilities. N/A.
10.0 Applicable Documents. N/A.