RFI_1_Repair_NDI_Building_P-1.pdf
PDF 410 KB Posted
- Attached to
- CES Repair NDI Building P-1 Federal contract opportunity
- Solicitation number
- W91SMC-18-B-7002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD___IL180004_revised_16_Feb_18.docx.pdf | ||
| Plumb_-_FP.PDF | ||
| Site_Visit_06_Mar_18_Sign-In.pdf | ||
| Site_Visit_Minutes_06_Mar_18.pdf | ||
| SBSA_Pre-Bid_Slides_-_Repair_NDI_P-1.pdf | ||
| Plans_-_Repair_NDI_Bldg_P-1.pdf | ||
| Project_Manual_-_Repair_NDI.pdf | ||
| W91SMC-18-B-7002_-_Solicitation.pdf | ||
| SOW_-_Repair_NDI_DCFT162012.pdf | ||
| SF_1705.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DCFT162012
SOLICITATION/IFB # W91SMC-18-B-7002/REPAIR NDI BUILDING P-1
REQUEST FOR INFORMATION (RFI) #1 21 MAR 2018
Q1. Please provide drawing containing existing sprinkler layout. Reference Drawings 1. Brac
Upgrade F-16 Engine CIRF prepared by Hanson Professional Services, Inc. Dated 6/17/11.
A1. Please see the attached Plumb – FP attachment with this document. It is the contractor’s responsibility to coordinate with the existing site conditions.
Q 2. A subcontractor is stating that the monorail & hoist spec requirement 2.2 (B) (7) LIMIT
SWITCHES, found in specification section 14 51 00 on the top of Page 6, is not able to be met based on the manufacturers listed under 2.1 (B). “The model hoists that are specified under 2.1
(B) do not offer a geared upper and lower limit switch assembly.” Please clarify?
A2. During design, Hanson worked with two (2) hoist manufacturers to ensure the system specified could meet the requirements needed for the space. The limit switch requirement was part of the hoist package recommended by one of the manufacturers, Gorbel: Model Number
94801 GECH-1/2-S-16-SSP-230-10-1-C.
If a geared limit switch is not available, an electric limit switch may be used.
The limit switches prevent the block from being raised too high damaging the hoist itself or being lowered too far allowing the chain to fully unspool from the gearing.
Q3. Specification Section 003126 Part 1.1.C states that hazardous materials have been previously removed. Specification Section 012100 requests that allowances be included for hazardous material abatement. Specification Section 012200 requests unit prices for hazardous material abatement. Specification Section 013543 Parts 3.2 and 3.4 states that asbestos and lead-based paint are included in this project. Please confirm that the abatement allowances are to be carried in our base bid and that the unit prices are required. If unit prices are required, will
Section 00010, Solicitation Contract Form be modified for incorporation of unit prices or should that be submitted on a separate sheet with our proposal?
A3. The allowances are to be carried in the base bid. You may submit unit prices on a separate sheet with your bid for the allowances if you wish.
Q4. Specification Section 013233 states that a professional photographer is required for construction site photographs. Could you please confirm whether this is a requirement of this project? This specification section also mentions a Construction Webcam Service. Could you please confirm whether this is a requirement of this project?
A4. A professional photographer and/or a Webcam Service is not required on this project.
PROJECT DCFT162012
SOLICITATION/IFB # W91SMC-18-B-7002/REPAIR NDI BUILDING P-1
REQUEST FOR INFORMATION (RFI) #1 21 MAR 2018
Q5. Specification Section 017900 states that a professional videographer is required to record demonstration and training video recordings. Could you please confirm that the video recordings are a requirement and that they must be done by a professional videographer?
A5. Recordings are not required for training or demonstrations.
Q6. Specification Section 101400 Part 3.4 SIGN SCHEDULE states that Thirty-five (5) 6 in.
x 3 in. room name and number signs are required. Could you please confirm that 5 signs are required and not 35 signs?
A6. FIVE signs are required.