Exhibit_D-DB_Cost_Breakdown_CST_W91ZRS-16-R-0001.docx
DOCX document 42 KB Posted
- Attached to
- CST Ready Building - Design Build Federal contract opportunity
- Solicitation number
- W91ZRS-16-R-0001
About this file
Exhibit D - Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16-R-0001-0002.pdf | ||
| CTARNG_CST-RB_Bidders_Q-A_5_Jul_16.pdf | ||
| 6.01_Building_Life_Cycle_Analysis_Factors_160628b_.pdf | ||
| CTARNG_CST-RB_Bidders_Q-A_23JUN16.pdf | ||
| Sol_Phase2_W91ZRS-16-R-0001-Amendment-0001_20160603.pdf | ||
| Sol_Phase2_W91ZRS-16-R-0001-Amendment-0001_ConformedDoc_20160603.pdf | ||
| EXHIBIT_E-_DB_CTR_Proposed_Alternates-Betterments-Deviations.docx | DOCX document | |
| Q A_20160420.docx | DOCX document | |
| Q A_20160411.docx | DOCX document | |
| CST_EXHIBIT_A.docx | DOCX document | |
| W91ZRS-16-R-0001_CST_SOL_5APR2016.pdf | ||
| CST_EXHIBIT_C.docx | DOCX document | |
| CST_EXHIBIT_F_Pre_Proposal_Inquiry_Form.docx | DOCX document | |
| CST_EXHIBIT_B.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit D COST BREAKDOWN
SUBMITTED IN RESPONSE TO
W91ZRS-16-R-0001-CST DB - PHASE TWO
1. Distribute indirect costs to each applicable item shown on this sheet (i.e., don't load only one item). Show "field" or "job" overhead (non-home office or non-"G&A ") under "all other."
2. For each work category which is key subcontracted: identify planned subcontracted amount
3. For other than key subcontracted work items: list total amount of subcontracts) and amount of work to be self-performed, if any.
4. Category totals and sum of all work category totals must match bid item totals.
5. The government reserves the right to obtain additional cost clarification (details), if necessary, to adequately evaluate proposed prices.
6. This information can be provided in a word or excel type document. Offerers shall ensure all information required below is provided and is responsible for the validity of all information regardless of format.
TOTAL OF ALL LINE ITEMS TO INCLUDE BETTERMENTS INCLUDED IN PRICE THAT MEETS COST OBJECTIVE
| Work Category |
| Subcontract |
| Prime |
| Subtotal |
| Total |
| ADJUST FOR YOUR ELEMENTS |
| Cost |
| Self |
| Sub & Prime |
| Cost |
| To Prime |
| Cost |
| Job Cost |
DESIGN
1. Design
2. Commissioning
3. LEED
3. All other costs associated with design to include OH/Permitting etc.
CONSTRUCTION
Element A SUBSTRUCTURE
Element B SHELL
Element C INTERIORS
D10 – Conveying
D20 – Plumbing
D30 – HVAC
D40 - Fire protection
D50 – Electrical
D60 – Communications
D70 – ESS
Element E EQUIPMENT AND FURNISHINGS
Element F SPECIAL CONSTRUCTION
AND DEMOLITION
Element G SITEWORK
All other costs associated with Construction to include OH
TOTALS
File details come from the government source that posted it. Updated .