CTARNG_CST-RB_Bidders_Q-A_23JUN16.pdf

PDF 34 KB Posted

Attached to
CST Ready Building - Design Build Federal contract opportunity
Solicitation number
W91ZRS-16-R-0001
Issued by
Department of the Army Connecticut Army National Guard

About this file

RFI- Answers 23JUN16

View the file

Other files for this federal contract opportunity

Other files attached to CST Ready Building - Design Build, newest first.
File Type Posted
16-R-0001-0002.pdf PDF
CTARNG_CST-RB_Bidders_Q-A_5_Jul_16.pdf PDF
6.01_Building_Life_Cycle_Analysis_Factors_160628b_.pdf PDF
EXHIBIT_E-_DB_CTR_Proposed_Alternates-Betterments-Deviations.docx DOCX document
Sol_Phase2_W91ZRS-16-R-0001-Amendment-0001_20160603.pdf PDF
Exhibit_D-DB_Cost_Breakdown_CST_W91ZRS-16-R-0001.docx DOCX document
Sol_Phase2_W91ZRS-16-R-0001-Amendment-0001_ConformedDoc_20160603.pdf PDF
Q A_20160420.docx DOCX document
Q A_20160411.docx DOCX document
CST_EXHIBIT_F_Pre_Proposal_Inquiry_Form.docx DOCX document
CST_EXHIBIT_B.docx DOCX document
CST_EXHIBIT_A.docx DOCX document
W91ZRS-16-R-0001_CST_SOL_5APR2016.pdf PDF
CST_EXHIBIT_C.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CST-Ready Building

Connecticut Army National Guard

PN 090071

DB-RFP

Bidder's Questions / CTARNG's Answers

6/23/2016

# Question Date Answer

1 Are CAD drawings available for the site? 21-Jun Refer to Part 2 - General Requirements Section 01 30 00.05 20

Para 1.6.

2 Will the Contracting Office hire the Commissioning Agent as stated on pg.67?

21-Jun Yes

3 If a solar hot water system is installed on the roof, will interior roof access be required?(pg.445 – Roof Hatches –not used).

21-Jun No

4 How many and what size above ceiling mounted, motorized projection screens are required? (pg.276)

21-Jun Refer to Part 3, Room Requirement Sheets, Classroom A1

5 What card access system is used at Camp Hartell? (asking for lithium battery operated locksets? – pg.424).

21-Jun Card key access system (electronic; not based on lithium battery locksets) will be government furnished - government installed

EXCEPT contractor shall provide power and pathway(s) (power & communications) as required for each noted Card Key Access location, terminating to the location to be designed for all system equipment. Contractor to coordinate installation of GFGI 'Galaxy

Card Access System' with CTARNG.

6 In the RFP room requirements it mentions “Raised Access Floors” and in the Specific Requirements it States “Betterment”. However as stated in

C103016 (Raised Access Flooring) it does not distinguish whether it is a betterment. Please clarify

22-Jun Engineering Systems Requirements (ESR) and Performance

Technical Specifications (PTS) generally define parameters for proposed Betterments and Options to be incorpoarated into the work should they be selected. ESR's and PTS's do not distinguish between base requirements, betterments and options.

Betterments and Options are indicated through-out Part 3, Chapters 1, 2, 3, 4 and 5. Raised Access Flooring is considered a betterment where indicated in Part 3 Chapter 5 Room

Requirements.

C:\Users\oliver.gagne\Desktop\Site Visit Info\RFI'S\CTARNG_CST-RB_Bidders Q-A 1 of 1