Project_Manual_-_Repair_NDI.pdf

PDF 10 MB Posted

Attached to
CES Repair NDI Building P-1 Federal contract opportunity
Solicitation number
W91SMC-18-B-7002
Issued by
Department of the Army Illinois Army National Guard

About this file

Specifications without controlled access due to issues.

View the file

Other files for this federal contract opportunity

Other files attached to CES Repair NDI Building P-1, newest first.
File Type Posted
Plumb_-_FP.PDF PDF
RFI_1_Repair_NDI_Building_P-1.pdf PDF
WD___IL180004_revised_16_Feb_18.docx.pdf PDF
SBSA_Pre-Bid_Slides_-_Repair_NDI_P-1.pdf PDF
Site_Visit_06_Mar_18_Sign-In.pdf PDF
Site_Visit_Minutes_06_Mar_18.pdf PDF
Plans_-_Repair_NDI_Bldg_P-1.pdf PDF
W91SMC-18-B-7002_-_Solicitation.pdf PDF
SOW_-_Repair_NDI_DCFT162012.pdf PDF
SF_1705.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared By: On Behalf of:

Hanson Professional Services Inc.

1525 South Sixth Street Springfield, IL 62703

Telephone: 217.788.2450 Fax: 217.788.2503 www.hanson-inc.com

FSB Federal Design Group JV 5801 Broadway Extension Suite 500 Oklahoma City, OK 73118-7436 Telephone: 405.840.2931 www/fsb-ae.com

PROJECT MANUAL

DCFT 162012 Repair NDI Building P-1

Abraham Lincoln Capital Airport, Springfield, IL Contract No. W9113L-16-D-005 - Delivery Order 9E03

Type B-3 (100%) Submission – August 18, 2017

Prepared for:

Illinois Air National Guard – 183D Wing

DCFT #162012 TOC - 1 TOC

Hanson #13D0027001 TABLE OF CONTENTS

TABLE OF CONTENTS

Division Section Title Pages

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

000101 PROJECT TITLE PAGE 1

000107 SEALS PAGE 2

000115 LIST OF DRAWING SHEETS 2

002113 INSTRUCTIONS TO BIDDERS 1

003119 EXISTING CONDITION INFORMATION 1

003126 EXISTING HAZARDOUS MATERIAL INFORMATION 1

003143 PERMIT APPLICATION 1

009113 ADDENDA 3

SPECIFICATIONS GROUP

General Requirements Subgroup

DIVISION 01 - GENERAL REQUIREMENTS

010000 GENERAL REQUIREMENTS 11

SF FORM 1705 1

SF FORM 1706 1

011000 SUMMARY 5

012100 ALLOWANCES 3

012200 UNIT PRICES 2

012500 SUBSTITUTION PROCEDURES 3

012600 CONTRACT MODIFICATION PROCEDURES 2

012900 PAYMENT PROCEDURES 3

013100 PROJECT MANAGEMENT AND COORDINATION 13

013200 CONSTRUCTION PROGRESS DOCUMENTATION 6

AF FORM 3064 2

AF FORM 3065 1

013233 PHOTOGRAPHIC DOCUMENTATION 3

013300 SUBMITTAL PROCEDURES 8

PFOIL 341 FORM 6

PFOIL 341 FORM MATERIAL SUBMITTAL FLOWCHART 1

PFOIL 342 MATERIAL APPROVAL 2

013516 ALTERATION PROJECT PROCEDURES 9

013543 ENVIRONMENTAL PROTECTION 9

014000 QUALITY REQUIREMENTS 10

014200 REFERENCES 8

015000 TEMPORARY FACILITIES AND CONTROLS 9

015639 TEMPORARY TREE AND PLANT PROTECTION 5

016000 PRODUCT REQUIREMENTS 6

017300 EXECUTION 11

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 10

017419a FORMS CWM 1-8 8

017700 CLOSEOUT PROCEDURES 7

DCFT #162012 TOC - 2 TOC

017823 OPERATION AND MAINTENANCE DATA 8

017839 PROJECT RECORD DOCUMENTS 4

017900 DEMONSTRATION AND TRAINING 6

Facility Construction Subgroup

DIVISION 02 - EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION 8

DIVISION 03 - CONCRETE

033000 CAST-IN-PLACE CONCRETE 20

DIVISION 04 - MASONRY

042200 CONCRETE UNIT MASONRY 12

DIVISION 05 - METALS

051200 STRUCTURAL STEEL FRAMING 13

055000 METAL FABRICATIONS 8

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

062023 INTERIOR FINISH CARPENTRY 5

067413 FIBERGLASS REINFORCED GRATINGS 3

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

078413 PENETRATION FIRESTOPPING 6

079200 JOINT SEALANTS 5

DIVISION 08 - OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES 8

081213 HOLLOW METAL FRAMES 6

081416 FLUSH WOOD DOORS 4

087100 DOOR HARDWARE 16

DIVISION 09 - FINISHES

090690 COLOR SCHEDULE 4

092216 NON-STRUCTURAL METAL FRAMING 4

092900 GYPSUM BOARD 5

096723 RESINOUS FLOORING 6

099123 INTERIOR PAINTING 7

DIVISION 10 - SPECIALTIES

101400 SIGNAGE 5

104416 FIRE EXTINGUISHERS 3

DIVISION 11 - EQUIPMENT

111323 FABRIC CURTAIN WALLS 2

DIVISION 14 - CONVEYING EQUIPMENT

145100 OVERHEAD MONORAIL AND HOIST 8

DCFT #162012 TOC - 3 TOC

Facility Services Subgroup

DIVISION 21 - FIRE SUPPRESSION

211313 WET PIPE SPRINKLER SYSTEMS 11

211313.1 FIRE PUMP TEST 2016 2

DIVISION 22 - PLUMBING

220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 3

220518 ESCUTCHEONS FOR PLUMBING PIPING 2

220523.12 BALL VALVES FOR PLUMBING PIPING 6

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 7

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 3

220719 PLUMBING PIPING INSULATION 14

221116 DOMESTIC WATER PIPING 7

221119 DOMESTIC WATER PIPING SPECIALTIES 5

221316 SANITARY WASTE AND VENT PIPING 9

221319 SANITARY WASTE PIPING SPECIALTIES 3

221319.13 SANITARY DRAINS 4

221513 GENERAL-SERVICE COMPRESSED-AIR PIPING 4

224216.16 COMMERCIAL SINKS 5

224500 EMERGENCY PLUMBING FIXTURES 5

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 3

230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 3

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 9

230548 VIBRATION AND SIESMIC CONTROLS FOR HVAC 3

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 4

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 10

230713 DUCT INSULATION 10

230719 HVAC PIPING INSULATION 10

232300 REFRIGERANT PIPING 6

233113 METAL DUCTS 10

233300 AIR DUCT ACCESSORIES 6

233713.23 REGISTERS AND GRILLES 2

238130 VARIABLE REFRIGERANT FLOW SYSTEM 5

DIVISION 26 - ELECTRICAL

260500 COMMON WORK RESULTS FOR ELECTRICAL 6

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 5

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 5

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 4

260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 9

260548 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS 8

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 5

262416 PANELBOARDS 8

262726 WIRING DEVICES 5

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 4

262913 ENCLOSED CONTROLLERS 6

DCFT #162012 TOC - 4 TOC

Site and Infrastructure Subgroup

DIVISION 31 - EARTHWORK

312000 EARTH MOVING 13

DIVISION 32 - EXTERIOR IMPROVEMENTS

323114 LOUVERED FENCE AND GATES 4

END OF TABLE OF CONTENTS

DCFT #162012 000101 - 1 000101

Hanson #13D0027001 PROJECT TITLE PAGE

DOCUMENT 000101 - PROJECT TITLE PAGE

1.1 PROJECT MANUAL VOLUME 1

A. Repair NDI Building P-1

Illinois Air National Guard, 183D Wing

Abraham Lincoln Capital Airport, Springfield, IL

IL ANG Project No. DCFT162012

B. Prepared by: Hanson Professional Services Inc.

1525 South Sixth Street

Springfield, IL 62703

Phone: 217.788.2450

Hanson Project No. 13D0027001

C. Prepared on Behalf of: FSB Federal Design Group JV

5801 Broadway Extension, Suite 500

Oklahoma City, OK 73118-7436

Contract No. W9113L-16-D-005

Delivery Order 9E03

Web Site: www/fsb-ae.com

D. Issued: 18 August 2017 – Type B3 (100%) Submittal

END OF DOCUMENT 000101

END OF DOCUMENT 000107

DCFT #162012

Hanson #13D0027001

000115 - 1 000115

LIST OF DRAWING SHEETS

DOCUMENT 000115 – LIST OF DRAWING SHEETS

1.1 LIST OF DRAWINGS

A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of

Contents page of the separately bound drawing set titled Repair NDI Building P-1, 183D Wing, ILANG, A. Lincoln Capital Airport, Springfield, IL Project DCFT 162012, dated 18 August 2017, as modified by subsequent Addenda and Contract modifications.

B. List of Drawings: Drawings consist of the following Contract Drawings:

GENERAL

G-001 COVER SHEET

ARCHITECTURAL

A-001 ARCHITECTURAL ABBREVIATIONS, TYPICAL ACCESSIBILITY MOUNTING

HEIGHTS & SYMBOLS LEGEND

AE-401 ENLARGED FLOOR PLAN

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-101 FIRST FLOOR PLAN

S-102 HOIST PLAN AND DETAILS

S-103 MECHANICAL PAD PLAN AND DETAILS

PLUMBING

P-101 FIRST & SECOND FLOOR WASTE & VENT NEW WORK PLAN

P-102 FIRST FLOOR DOMESTIC WATER PIPING NEW WORK PLAN

P-103 FIRST FLOOR COMPRESSED AIR DEMOLITION & NEW WORK PLAN

P-104 FIRST FLOOR HVAC CONDENSATE PIPING DEMOLITION & NEW WORK

PLAN

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES, NOTES & SYMBOLS

HEATING

HD-101 FIRST FLOOR & ROOF HEATING DEMOLITION PLAN

H-102 FIRST FLOOR HEATING NEW WORK PLAN

H-501 HEATING SCHEMATIC DIAGRAMS

H-601 HEATING SCHEDULES, SYMBOLS & SEQUENCE OF OPERATIONS

VENTILATION

VD-101 FIRST & SECOND FLOOR VENTILATION DEMOLITION PLAN

V-102 FIRST & SECOND FLOOR VENTILATION NEW WORK PLAN

V-501 VENTILATION DETAILS

V-601 VENTILATION SCHEDULES, NOTES & SYMBOLS

000115 - 2 000115

LIST OF DRAWING SHEETS

FIRE PROTECTION

F-101 FIRE PROTECTION PLAN, LEGEND AND ABBREVIATIONS, FIRE ALARM

INPUT/OUTPUT MATRIX AND RISER DIAGRAM

ELECTRICAL

E-101 ELECTRICAL LEGEND, NOTES, ABBREVIATIONS AND LIGHT FIXTURE

SCHEDULE

E-201 FIRST FLOOR POWER/SYSTEMS PLAN DEMOLITION AND NEW WORK

E-301 FIRST FLOOR LIGHTING PLANS - DEMOLITION AND NEW WORK

E-401 ELECTRICAL PANELS SCHEDULES AND DETAILS

REFERENCE DRAWINGS

The following drawings are available from the Contracting Officer’s Technical Representative upon request.

REPAIR BUILDING ENVELOPE – BUILDING P-1 HANGAR 1/20/2017 (RECORD DRAWINGS)

BRAC UPGRADE F-16 ENGINE CIRF 6/17/2011 (RECORD DRAWINGS)

HANGAR 2 STORY LEAN-TO 11/15/1948

END OF DOCUMENT 000115

002113 - 1 002113

INSTRUCTIONS TO BIDDERS

DOCUMENT 002113 – INSTRUCTIONS TO BIDDERS

PART 1 – GENERAL

1.1 GENERAL REQUIREMENTS

A. The Contracting Officer will supply all required Government Forms and other “Front End” /

Division 00 Documents relating to Instructions to Bidders, Bid Forms, Bonding Requirements, Contract Forms, General and Supplementary Conditions to the Contract, and so on, and as such the aforementioned materials are not included as part of this specification.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION 002113

003119 - 1 003119

EXISTING CONDITION INFORMATION

DOCUMENT 003119 - EXISTING CONDITION INFORMATION

1.1 EXISTING CONDITION INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting

Requirements for Project. They provide Contracting Officer's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations (see article B). They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. The Bidder represents that the Bidder has visited the project site, become familiar with local conditions under which the Work is to be performed and has correlated the Bidder’s personal observations and investigations with the requirements of the Contract Documents.

C. Existing drawings that include information on existing conditions including previous construction at Project site are available for viewing at the office of Contracting Officer’s

Technical Representative.

D. Existing specifications and submittals that include information on existing conditions including previous construction at Project site are available for viewing at the office of Contracting

Officer’s Technical Representative.

E. Related Requirements:

1. Document 003126 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.

END OF DOCUMENT 003119

003126 - 1 003126

EXISTING HAZARDOUS MATERIAL

INFORMATION

DOCUMENT 003126 - EXISTING HAZARDOUS MATERIAL INFORMATION

1.1 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting

Requirements for Project. They provide Contracting Officer's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. Bidder has responsibility for examination of Project site, conducting its own investigations and determining existing conditions prior to the start of the Work.

B. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

C. An existing hazardous materials (asbestos and lead-based paint) survey report for Project, is not available. The Base Civil Engineer has indicated that hazardous materials have been removed from the P-1 facility by prior projects. Contact the Contracting Officer’s Technical

Representative and Environmental Manager for additional information, if needed.

D. Related Requirements:

1. Document 003119 "Existing Condition Information" for information about existing conditions that is made available to bidders.

2. Section 024119 "Selective Structure Demolition" for notification requirements if materials suspected of containing hazardous materials are encountered.

END OF DOCUMENT 003126

003143 - 1 003143

PERMIT APPLICATION

DOCUMENT 003143 - PERMIT APPLICATION

1.1 PERMIT APPLICATION INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting

Requirements for Project. They provide Contracting Officer’s information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. This Document and its attachments are not part of the Contract Documents.

B. Permit Application: Complete all permit applications and file with authorities having jurisdiction within five days of the Notice to Proceed. Cost and preparation of all permits shall be part of the Bidder’s offer/bid. Permits may include, but are not limited to, the following:

1. Hot Work Permit (base issued)

2. Dig Permit (base issued)

3. Confined Space Entry Permit (base issued)

4. FAA Airspace - Form 7460-1: Notice of Proposed Construction or Alteration (for tall equipment that may temporarily penetrate airspace transitional surface).

C. See also Section 010000 General Requirements.

END OF DOCUMENT 003143

009113 - 1 009113

ADDENDA

DOCUMENT 009113 - ADDENDA

1.1 NOTE: This section is a placeholder for possible future addenda and data fields are intentionally blank at the time of first issuance of the documents. Future addenda sections, if applicable, will be numbered 009113.1, 009113.2, etc.

1.2 PROJECT INFORMATION

A. Repair NDI Building P-1

Illinois Air National Guard, 183D Wing

Abraham Lincoln Capital Airport, Springfield, IL

IL ANG Project No. DCFT162012

B. Prepared by: Hanson Professional Services Inc.

1525 South Sixth Street

Springfield, IL 62703

Phone: 217.788.2450

Hanson Project No. 13D0027001

C. Prepared on Behalf of: FSB Federal Design Group JV

5801 Broadway Extension, Suite 500

Oklahoma City, OK 73118-7436

Contract No. W9113L-16-D-005

Delivery Order 9E03

Web Site: www/fsb-ae.com

D. Date of Addendum: <Insert date of Addendum>.

1.3 NOTICE TO BIDDERS

A. This Addendum is issued to all registered plan holders pursuant to the Conditions of the

Contract. This Addendum serves to clarify, revise, and supersede information in the Project

Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the

Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Government/Contractor Agreement.

009113 - 2 009113

ADDENDA

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid

Form.

C. The date for receipt of bids is [unchanged by this Addendum] [changed to the following], at same time and location.

1. Bid Date: <Insert date>.

1.4 ATTACHMENTS

A. This Addendum includes no attachments.

B. This Addendum includes the following attached Documents and Specification Sections:

1. Document <Insert Document number and name>, dated <Insert date>, [(reissued)]

[(new)].

2. Section <Insert Section number and name>, dated <Insert date>, [(reissued)] [(new)].

C. This Addendum includes the attached Addendum Drawings:

1. Structural Addendum Drawing SAD-<Insert number>, dated <Insert date>, revising

Sheet <Insert number>.

2. Architectural Addendum Drawing AAD-<Insert number>, dated <Insert date>, revising Sheet <Insert number>.

3. Fire Protection Addendum Drawing FAD-<Insert number>, dated <Insert date>, revising Sheet <Insert number>.

4. Plumbing Addendum Drawing PAD-<Insert number>, dated <Insert date>, revising

Sheet <Insert number>.

5. Mechanical Addendum Drawing MAD-<Insert number>, dated <Insert date>, revising

Sheet <Insert number>.

6. Electrical Addendum Drawing EAD-<Insert number>, dated <Insert date>, revising

Sheet <Insert number>.

7. Telecommunications Addendum Drawing TAD-<Insert number>, dated <Insert date>, revising Sheet <Insert number>.

1.5 REVISIONS TO PREVIOUS ADDENDA

A. Addendum No. 1, Item <Insert number>: Document <Insert Document number and name>, [(not reissued)] [(reissued)] [(new document)].

1. Paragraph <Insert number>: <Insert explanatory text>.

B. Addendum No. 1, Item <Insert number>: Specification Section <Insert Section number and name>, [(not reissued)] [(reissued)] [(new document)].

1. Paragraph <Insert number>: <Insert explanatory text>.

009113 - 3 009113

ADDENDA

1.6 REVISIONS TO DIVISION 00 PROCUREMENT REQUIREMENTS AND CONTRACTING

REQUIREMENTS

A. Document <Insert Document number and name>, (not reissued).

1. Paragraph <Insert number>: <Insert explanatory text>.

1.7 REVISIONS TO DIVISION 01 GENERAL REQUIREMENTS

A. Specification Section <Insert Section number and name>, (not reissued).

1. Paragraph <Insert number>: <Insert explanatory text>.

1.8 REVISIONS TO DIVISIONS 02 - 49 SPECIFICATION SECTIONS

A. Specification Section <Insert section number and name>, (not reissued).

1. Paragraph <Insert number>: <Insert explanatory text>.

1.9 REVISIONS TO DRAWING SHEETS

A. Sheet <Insert number> - <Insert title> (not reissued).

1. Drawing <Insert number>: <Insert explanatory text>.

END OF DOCUMENT 009113

010000 - 1 010000

GENERAL REQUIREMENTS

SECTION 010000 – GENERAL REQUIREMENTS

1 PART 1 – GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 JURISDICTIONS

A. The Project Work Site, Springfield Illinois Air National Guard Base (Springfield ILANG), is a

U.S. military installation and as such, all aspects of the Work on the site shall be subject to the requirements herein.

B. The Contractor shall coordinate all activities for compliance with these requirements through the Contracting Officer’s Technical Representative (COTR). Contractor shall notify COTR at least forty-eight (48) hours before authorization, coordination, or notification is required from the appropriate organization at Springfield ILANG, unless otherwise noted.

1.3 DESIGN AND CONSTRUCTION STANDARDS

A. Design and construction shall comply with Air National Guard Design Policy, ANGETL 12-05 “Design and Construction Handbook” dated 6 July 2012 and

ANGI 32-1023 “Criteria and Standards for Air National Guard Design and

Construction dated 21 January 2015. This requirement applies to all “Related

Documents” paragraphs of this Project Manual.

1.4 SAFETY

A. Base and Safety Regulations:

1. These requirements are in addition to those that are contained in FAR Clause

52.236-13, “Accident Prevention;” and FAR Clause 252.236-7005, “Airfield Safety

Precautions.”

2. The Contractor shall comply with all applicable provisions of the Air Force regulations and directives pertaining to security, safety, fire, traffic, and personnel clearances insofar as they pertain to the Contractor’s activities on Springfield ILANG.

3. The Contractor shall be responsible for providing, placing, and removing all barricades and safety devices during his construction activities.

4. In addition, the Contractor shall:

a. Caution vehicle operators to avoid intrusion on the runway or flight line.

b. Yield to all emergency vehicles including security police, fire department, ambulance, and ambulance buses when their red lights and/or sirens are operating.

010000 - 2 010000

GENERAL REQUIREMENTS

c. Coordinate movement of heavy/ oversized equipment such as cranes, extended flat bed trailers and large earth moving vehicles with the COTR.

d. Provide personnel to direct traffic when Contractor-operated vehicles block one

(1) or both lanes of a two (2) lane road.

5. If a mishap involves injury or death to Contractor personnel and/or damage to Air Force property as a result of Contractor operation, the Contractor shall notify the Contracting

Officer (KO) and COTR. The COTR will contact the Wing Safety Office on normal workdays or the Security Police at any other time. Any safety-related problems encountered during the contract period should be reported to the COTR who will advise

Wing Safety. In case of life-threatening emergency, dial 911 to reach the Security

Police, Fire Department, or ambulance. Emergency treatment for serious or life-threatening injuries is available in the City of Springfield.

6. The Contractor shall ensure compliance with contract, OSHA, AFOSH, Federal, State and Local provisions.

B. Site Security:

1. The construction site and Contractor lay-down area, designated by the COTR, shall be enclosed by a 6 ft chain link fence with brown, UV resistant construction windscreen and gates. The fence shall be installed with self-supporting bases to prevent damage to the adjacent pavement surfaces. Upon completion and acceptance of the Work, the construction fence shall be removed.

2. Contractor shall provide a temporary safety fence with gates and warning signs at the construction site prior to the start of work to protect members of the public from construction activities. The safety fence will enclose those areas not within the construction fence. The construction fence may be used in lieu of a safety fence. The safety fence shall be bright orange in color when protecting excavated areas, high density polyethylene grid or approved equal, a minimum of 42 in. high, supported and tightly secured to steel posts located on minimum 10 ft centers, constructed at the approved location. The safety fence shall be maintained by the Contractor during the life of the contract and, upon completion and acceptance of the Work, shall remain the property of the Contractor and shall be removed from the work site.

3. Provide and maintain additional temporary security fences as necessary to protect the

Work and Contractor-furnished products not yet installed.

C. Barricades and Lights:

1. Provide as necessary to prevent unauthorized entry to construction areas and affected roads, streets, and alleyways, inside and outside of fenced area, and as required to ensure public safety and the safety of Contractor’s employees, other employer’s employees, and others who may be affected by the Work.

2. Provide to protect existing facilities and adjacent properties from potential damage.

3. Locate to enable access by facility operators and Government property.

4. Protect streets, roads, highways, and other public thoroughfares that are closed to traffic by effective barricades with acceptable warning signs.

5. Locate barricades at the nearest intersecting public thoroughfare on each side of the blocked section.

010000 - 3 010000

GENERAL REQUIREMENTS

D. Safety Briefing:

1. Primary Contractors will brief subcontractors on safety and fire prevention regulations, emphasizing the requirement to obtain a hot work permit, when welding, cutting and brazing operations are required, and obtain authorization from the Base Fire Chief, through the COTR, when open burning is intended.

2. Maintain documentation that all subcontractors have been briefed.

1.5 FIRE PREVENTION STANDARDS

A. The following is information pertaining to fire prevention standards at Springfield ILANG.

These standards apply to all new construction and reconstruction, demolition, rehabilitation, alteration and modification.

B. Serious fires can occur due to accumulation of combustible materials or debris and the presence of ignition sources. Basic safeguards against construction fire hazards must be provided for during project planning. These standards outline measures which, with some pre-planning, may prevent fires or, at least minimize damage if a fire does occur.

C. Responsibilities:

1. A civil engineering or fire department representative will attend preconstruction conference to brief the Contractor on pertinent fire regulations and to provide guidance for fire-safe operations during contract performance. Fire Prevention guidance appropriate for each type contract will be furnished the Contractor for briefing his personnel.

2. The Contractor will furnish the COTR or fire department Fire Prevention Section and

Security Police with the name(s) of responsible individuals, who, in case of a fire after normal work hours, can be notified of an incident.

3. The Contractor shall be responsible for assuring proper availability, operation and location of fire protection equipment, general supervision of safeguards and location of salamanders or portable heating equipment, and establishment and maintenance of safe cutting and welding operations.

4. To report a fire, dial 911.

D. Water Supply:

1. The Contractor will ensure an adequate water supply for fire protection is available whenever combustible materials accumulate.

2. Temporary connection to a main or fire hydrant by a Contractor will first be coordinated through the COTR with a civil engineering or fire department representative to ensure availability of water supply for fire protection is not jeopardized.

3. Any connection to the public potable water supply must comply with Illinois Plumbing

Code using an approved cross-connection device and be coordinated with the Base

Civil Engineer (BCE).

010000 - 4 010000

GENERAL REQUIREMENTS

E. Access for Firefighters:

1. Access for use of firefighting vehicles will be provided to the immediate job site at the start of construction and maintained until all construction is complete. Vehicle parking control measures will be established that will allow firefighters access to the construction site.

2. Free access from the street to fire hydrants and to outside connections for standpipes, sprinklers, or other fire extinguishing equipment, whether permanent or temporary, shall be provided and maintained at all times. No material or construction will be placed within 10 ft of hydrants or connections, or between hydrants and the center line of the street.

3. Fire hydrants in excavations will be rigidly braced and protected from freezing.

4. Scaffolding, materials, or equipment will not block fire escape routes during performance of projects in occupied buildings.

5. In buildings over 30 ft in height, at least one stairway will be provided in usable condition at all times. This stairway will be extended upward as each floor is installed.

For buildings less than 30 ft in height, safe methods for ascending/ descending will be provided in accordance with standard industry practice.

F. In accordance with AFM 91-201, Explosives Safety Standards, if storing more than 1,000 nail gun cartridges, approval must be requested from Wing Safety through the COTR.

G. The Contractor will notify the Fire Prevention representative, through the COTR, whenever an existing fire detection, alarm, or extinguishing system must be disconnected, relocated, or extended. Fire Protection system components will be handled carefully to assure reliability when the system is restored to service.

H. Any fire hazard or condition that is not specifically covered by these specifications that is recognized by anyone will be immediately brought to the attention of supervisors or anyone having authority to stop the operation.

I. For any further fire prevention guidance or specifics, contact the COTR.

1.6 STANDARD WORKDAY/WEEK

A. Work shall normally be accomplished Monday through Friday, between the hours of 7:30 a.m.

and 4:30 p.m. local time, excluding national holidays and non-work days resulting from holidays occurring on weekends.

B. When the Contractor desires to work at other than the aforementioned times, he shall submit a written request to the Contracting Officer via the COTR for approval, and written approval thereof shall be required prior to proceeding with work:

1. The request shall be submitted at least three (3) work days prior to the proposed performance of work.

2. The request shall indicate the day/days, time/amount of work, and reason why permission should be granted to perform work during nonstandard hours.

3. Approval for work to be performed during nonstandard time will be given only in cases of extreme necessity.

010000 - 5 010000

GENERAL REQUIREMENTS

1.7 CONSTRUCTION PERMIT

A. The Contractor shall obtain, through the COTR, an AF Form 103—Base Civil Engineer Work

Clearance Request (hereafter referred to as a “digging permit”), from the Base Civil Engineer.

The purpose of the permit is to locate, prior to excavation, all known underground utilities.

B. The Contractor shall initiate the request for a digging permit a minimum of five working days prior to performing any excavation or ground penetration. The Contractor shall provide equipment to locate and perform the location of utilities.

C. The Contractor shall clearly mark the location of the excavation or ground penetration with white, water soluble, spray paint, or white utility marking flags. The Contractor shall insure the markings are maintained until the area is cleared by all responsible agencies or offices for each utility.

D. The Contractor shall also show the identified area on a site plan. The site plan shall clearly delineate the proposed work area, nearest building, the nearest cross street to the location of digging. The Contractor shall provide this site plan to the BCE when requesting the digging permit. In the event that a representative for the designated utility does not respond to the locating request, the Contractor shall immediately notify the Contracting Officer and COTR.

E. After identified utilities have been cleared through each affected agency or office and the

BCE, the Contractor will receive a copy of the digging permit. The Contractor must have the digging permit on the job site during the excavation process.

F. The Contractor shall exercise every precaution during excavation to prevent damage to the existing utilities. The Contractor shall immediately notify COTR if any utilities are damaged during the location or excavation process.

1.8 HOT WORK PERMIT

A. The Contractor shall obtain from the Springfield ILANG, Base Civil Engineer (BCE), a permit for any welding or flame cutting operations prior to initiating such operations. A minimum of two fire extinguishers shall be at the site of all open welding or flame cutting operations.

B. The Contractor shall initiate the request a minimum of five working days prior to performing any hot work.

1.9 CONFINED SPACE PERMIT

A. The Contractor shall obtain from Springfield ILANG, through the COTR, a Confined Space

Permit prior to entry into any existing Base confined space.

B. A confined space shall be as defined in OSHA and the IL ANG’s confined spaces program.

C. The Contractor shall initiate the request a minimum of five working days prior to entry into any existing Base confined space.

010000 - 6 010000

GENERAL REQUIREMENTS

1.10 IEPA, EPA AND LOCAL PERMIT REQUIREMENTS

A. The Contractor shall obtain and abide by the following permits and notifications as required for the construction of this project:

1. Illinois Environmental Protection Agency (IEPA) Notification of Demolition and

Renovation, form APC 430, for asbestos abatement.

2. City of Springfield, Illinois standard permits:

a. Application for Plan Examination and Building Permit.

b. Application for Electrical Permit.

c. Application for Plumbing Permit.

d. Application for Mechanical Permit.

B. The Contractor will prepare and submit all such permits and notifications to the

Contracting Officer’s Technical Representative.

1.11 OTHER PERMIT REQUIREMENTS

A. Refer to Section 003143 Permit Application.

B. IEPA Sanitary Sewer Permit, Schedule A/B, form WPC 151 and/or Springfield

Metro Sanitary District Permit if not owned by IL ANG. (for sewer taps)

C. NPDES Permit No. ILR10 for Construction Site Activities including a Storm

Water Pollution Prevention Plan (SWPPP) and Notice of Intent (NOI), form WPC

623. Submission is required 30 days prior to commencement of construction. The

SWPPP, if applicable to project, is included in the plan drawings. (for site work)

D. EPA Water Main Permit, including Schedules A and B, forms PWS 43, PWS115 and PWS 56 and/or City Water, Light & Power Permit if not owned by IL ANG.

(for water service taps)

E. FAA Airspace - Form 7460-1: Notice of Proposed Construction or Alteration (for tall equipment that may temporarily penetrate airspace transitional surface)

1.12 TWENTY-FOUR (24) HOUR POINT OF CONTACT

A. The Contractor shall provide the Contracting Officer and COTR with a twenty-four (24) hour number or numbers where his authorized representative can be contacted at anytime day or night. Also provide call forwarding capability for leaving a message. This number should be provided at the preconstruction conference, but not later than ten (10) days after the Notice to

Proceed is issued.

010000 - 7 010000

GENERAL REQUIREMENTS

1.13 UTILITIES AND SERVICES

A. The Contractor shall be permitted to connect to the Government’s existing utility system

(water, electric, and sewer). The Contractor will be required to pay for connection of all utilities.

B. The Contractor shall be permitted the use of all reasonably required amounts of utilities

(water, electric, and sewer) from the Government’s existing system outlets.

C. In addition to requirements contained in FAR Clause 52.236-14, “Availability and Use of

Utility Services,” temporary utility connections shall be at the Contractor’s expense and be subject to the approval of the Contracting Officer and the COTR. The Contractor shall provide telephone and other services required for the work.

D. If portable sanitary facilities are utilized, said facilities are subject to the approval of the

Contracting Officer, through the COTR, as to the location, cleanliness, and maintenance. All temporary sewer/ sanitation facilities shall be self-contained units with both urinals and stool capabilities. The units shall be sufficiently ventilated to control odors and fumes and should be emptied and cleaned at least every week or more often if required by the Contracting Officer.

The doors should be self-closing. The exterior color of the unit shall be any color the

Contractor desires. Base facilities will not be utilized. The facility will be located behind the construction fence or out of the public view.

1.14 UTILITY SERVICE INTERRUPTIONS

A. The Contractor shall submit written notification to the COTR not less than five (5) work days in advance for each planned interruption of a utility service.

B. No single interruption shall exceed four hours.

C. Utility service interruptions shall not be permitted unless approved by the Contracting Officer and COTR.

D. Service interruptions shall be accomplished at other than normal work hours if feasible.

Schedule for base down Fridays.

1.15 DUST CONTROL

A. The Contractor shall maintain all excavations, embankments, stockpiles, access roads, and all other work areas free from excess dust to such reasonable degree as to avoid causing a hazard or nuisance to base personnel or surrounding facilities.

B. Approved temporary methods consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods may be permitted to control dust with prior approval of the

Contracting Officer and COTR.

C. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.

010000 - 8 010000

GENERAL REQUIREMENTS

1.16 NOISE, VIBRATION, AND ODORS

A. Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to IL ANG occupancy with COTR.

1. Notify COTR not less than two days in advance of proposed disruptive operations.

2. Obtain COTR’s written permission before proceeding with disruptive operations.

1.17 PATCHING AND REPAIRING

A. After the work has been completed, any Contractor-caused damages to Springfield ILANG-owned structures, facilities, streets, curbs, walks, lawns, parking aprons, etc., shall be properly patched, repaired, or replaced to the complete satisfaction of the Contracting Officer, through the COTR.

B. Any holes, cuts, breakage’s, and damages made in finished surfaces of the area in which work has been accomplished, shall be properly repaired and the disfigured areas then painted over or otherwise repaired and resurfaced in kind to match the existing finishes to the complete satisfaction of the Contracting Officer, through the COTR.

1.18 DISPOSITION OF REMOVED GOVERNMENT PROPERTY

A. All materials and equipment to be removed by the Contractor and not reinstalled under this contract, including debris generated by this project, shall be removed at regular intervals from the site and disposed of off-base by the Contractor.

B. Off-base disposal of materials shall be in conformance with applicable Federal, state, and local pollution regulations at the Contractor’s expense.

C. Refer also to Section 013543 Environmental Protection and associated waste disposal forms and reporting requirements therein.

1.19 PROTECTION OF BUILDING CONTENTS

A. The Contractor shall protect from damage all building contents located directly beneath or immediately adjacent to the site of work, and shall repair, replace, or otherwise be held liable for all such damage. Building contents include, but are not limited to, furniture, equipment, materials, or items of supplies.

1.20 ACCOMPLISHMENT OF WORK

A. Access for delivery of materials and equipment, as well as removal of demolished equipment shall be coordinated with the COTR who will, in turn, coordinate with the BCE. Construction personnel entry and locations of construction delivery, debris removal, construction storage

010000 - 9 010000

GENERAL REQUIREMENTS

and trailers, construction parking and personnel entries will be provided by the BCE at the preconstruction meeting or to the COTR, as appropriate.

B. Base communications personnel shall be allowed to work periodically within the project area during the construction period installing and/or repairing operational communication lines.

C. Smoking will not be permitted within any area of any federal building. Smoking is permitted in designated smoking areas.

1.21 RECYCLING

A. In support of national environmental efforts, the Contractor is encouraged to recycle general administrative refuse associated with this project. This refuse includes cardboard, 1 gallon mark 1 and 2 plastic bottles, type 1 and 2 plastic soda bottles, aluminum and steel soda cans, and mixed paper. Contact the Environmental Office. Also reference Section 013543

“Environmental Protection”.

1.22 COMMUNICATIONS COORDINATION REQUIREMENTS

A. Contractor shall, in order to effect the appropriate coordination and obtain clearance to operate two-way radio and radio frequency transmitting equipment on Springfield ILANG, contact the

COTR.

1.23 SITE ACCESS AND SECURITY

A. United States Air Force Security has jurisdiction over all activities on or relevant to

Springfield ILANG. The Contractor, Subcontractors, Suppliers, and any other persons and organizations performing or furnishing any of the Work shall fully comply with any and all lawful orders of Air Force Security Staff.

B. All Contractor material deliveries shall only be via the designated construction gate. All

Contractor personnel access to the site shall only be via the Main Gate. Entrance to the Site shall be restricted and require issuance of a security pass or badge subject to the requirements of Base Security. Site access/deliveries will be coordinated further during the pre-construction meeting.

C. The following is information pertaining to law enforcement and security policies in effect at

Springfield ILANG. Questions or comments that concern the Security Police, must be directed to the COTR. Driver’s licenses will be verified with local law enforcement. Individuals who have invalid licenses or have warrants for arrest will be detained for local law enforcement agencies:

1. Speed Limits: Speeding is not tolerated on Springfield ILANG property. Speed should never exceed 20 mph unless noted otherwise. Radar detectors are illegal and speed limits are strongly enforced.

2. Reserved/Prohibited Parking Areas:

010000 - 10 010000

GENERAL REQUIREMENTS

a. Reserved parking is marked by signs listing the person or category for which the space is reserved or stating which type of decal is required to park in the space.

b. Prohibited parking is marked by sign or yellow paint on the curb.

c. Parking on the grass or seeded areas is strictly prohibited unless it is required for contract completion.

3. Crosswalks: Motorists are required to yield to anyone in or about to enter a crosswalk.

4. Joggers/Cyclists: Motorists are cautioned to look out for high numbers of people engaged in exercise, especially during the middle of the day.

5. Traffic Citations: Violation of base traffic rules could affect Contractor or individual access to the base. All provisions of the Illinois Vehicle Code and Air Force

Regulations are enforceable for all drivers on Springfield ILANG property. Actions taken as result of traffic citations:

a. Notification to employer with required actions.

b. Loss of base driving privileges.

c. Fines.

d. Barment from the base.

6. Weapons: No firearms, plastic explosives, fireworks, or any object which fires a projectile or explosive can be brought on base (except approved construction equipment). Offenses of this nature will be referred to the Sangamon County Sheriffs

Office, the U.S. Magistrates Court, or the Bureau of Alcohol, Tobacco and Firearms.

7. Gate Closures: Anytime a security system is activated or a hostile act is committed on base, security procedures call for access gates to be closed until the “all-clear” is given.

Delays may occur when attempting to enter or depart the base during such an incident.

8. Controlled/Restricted Areas: Areas posted as Controlled or Restricted Areas (including the flightline, taxiways and ramps) are clearly marked with signs and constitute legal

“No Trespassing” zones. Entry into these areas is strictly prohibited unless specific written authority is granted. Persons inadvertently entering a Controlled/ Restricted area will be apprehended by security personnel and treated as hostile until proper identity can be confirmed. Personnel should cooperate with security personnel in these types of situations since security personnel will continue to elevate force with resistance received.

9. Required Coordination: If required to block off a street or portion of a street, before doing so, and with as much advance notice as possible, Contractor shall coordinate with the COTR.

10. Base Entry: Check with Guard posted 24 hours a day, identify Company, and reason to be on Base. Current vehicle registration, valid driver's license and vehicle insurance are mandatory when on IL Air National Guard Property

D. Contractor shall ensure all pilferable items are secured when not in use.

E. Contractor shall provide Contracting Officer/COTR with a list of personnel that will be working on the site. Include Attachments SF Form 1705 and SF Form 1706 for each personnel.

010000 - 11 010000

GENERAL REQUIREMENTS

1.24 PRECEDENCE OF OPERATIONS

A. The Contractor shall never be on or near any aircraft or aircraft component operating surface.

2 PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION 010000

Attachment 8

CONSENT FOR BACKGROUND CHECK

PRIVACY ACT STATEMENT

AUTHORITY: Section 3101, Title 44 - 10 United States Code (U.S.C.) 8013 Executive Order 9397, USC 552A.

PRINCIPLE PURPOSE: Criminal History Background Checks on individuals working on Federal Installations ROUTINE USES: In formation may be disclosed to local, county, state, and federal law enforcement/investigative authorities for investigation. Information extracted from this form may be used in other related criminal proceedings DISCLOSURE: Voluntary. However, r efusal to provide required information or sign this form will prevent the individual from gaining access to Federal Installations

NOTICE: The information on this form is being collected in accordance with federal law permitting the installation commander to limit access to the installation for security reasons (50 U.S.C. Section 797 and DoD Directive 5200.8). This data will be used to screen individuals who have, or are seeking access to, the 183d Fighter Wing, Springfield, Illinois. Failure to provide truthful, complete and accurate responses may be used as a basis to deny entry to the installation and is also punishable as a criminal offense.

Section 1.

I have been advised and I understand the United States Air Force has an obligation to require a criminal history background check as a condition prior to allowing unescorted access to an installation in order to provide security for personnel and property under its' control. I also understand that random criminal history background checks will be conducted on me while I am working on Federal Installations. I have been further advised that I have a right to obtain a copy of any report and to challenge the accuracy and completeness of any information included in such report.

Section 2.

I understand that the record checks may include the following:

A State Criminal History Repository Check in the state where I currently reside and in states where I have formerly resided.

A National Agency Check with Inquiries, which includes a Federal Bureau of Investigation, fingerprint check as required.

Section 3.

I hereby authorize any Federal, State, or Local agency or office to release any record relating to me, which is necessary to complete the record checks, described above.

Section 4. PERSONAL IDENTIFICATION (Print or Type) Spell out First, Middle, and Last Names (No Initials)

Name (Last Name, First Name, Middle Name) Maiden Name (Last Name, First Name, Middle Name)

Former Name ( Last Name, First Name, Middle Name) SSAN Date of Birth

Gender Drivers License Number State of Issue

Male Female

Current Address, City, State, Zip Code Former Address, City, State, Zip Code

Section 5. Employee Certification

THIS CERTIFICATION CONCERNS A MATTER WITHIN THE JURISDICTION OF AN AGENCY OF THE UNITED STATES

AND MAKING OF A FALSE, FICTITIOUS, OR FRAUDULENT CERTIFICATION MAY RENDER THE MAKER SUBJECT TO

PROSECUTION UNDER TITLE 18, UNITED STATES CODE, SECTION 1001 OR OTHER APPLICABLE LAWS AND

REGULATIONS.

EMPLOYEE SIGNATURE: _______________________________ DATE: _______________________

SF FORM 1705 , 20071215 ILANG CONTRACTOR'S CONSENT FORM Page 1 of 1 flatt00501 Typewritten Text SAMPLE FORM - LATEST FORM TO BE PROVIDED BY CONTRACTING OFFICER, COTR OR SECURITY.

Attachment 1

APPLICATION FOR PERSONNEL PASS TO

WORK UNDER AIR FORCE CONTRACT

(INSTRUCTIONS)

1. Submit two copies. All information must be completed. Spell out First, Middle, and Last Names (no initials)

2. Employee must present TWO, approved forms of identification (see INS Form I-9)

3. Employees operating their personal vehicle on base must possess current insurance, driver’s license, and State vehicle registration

SECTION I: Contractor must ensure all blocks are complete

1.1. THRU: 183 MSG/MSC

3101 J. David Jones Parkway Springfield, IL 62707-5001

TO: 183 SFS/SF5T

1.2. FROM: (PRIME CONTRACTOR’S NAME, ADDRESS, PHONE)

1.3. CONTRACT NUMBER 1.4. CONTRACT EXPIRATION DATE 1.5. DAYS/HOURS WORKED 1.6. PLACE OF DUTY/WORK/BLDG

Employee Information Vehicle Information

(VEHICLES USED TO AND FROM

WORK SITES)

1.7. NAME: (LAST, FIRST, MIDDLE) 1.8. SOCIAL SECURITY # 1.9. DATE

OF BIRTH

1.10. DRIVER

LIC. NO/STATE

1.11.

MAKE/MODEL/YEAR

1.12.

PLATE NO/STATE

THIS CERTIFICATION CONCERNS A MATTER WITHIN THE JURISDICTION OF AN AGENCY OF THE UNITED STATES AND THE MAKING OF A FALSE, FICTITIOUS, OR FRAUDULENT CERTIFICATION MAY RENDER THE MAKER SUBJECT TO PROSECUTION UNDER TITLE 18, UNITED

STATES CODE, SECTION 1001 OR OTHER APPLICABLE LAWS AND REGULATIONS.

NOTE: “CONTRACTOR AND EMPLOYEE” SHALL RETURN BADGE TO SFS PASS & REGISTRATION OFFICE UPON EXPIRATION OR TERMINATION

1.14. EMPLOYEE SIGNATURE: ____________________________________________________ DATE: ___________

1.15. PRIME CONTRACTOR’S CERTIFICATION: The below signature is employer certification that employee is working on above contract.

PRIME CONTRACTOR’S NAME: __________________________________________________________ DATE: _____________

PRIME CONTRACTOR’S Phone #: __________________

PRIME CONTRACTOR’S SIGNATURE: _________________________________________________________________________

1.16. If Employee is a sub-contractor employee: Complete below

1.16.1 Sub-Contractor Company Name & POC: ________________________________________________________________________

1.16.2 Sub-Contractor’s Address & Phone Number: ___________________________________________________________________

SECTION II: To be completed by Security Forces Pass and Registration

2.1. NCIC Check 2.2. Badge Area 2.3. Badge Type 2.4. Date Issued 2.5. Date Expires

Conducted On: __________________________

Contractor: Yes ___ No ___ Vendor: Yes ___ No ___ Other: Yes___ No ___

PRIVACY ACT STATEMENT

AUTHORITY: Section 3101, Title 44, United States Code, AFI 33-332, 5 USC 552A PRINCIPAL PURPOSE(S): The purpose for requesting personal information is to assist security personnel in developing records to document contractor employee suitability for access to the 183 FW ILANG to work under Air Force contracts. The Social Security Number (SSN) and Date of Birth (DOB) are necessary to identify the person and records. This information may be used to determine suitability of persons desiring access to the 183 FW as well as for other lawful purposes including law enforcement and litigation. INTENDED USE: All contractors, subcontractors, units or 183 FW sponsoring activities who have employees not authorized a Common Access Card and require regular and frequent access to 183 FW in performance of their official duties. DISCLOSURE: Disclosure of requested information is mandatory. Failure to provide information will result in access privileges being refused or withdrawn. The Privacy Act Statement will apply throughout the duration of the Air Force contract while serving in the capacity of prime contractor or subcontractor/supplier employee.

SF FORM 1706 20071215

flatt00501 Typewritten Text SAMPLE FORM - LATEST FORM TO BE PROVIDED BY CONTRACTING OFFICER, COTR OR SECURITY.

011000 - 1 011000

SUMMARY

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Work by Government/IL ANG.

4. Work under separate contracts.

5. Government/IL ANG-furnished products.

6. Access to site.

7. Coordination with occupants.

8. Specification and Drawing conventions.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.3 PROJECT INFORMATION

A. Project Identification: DCFT162012 Repair NDI Building P-1

B. Project Location: Abraham Lincoln Capital Airport, Springfield, IL

C. Owner: Illinois Air National Guard, 183D Wing:

1. Contracting Officer: SSgt Alicia Braun

2. Contracting Officer’s Technical Representative: Capt. Erick Marks, Deputy BCE

D. Architect: Hanson Professional Services Inc.