This is a solicitation for a Truck Mounted Stiff Boom Crane to be utilized by the United States Army Garrison Yongsan-Casey Department of Public Works. The crane must be easily maneuverable for urban worksite access and all operations must be performable by one operator. An optional man basket is also requested. Questions regarding the solicitation are due by September 10th at 0900 KST and offers must be submitted by September 17th at 1200 KST. This requirement is restricted to local contractors located within the soliciting agency's area of responsibility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011529203

Project # 22302, Repair Barracks, building No.4025

A. "THIS IS A NON-WORK PLAN TASK ORDER RFP TO MATOC AREA I AND II CONTRACTORS ONLY". Contract Numbers # W91QVN- 18-D-0021, 0022, 0023, 0025, 0026, 0027, 0028, 0030, 0031, 0042, 0044, 0045, 0046, 0050, 0051.

B. Site Visit: Offerors w ho intended to propose on this solicitation are strongly encouraged to attend site visit. See site visit clause FAR

52.236.27 in Section L.

C. If the contractor is unable to submit the proposal in response to this RFP, the contractor shall submit the "NO OFFER" by date and time specif ied in this solicitation.

D: SAEF NOTICE

SUBJECT TO THE AVAILABILITY OF END-OF YEAR FUNDS (SAEF)

"FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD

WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE."

SSG PROCTOR, TIANNA M. 755-0639

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

14-Sep-2020

(RFP)

(IFB)

X

CALL:

Repair Barracks, Building No. 4025, Camp Hovey

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CSB, KOREA - IMB

UNIT#15289

APO AP 96205

UNITED STATES

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

223002

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 724-6977 TEL: FAX:

W91QVN20R0218 40

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

REPAIR BARRACKS #4025

FFP

SPECIFICATIONS FOR

PROJECT NO.: 223002

REPAIR, BARRACKS, BUILDING NO.4025

CAMP HOVEY, KOREA

FOB: Destination

PURCHASE REQUEST NUMBER: 0011529203

PSC CD: Z2FC

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Estimated Cost for War Hazard Losses

FFP

is Zero (0) FOB: Destination

PSC CD: Z2FC

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN-

CASEY

UNIT #15543

APO AP 96224-

IMYN-C-PWF 24 July 2020

SPECIFICATIONS

FOR

PROJECT NO.: 223002

Repair barracks, building No.

4025 Camp Hovey, Korea

TABLE OF CONTENTS

1. Technical Provisions - I: Statement of Work

2. Technical Provisions - II: Technical Detail Specifications

3. Technical Provisions - III: Special Conditions

4. Appendix "A": List of Applicable Contract Drawings

5. Appendix “B”: List of materials for Material Approval Submittal

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO

TITLE

LOCATION

223002 Repair barracks, building No. 4025 Camp Hovey

1. DESCRIPTION: The work to be performed to repair barracks, building No. 4025 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project.

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace 1.2m width sidewalk.

2.1.1.2. Replace granite curb.

2.1.1.3. Replace shade shelter with two (2) movable wood picnic tables.

2.1.1.4. Mill and overlay with 50mm thickness Asphalt Concrete (AC) surface course.

2.1.1.5. Replace 8.0m width AC road.

2.1.1.6. Plant cherry blossom tree.

2.1.1.7. Upgrade drainage system with four (4) surface inlet (0.7m x 0.7m) and 300mm diameter Reinforced Concrete Pipe (RCP) to connect to existing concrete open ditch.

2.1.1.8. Paint 150mm thickness reflective white parking line.

2.1.1.9. Remove existing wood shelter.

2.1.1.10. Restore solid sodding with top soil.

TP I-1

2.1.2. Architectural Work

2.1.2.1. Floor work

2.1.2.1.1. Replace existing floor tile and rubber tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) and Rubber Base (RB) as shown on new floor plan and interior finish schedule.

The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall be corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.

2.1.2.1.2. Replace existing quarry tile including quarry tile base with new as shown on floor plans and interior finish schedule.

2.1.2.1.3. Replace existing Ceramic Mosaic Tile (CMT) with new including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans, section and details drawings.

2.1.2.1.4. Replace existing concrete slab at corridor, each bath rooms, toilet, laundry, and mud room on 1st floor for mechanical sewer line works as shown on floor plan and mechanical drawings.

2.1.2.1.5. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.

2.1.2.2. Interior and exterior wall work

2.1.2.2.1. Replace existing all Gypsum Wall Board (GWB) walls with new GWB wall (Normal, water resistant or 'X' type) including metal studs as shown on floor plans, sections and detail drawings.

2.1.2.2.2. Paint all existing interior walls including Concrete Masonry Unit (CMU), metal, concrete surfaces, stairway, hand rails, and guard rails as shown on floor plan, detail drawings interior finish schedule.

2.1.2.2.3. Paint all existing exterior walls including Exterior Insulation and Finish System (EIFS), CMU, metal, woods, concrete surfaces, stairwells, hand rails, guard rails, and other components (bicycle rack, trash bin) of exterior surface of the building as shown on floor plan, detail drawings and pictures.

2.1.2.2.4. Apply texture coating with plastering at dressing room and closet as shown on floor plans, elevations and interior finish schedule.

2.1.2.2.5. Replace existing Glazed Ceramic Wall Tile (GCWT, full height) with new including cement bond coats, water proof membrane, plastering with metal lath, and waterproof GWB as shown on floor plans and sections.

2.1.2.2.6. Replace existing pipe chases and pipe cover with new CMU, waterproof type GWB pipe chases and metal cover including access door in each rooms for new mechanical piping system as per floor plans, sections, and detail drawing.

TP I-2

2.1.2.2.7. Replace existing Acoustical Wall Panel (AWP) as shown on floor plan and interior finish schedule.

2.1.2.3. Interior and exterior ceiling and roof work

2.1.2.3.1. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.

2.1.2.3.2. Replace existing ceiling with new GWB (Normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.1.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.

2.1.2.3.4. Paint all existing exterior exposed metal, woods, fascia, and soffit as shown on floor plan and elevations.

2.1.2.3.5. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and sections.

2.1.2.3.6. Replace existing rain gutter with new at canopies as shown on floor plan and elevation.

2.1.2.4. Miscellaneous work

2.1.2.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule.

2.1.2.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations and window schedule.

2.1.2.4.3. Replace existing window horizontal mini blinds with new, fireproof type.

2.1.2.4.4. Replace existing wooden head, jam & sill for all windows with new as shown on door and window schedule. (Natural color, oak)

2.1.2.4.5. Replace existing aluminum louver with new as shown on floor plans and louver schedule.

2.1.2.4.6. Replace existing Fire Extinguisher Cabinets (FEC) with new as shown on floor plans and detail drawing.

2.1.2.4.7. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.

2.1.2.4.8. Replace existing all access doors on wall and ceiling with new as shown on floor plan and enlarged floor plan.

2.1.2.4.9. Replace existing kitchenette with new including base cabinet and upper cabinet as shown on floor plan, elevation and detail drawings.

2.1.2.4.10. Replace interior and exterior signages with new for all rooms as shown on floor plan, elevations and signage schedule.

2.1.2.4.11. Replace existing metal shelf with mop rack with new in janitor room. 2.1.2.4.12.

Replace existing gravel bed and concrete curb with new 100mm deep gravel bed including granite curb around building as shown on floor plan and detail drawing.

TP I-3

TP I-4

2.1.2.4.13. Replace existing trench covers, hooks, and hose bib with new, and paint steel cover at mud room as shown on floor plan and detail drawing.

2.1.2.4.14. Replace existing al grating covers with new for each vest as shown on floor plan and detail drawing.

2.1.2.4.15. Replace existing counter top and Stainless Steel (SST) shelves with new at laundry as shown on floor plan and detail drawing.

2.1.2.4.16. Replace existing iron board cabinet with new as shown on floor plan and detail drawing.

2.1.2.4.17. Replace existing exterior and interior bulletin boards, card holder, and flexi info with new as shown on floor plan, detail drawing and signage schedule.

2.1.2.4.18. Replace existing aluminum louvers with new as shown on floor plans and detail drawings.

2.1.2.4.19. Replace wooden shelf, SST rod, and drawer cabinet with new in each closet as shown on floor plan and details.

2.1.2.4.20. Replace existing fire rated access doors (1-1/2hrs) with new at laundry and stairwell as shown on floor plans.

2.1.2.4.21. Replace existing wooden chair rails and wooden hanger rails at each bed room, kitchen, lounge and game room with new as shown on floor plans and detail drawings.

2.1.2.4.22. Replace existing vanity cabinets including wall hung cabinet with new in all dressing room as shown on new floor plans and detail drawing.

2.1.2.4.23. Replace existing concrete stoops with new as shown on floor plan.

2.1.2.4.24. Replace existing 18mm thickness plywood shelves including plastic laminate at each storage bin as shown on floor plans and elevations.

2.1.2.4.25. Replace existing SST splash guard with new as shown on floor plan and exterior elevations.

2.1.3. Mechanical Work

2.1.3.1. Replace Heating, Ventilating, and Air Conditioning (HVAC) system with chiller, hot water boiler, air handling units, heating and ventilating units, fan coil units, exhaust fans, pumps, expansion tank, air separator, air conditioning units, unit heater, ducts, louvers, diffusers, grilles, range hood, valves, dampers, pipes, insulations, control work, equipment support (concrete pad), and all associated accessories as shown on drawings. (Existing domestic hot water heater excluded)

2.1.3.2. Provide new electrical unit heater and ceiling mounted exhaust fans for HVAC system as shown on drawings.

2.1.3.3. Perform Duct Air Leakage Test (DALT) and Testing, Adjusting, and Balancing (T.A.B) after construction to verify if the HVAC system works properly.

2.1.3.4. Replace existing all dryer vent and caps with new.

A‐9

2.1.3.5. Replace plumbing system with domestic cold and hot water piping system, sewer and vent piping system including domestic hot water storage tanks, pumps, plumbing fixtures, electric water coolers, valve boxes for washing machines, valves, pipes, insulations, control work, equipment support, and all associated accessories as shown on drawings.

2.1.3.6. Replace existing automatic fire protection sprinkler system and all associated accessories for fire protection system as shown on drawings.

2.1.3.7. Pre-air leaking test is required prior to repair infiltration and sealing at mechanical room. Repair infiltration and seal air leaking portions including clearance between wall, ceiling, and penetrators (duct, water piping, conduct pipe, and flue vent pipe) at mechanical room. Provide final-air leakage test report.

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, photocell, wires and conduits with new.

2.1.4.2. Replace existing receptacles and cover plates with new.

2.1.4.3. Replace existing safety switches, master control panel, combination motor starters, magnetic motor starters, manual motor starters, junction boxes, control system, wires and conduits for HVAC system with new.

2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, visual signal strobes, microphone, speaker device, and associated wiring and conduit.

2.1.4.5. Remove and reinstall existing fire alarm building transmitter, antenna, and lighting arrester with new wiring and conduit.

2.1.4.6. Replace existing telephone outlets and cover plates with new.

2.1.4.7. Replace existing CATV outlets and cover plates with new.

2.1.4.8. Remove and reinstall existing CCTV system, cameras and LCD television. Replace CCTV wiring and conduit with new.

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

None

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

PROJECT NO TITLE LOCATION

97606 Repair building No. 4025 CAMP HOVEY

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

A‐

Changes to the Standard Technical Detail Specifications: None

TP II-1

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

97606 Repair building No. 4025 CAMP HOVEY

1. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

2. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

TP III-1

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention

Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.

Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

TP III-2

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW

COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

TP III-3

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

TP III-4

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 calendar days after notice to proceed(NTP) is issued. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

Section G - Contract Administration Data

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

Section J - List of Documents, Exhibits and Other Attachments

APPENDIX A

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL- DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No. Sheet No. Description Date

1 T-1 TITLE SHEET 22 JUL 20

2 T-2 TITLE SHEET 22 JUL 20

CIVIL

3 C-1 LOCATION PLAN AND GENERAL NOTES 22 JUL 20

4 C-2 SITE LAYOUT PLAN AND SCOPE OF WORK 22 JUL 20

5 C-3 SHADE SHELTER 22 JUL 20

6 C-4 MISC. DETAILS - 1 22 JUL 20

7 C-5 MISC. DETAILS - 2 22 JUL 20

ARCHITECTURAL

8 A-1 1ST FLOOR PLANS AND GENERAL NOTES 22 JUL 20

9 A-2 2ND - 4TH FLOOR PLANS AND SCOPE OF WORK 22 JUL 20

10 A-3 ELEVATIONS AND SCOPE OF WORK 22 JUL 20

11 A-4 ELEVATIONS AND PICTURES 22 JUL 20

12 A-5 GENERAL SECTIONS 22 JUL 20

13 A-6 INTERIOR WALL SECTIONS-1 22 JUL 20

14 A-7 INTERIOR WALL SECTIONS-2 22 JUL 20

15 A-8 TYPICAL ENLARGED FLOOR PLANS 22 JUL 20

16 A-9 ENLARGED FLOOR PLANS AND FIRE RATED ACCESS 22 JUL 20

A-10

DOOR NOTES

INTERIOR ELEVATIONS-1

22 JUL 20

18 A-11 INTERIOR ELEVATIONS-2 22 JUL 20

19 A-12 INTERIOR ELEVATIONS-3 22 JUL 20

20 A-13 INTERIOR ELEVATIONS-4 AND DETAILS-1 22 JUL 20

21 A-14 DETAILS-2 22 JUL 20

22 A-15 DETAILS-3 22 JUL 20

23 A-16 DETAILS-4 22 JUL 20

24 A-17 KITCHEN CABINET DETAILS 22 JUL 20

25 A-18 CLOSET DETAILS 22 JUL 20

26 A-19 INTERIOR, EXTERIOR FINISH SCHEDULE AND 22 JUL 20

A-20

MATERIAL & COLOR SCHEDULE

DOOR, WINDOW & LOUVER SCHEDULE AND

A-21

HARDWARE SCHEDULE

DOOR, WINDOW & LOUVER ELEVATIONS, NOTES

A-22

AND DETAILS

SIGNAGES SCHEDULE

MECHANICAL

30 M-1 LEGEND & ABBREVIATION 22 JUL 20

31 M-2 GENERAL NOTES & SCOPE OF WORK 22 JUL 20

32 M-3 EQUIPMENT SCHEDULES - 1 22 JUL 20

33 M-4 EQUIPMENT SCHEDULES - 2 22 JUL 20

34 M-5 EXISTING AND REMOVAL MECHANICAL PLAN 22 JUL 20

35 M-6 NEW H.V.A.C PLAN (1st FLOOR) 22 JUL 20

36 M-7 NEW H.V.A.C PLAN (2nd - 3rd FLOOR) 22 JUL 20

37 M-8 NEW H.V.A.C PLAN (4th FLOOR) 22 JUL 20

38 M-9 MECH. ROOM DUCT PARTIAL PLAN, LAUNDRY 22 JUL 20

M-10

EXHAUST DUCT PARTIAL PLAN

NEW H.V.A.C PIPING PLAN (1st FLOOR)

40 M-11 NEW H.V.A.C PIPING PLAN (2nd - 3rd FLOOR) 22 JUL 20

41 M-12 NEW H.V.A.C PIPING PLAN (4th FLOOR) 22 JUL 20

M-13

M-14

MECH. ROOM PIPING PARTIAL PLAN, LAUNDRY &

MUD ROOM PLUMBING PIPING AND FUEL OIL PIPING

PARTIAL PLAN

NEW PLUMBING PIPING PLAN (1st FLOOR)

44 M-15 NEW PLUMBING PIPING PLAN (2nd FLOOR) 22 JUL 20

45 M-16 NEW PLUMBING PIPING PLAN (3rd FLOOR) 22 JUL 20

46 M-17 NEW PLUMBING PIPING PLAN (4th FLOOR) 22 JUL 20

47 M-18 BATH RM PLUMB. PIPING PARTIAL PLAN, LAUNDRY & 22 JUL 20

M-19

MUD ROOM PLUMBING PIPING ISOMETRIC DIAGRAM

BATH. RM. PLUMBING PIPING ISOMETRIC DIAGRAM

49 M-20 NEW FIRE PROTECTION PIPING PLAN (1st FLOOR) 22 JUL 20

50 M-21 NEW FIRE PROTECTION PIPING PLAN (2nd FLOOR) 22 JUL 20

51 M-22 NEW FIRE PROTECTION PIPING PLAN (3rd FLOOR) 22 JUL 20

52 M-23 NEW FIRE PROTECTION PIPING PLAN (4th FLOOR) 22 JUL 20

53 M-24 CONTROLS - 1 22 JUL 20

B‐

54 M-25 CONTROLS - 2 22 JUL 20

55 M-26 CONTROLS - 3 22 JUL 20

56 M-27 CONTROLS - 4 22 JUL 20

57 M-28 MECH ROOM AIR LEAKAGE TEST FLOW CHART AND 22 JUL 20

M-29

QUALIFICATION OF AIR LEAKAGE TESTING

MECH. DETAILS - 1

59 M-30 MECH. DETAILS - 2 22 JUL 20

60 M-31 MECH. DETAILS - 3 22 JUL 20

61 M-32 MECH. DETAILS - 4 22 JUL 20

62 M-33 MECH. DETAILS - 5 22 JUL 20

ELECTRICAL

63 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 22 JUL 20

64 E-2 NEW 1ST FL LIGHTING PLAN 22 JUL 20

65 E-3 NEW 2ND-4TH FL LIGHTING PLAN 22 JUL 20

66 E-4 LIGHTING FIXTURE DETAILS-1 22 JUL 20

67 E-5 LIGHTING FIXTURE SCHEDULE AND LIGHTING 22 JUL 20

E-6

FIXTURE DETAILS-2

NEW 1ST FL POWER PLAN

69 E-7 NEW 2ND-4TH FL POWER PLAN 22 JUL 20

70 E-8 TYPICAL MODULE ELEC. PLAN-A & PLAN-B, MECH. 22 JUL 20

E-9

RM POWER & CONTROL PLAN

NEW 1ST FL FIRE ALARM / MASS NOTIFICATION

E-10

SYSTEM PLAN

NEW 2ND-4TH FL FIRE ALARM / MASS NOTIFICATION

E-11

SYSTEM PLAN

NEW FIRE ALARM / MASS NOTIFICATION SYSTEM

E-12

DIAGRAM

NEW 1ST FL CCTV / CATV / TEL PLAN

75 E-13 NEW 2ND-4TH FL CCTV / CATV / TEL PLAN 22 JUL 20

76 E-14 CCTV SYSTEM DIAGRAM 22 JUL 20

A-3

APPENDIX B

APPENDIX "B"

List of materials for Material Approval Submittal

Submittal

Identification Description of Submittal

LC-1 Ready Mixed Conc. 240kg/cm2

LC-2 Steel Bar Reinforcing

LC-3 Base Course

LC-4 #8-150x150 WWF

LC-5 Hot mixed Asphalt Concrete #67

LC-6 CHERRY BLOSSOM TREE

LC-7 Granite Curb

LA-1 Vapor barrier, 0.1mm

LA-2 Waterproofing wall membrane with asphalt primer, compound & felt

LA-3 EIFS incl. mesh, base coat, finish coat and control joint

LA-4

Steel thermal insulated blast double door w/steel frame door size: 1,714 W X 2150 H X 44.5 Thk.

LA-5

Steel thermal insulated double door w/steel frame door size: 1,714 W X 2133 H X

44.5 Thk. w/louver

LA-6

Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X

44.5 Thk. 100 X 600 insulated fire glass

LA-7

Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X

44.5 Thk.

LA-8

Steel hollow core door, 3/4 hrs fire rate w/frame door size; 915W. X 2133H. X 44.5 Thk. 100 X 600 insulated fire glass

LA-9

Steel hollow core door, 1 hrs fire rate w/frame door size; 915W. X 2133H. X 44.5 Thk.

LA-10

Steel hollow core single door w/frame door size; 915W X 2133H. X 44.5 Thk., 100x600 tempered glass

LA-11

Wood solid core double door w/frame door size; 1,714W X 2133H X 44.5 Thk.

W/100 X 600 insulated glass

LA-12

Wood solid door, 20 Min fire rate door, w/frame door size; 864W. X 2133H. X 44.5 Thk.,STC door

Description of Submittal

LA-13

Wood solid core single door w/frame, 19mm under cut door size; 714W. X 2033H.

X 44.5 Thk.

LA-14

Hollow wood flush door, single sliding pocket door w/wood frame door size; 914W X 2133H X 34.9 Thk. Mirror Glass 600x1200

LA-15 Wood full louver door with wooden frame;714W. X 2033H. X 44.5 Thk.

LA-16 Wood solid door w/frame door size; 900W X 2085H X 44.5 Thk

LA-17

Electronic card key lockset,HT-24 ONITY Co.,4ea card key, 3ea mechanical key, master key system including 4ea of battery

LA-18 Exit device, type 2, F-01

LA-19 Exit device, type 2, F-08

LA-20 Lockset, F-07

LA-21 Lockset, F-75

LA-22 Lockset, F-76

LA-23 Lockset, F-82

LA-24 Lockset, F-86

LA-25 Dead bolt, E0161

LA-26 Dead bolt, E0151

LA-27 Sliding door lock, E8231

LA-28 Door closer, C02021

LA-29 Door closer, C02011

LA-30 Hinge, butt, 127X114 (NRP)

LA-31 Hinge, butt, 114X114 (NRP)

LA-32 Hinge, butt, 114X114

LA-33 Hinge, B013514

LA-34 Door stop & holder L01371

LA-35 Door holder , L01381

LA-36 Door stop , L02161

LA-37 Door stop , L02141

LA-38 Push plate, J301

LA-39 Pull plate, J405

LA-40 Door pull, J401

LA-41 Automatic door bottom Roy 335

LA-42 Kick plate, J102

LA-43 Door viewer, L03221

LA-44 Flush bolt, L04081

LA-45 Astragal

LA-46 Adjustable astragal

Description of Submittal

LA-47 Soundproof seal R0Y265 for head and jam

LA-48 Weather stripping, R0y165&415

LA-49 Card holder, AL, 125 x 125

LA-50 Plexi-info holder, acrylic case, 224 x 287 x 6THK w/double emulsion form tape

LA-51 Threshold, aluminum, 150W, SGL

LA-52 Threshold, aluminum, 150W DBL

LA-53 SSM Thresholder, 150w x 800mm

LA-54 Key box, E8351

LA-55 Box Track Support D8271 & D8281

LA-56 Semi Auto Closing system, sliding, DAIKEN HLS-80

LA-57 Sliding door lock, E8231

LA-58 Door pull, D8421

LA-59

Aluminum blast window thermal break type, sliding window, 1220x1016, 26.75thk Low-e insulated glass, insect screen

LA-60

Aluminum blast window thermal break type, sliding window, 1061x900, 26.75thk Low-e insulated glass, insect screen

LA-61

Aluminum blast window thermal break type, sliding window, 610x1061, 26.75thk Low-e insulated glass, insect screen

LA-62

Aluminum sliding window thermal break type, sliding window, 1200x1016, 24.3thk Low-e insulated glass, insect screen

LA-63

Aluminum sliding window thermal break type, sliding window, 1220x1016, 10 THK tempered glass

LA-64 Horizontal blinds, 1" aluminum slats

LA-65 C-150 x 75 x 25 x 3.2 (8.27kg/m)

LA-66 Chemical Anchor M-08

LA-67 Metal stud, 0.8 mm x 45 mm x various W/expansion bolt

LA-68 Metal runner, 0.8 mm x 45 mm x various W/expansion bolt

LA-69 Metal ceiling suspension system for GWB

LA-70 Acoustical ceiling suspension system, aluminum

LA-71 Gypsum board, 15mm thk x1,200 x2,400, normal

LA-72 Gypsum board, 15mm thk x1,200 x2,400, fire resistant or X

LA-73 Gypsum board, 12mm thk x1,200 x2,400, normal

LA-74 Gypsum board, 12mm thk x1,200 x2,400, water resistant or X

LA-75 Gypsum board, 12mm thk x1,200 x2,400, fire rated

LA-76 Acoustical tile, 600x600x16mm thk.

LA-77 Non-sip ceramic floor tile

LA-78 Epoxy joint grout mortar

Description of Submittal

LA-79 Glazed ceramic wall tile with accessories

LA-80 Quarry tile and quarry tile base

LA-81 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk

LA-82 Vinyl cove base w/adhesive

LA-83 Rubber stair treads, 480 x 1200 x 3THK

LA-84

Rubber tile, size 500mm x 500mm x 3 THK, I-BADKA rubber flooring

LA-85 Rubber Base, 2THK

LA-86 Rubber stringer & risers, 178mm H X 2 THK

LA-87 Adhesive for flooring

LA-88 Paint, MPI 57, varnish

LA-89 Paint, MPI 11, acrylic emulsion, exterior

LA-90 Paint, MPI 54, latex, interior

LA-91 Paint, MPI 47, enamel, interior

LA-92 Paint, MPI 94, enamel, exterior

LA-93 Paint, MPI 79, primer for metal

LA-94 Texture coat, terracotta 25kg w/finish coat

LA-95

Noroo Paint, MPI 77, Epoxy Epoxy Paint Include Surface Preparation Base, Cleanpoxy3100, MPI77, 0.175L/M2 Mid, Cleanpoxy3100, MPI77,0.15L/M2 Top, Cleanpoxy3100, MPI77,0.15L/M2

LA-96 Toilet tissue dispenser, Double Roll, Horizontal Type

LA-97 Paper towel dispenser

LA-98 Towel bar

LA-99 Soap holder, recessed type

LA-100 Mirror, 1000 x 1420 with plywood back board

LA-101 Shower curtain with rod, 1,800W Curtain

LA-102 Medicine cabinet with mirror, 410MMx510MM

LA-103 Soap dispenser, liquid, wall type, SST

LA-104 Mop rack with STS shelf

LA-105 SST metal shelf for laundry room, 3500 x 300 with accessories

LA-106 S.M.L.D (Shelf Metal Light Duty)

LA-107 Brass hook, STS & Wood, 3450mm LG, 8 Hooks

LA-108 Signage, interior

LA-109 Signage, exterior

LA-110 Card holder, AL, 125 x 125

Description of Submittal

LA-111 Plexi-info holder, acrylic case, 224 x 287 x 6THK w/double emulsion form tape

LA-112 Kitchen Cabinet base & top, SSM Counter Top W/Plastic Laminate Finish

LA-113 Vanity cabinet, laminated counter top

LA-114 Wooden shelf w/STS hanging rod for closet

LA-115 Window trim, oak, 110W x 90W x 18Thk

LA-116 Wooden hanging rail, oak, 100W x 40Thk

LA-117 Plastic laminated

LA-118 Fire extinguish cabinet

LA-119 Plywood 18T with plastic laminate

LA-120 Acrylic fluid applied waterproofing

LA-121 Fiber glass, FG. 24K. 100mmThk

LA-122 Fiber glass, blanket w/VB. FG. 24K. 50mmThk

LA-123 EPDM roof 1.52T, Insulation 110T and top coating

LA-124 Access door, 250x250

LA-125 Access door, 450x450

LA-126 Access door, 600x600

OA-1

Wood solid door, 45 Min Fire Rate Door, door size; 1066W. X 2133H. X 44.5 Thk., 100x600 fire glass

OA-2 Sound absorption wall panel, Tectum standard, 50T

OA-3 Exit device, type 3, F-08

LM-1 Air Cooled Water Chiller

LM-2 Air Handling Unit, various capacity

LM-3 Split type air conditioning unit

LM-4 Fan coil unit, various capacity

LM-5 Thermostat for FCU

LM-6 Balacing valve cock

LM-7 Ball valve cock

LM-8 Fresh air wall box w/ motorized air demper

LM-9 Flue vent

LM-10 Black steel pipe line including fittings & pipe hangers, various size

LM-11 Pipe flexible cellular insulation w/adhesive, various size

LM-12 Gate valves, various size

LM-13 Balancing valve, various size

LM-14 Y-type strainer

LM-15 Diffusers, various size

LM-16 Registers, various size

LM-17 Duct w/accessories, various size

Description of Submittal

LM-18 Duct insulation w/accessories, various size

LM-19 Volume dampers, various size

LM-20 Pipe flexible connector

LM-21 Volume dampers, various size

LM-22 Water closets

LM-23 Lavatories w/ faucet

LM-24 Shower units

LM-25 Kitchen sinks w/ faucet

LM-26 Laundry sinks, double compartment

LM-27 Service sinks with faucet

LM-28 Hot water storage tank

LM-29 Water hammer arrester, various size

LM-30 Copper tube water line, including fittings & pipe hangers, various size

LM-31 Galvanized steel pipe with fittings & hangers, various size

LM-32 Vent thru roof

LM-33 Cast iron soil pipe with coupling incl accessories, various size

LM-34 P-trap, cast iron soil pipe, various size

LM-35 Floor cleanouts, various size

LM-36 Floor drains

LM-37 Grooved 90, elbow, various size

LM-38 Grooved tee, various size

LM-39 Grooved cap

LM-40 Grooved coupling, various size

LM-41 Valve flange adapters, various size

LM-42 Clevis pipe hanger, various size

LM-43 4-way bracing, various size

LM-44 Pipe support

LM-45 Hanger rod

LM-46 Sprinkler system shop drawing, calculatio, test & report

OM-1 Hot Water Boiler

OM-2 Hot water circ. Pump

OM-3 Domestic hot water circ. pump

OM-4 Domestic hot water re-circ. pump

OM-5 In-line duct mounted fan, various capacity

OM-6 Ceiling mounted exhaust fan, various capacity

OM-7 Roof mounted exhaust fan, various capacity

OM-8 Unit heater

Description of Submittal

OM-9 Elec. Unit heater

OM-10 Expansion tank

OM-11 Air separator

OM-12 Chemical feeder

OM-13 O.A. moptorized damper motor

OM-14 Duct mounted heating thermostat

OM-15 Freezestat

OM-16 7-day timer

OM-17 O.A. thermostat

OM-18 Ventilation thermostat

OM-19 Aquastat for pipe mtd

OM-20 Duct mounted smoke detector

OM-21 Pressure gauge

OM-22 Auto air vent

OM-23 Pressure gauge

OM-24 Suction diffuser

OM-25 Range hood

OM-26 Electric water cooler

OM-27 Backflow preventer

OM-28 Pressure reducing valve

OM-29 3-way thermostatic mixing valve

OM-30 Hose bibb

OM-31 Washer connector box

OM-32 Alarm check valve

OM-33 Backflow preventer

OM-34 OS & Y valves, various size

OM-35 Tamper switch

OM-36 Ball valve switch

OM-37 Pressure switch

OM-38 Water motor alarm bell

OM-39 Check valve

OM-40 Fire department connection

OM-41 Ball drip valve

OM-42 Teat header

OM-43 Hose valve w/cap & chain

OM-44 Test valve

OM-45 Water flow switch

B‐8

Description of Submittal

OM-46 Sight glass

OM-47 Smooth bore corrosion resistant

OM-48 Residential pendent sprinkler head

OM-49 Quick response pendent sprinkler head, various size

OM-50 Quick response up-right sprinkler head, various size

OM-51 Quick response dry wall type sprinkler head

OM-52 Spare sprinkler head cabinet

LE-1 Lighting fixture, exit sign stencil face LED, red lamp, LED lamp, type "NS-3"

LE-2 LED lighting fixture, 25 Watt, recessed mounted, type "NS-4a & 4b", power unit

LE-3 LED lighting fixture, 45 Watt, recessed mounted, type "NS-5a & 5b", power unit

LE-4 LED lighting fixture, 18 Watt, surface mounted, type "NS-6", power unit, wet location

LE-5

LED lighting fixture, 18 Watt ,wall mounted, type "NS-7",power unit (AC to DC), mirror top

LE-6

LED lighting fixture, 18 Watt, recessedl mounted, type "NS-8",power unit (AC to DC), down light

LE-7 LED lighting fixture, 50 Watt , pendant mounted, type "NS-9a & 9b", power unit

LE-8

LED lighting fixture, 18 Watt, recessedl mounted, type "NS-10",power unit (AC to DC), down light w/dimming control

LE-9 LED lighting fixture, 50 Watt, recessed mounted, type "NS-11a & 11b", power unit

LE-10

LED lighting fixture, 45 Watt, surface mounted, type "NS-12a & 12b", power unit, down light

LE-11 LED lighting fixture, 22 Watt, wall mounted, type "NS-13", power unit, exerior type

LE-12 LED lighting fixture, 18 Watt , type "NS-14",power unit (AC to DC), under cabinet

LE-13 SingleJack Outlet for "Telephone" system

LE-14 Coaxial Cable, RG11/U

LE-15 Coaxial Cable, RG6/U

LE-16 Pullbox w/ 8-way tap off and locking device

LE-17 Cable TV Outlets w/screw-tight cover

LE-18 Electric wires various

LE-19 Rigid steel conduit various

LE-20 Shop drawing for fire alarm control system

OE-1 Toggle switch, w/plate, 1P-20A-120VAC

OE-2 3-way toggle switch, w/plate, 1P-20A-120VAC

OE-3 Dimmer switch

OE-4 3-position sellector switch, "HAND-OFF-AUTO", "WP" housing

OE-5 Photoelectric control , 1P-120V, 1800 Watt max.

OE-6 Duplex receptacle, w/plate, 2P-20A-125VAC, gnd. Type

W91QVN20R0218

Description of Submittal

OE-7 Single receptacle, w/plate, 2P-20A-125VAC, gnd. Type

OE-8 Duplex receptacle, w/plate, 2P-20A-125VAC, GFCI Type

OE-9 Single receptacle, w/plate, 3P-30A-4W-125/250VAC, gnd. Type

OE-10 Single receptacle, w/plate, 4P-30A-4W-125/250VAC, gnd. Type

OE-11 Single receptacle, w/plate, 3P-50A-4W-125/250VAC, gnd. Type

OE-12 Safety switch, 3PST 600A-240V, 450A fuses, NEMA 3R. Encl

OE-13 Combination type magnetic motor starters

OE-14 Magnetic motor starters

OE-15 Manual motor starter

OE-16 Branch ciircuit breakers

OE-17 Advanced watt hour meter

OE-18 CATV cabinets

OE-19 Addressable fire alarm/mass notification control panel

OE-20 Addressable smoke detector w/sound base

OE-21 Combination fire alarm & MNS Speaker/Strobe

OE-22 Combination fire alarm & MNS Speaker "WP"

OE-23 Addressable module

OE-24 Addressable manual pull station

OE-25 Addressable carbon monoxide detector

OE-26 Coaxial cable, w/connector, type 1 and 2

Section K - Representations, Certifications and Other Statements of Offerors

CLAUSES INCORPORATED BY REFERENCE

52.203-2 Certificate Of Independent Price Determination APR 1985

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2020)

The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items.

(a) Definitions. As used in this provision-

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."

(d) Representations. The Offeror represents that--

(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--

It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.

(e) Disclosures.

(1) Disclosure for the representation in paragraph (d)(1) of this provision.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .