Drawing_W91QVN18R0250.pdf
PDF 486 KB Posted
- Attached to
- Install Windows, Building 2409
- Solicitation number
- W91QVN18R0250
About this file
DRAWING
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Dutch_Door_Drawing.PDF | ||
| Amendment_W91QVN-18-R-0250-0001.pdf | ||
| Submittal_Register_W91QVN18R0250.pdf | ||
| W91QVN-18-R-0250.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ARCHITECTURAL
MANUFACTURES INDICATED.
PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE
COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.
ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).
CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS
FOR APPROVAL.
CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR
CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE
SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD
8.
2.
3.
4.
5.
6.
7.
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER.
IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT, THE GENERAL
AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.
THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION
OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE OF THE STRUCTURE.
APPROPRIATE TEMPORARY SUPPORTS SHOULD BE CONSTRUCTED PRIOR TO DEMOLITION
DETAILS AND GET APPROVAL FROM COR. BEFORE FABRICATION AND INSTALLATION.
CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW
GENERAL NOTES
FROM THE MANUFACTURE SHOWING THE PRODUCT IS LEAD FREE.
A CERTIFICATE OR MATERIAL SAFETY DATA SHEET (MSDS), WRITTEN IN ENGLISH,
SOLIDS) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR WILL PROVIDE
COATINGS WITH LESS THAN 0.05 PERCENT LEAD BY WEIGHT OF THE NON-VOLATILE
THE CONTRACTOR IS REQUIRED TO USE "LEAD FREE" COATINGS (LIQUID PAINTS OR
DOCUMENTATION TO 8 CES/CEAN.
THE CONTRACTOR SHALL PROVIDE THE NEW SURVEY REPORT AND ASBESTOS REMOVAL
ACCORDANCE WITH THE KOREA ENVIRONMENTAL GOVERNING STANDARD (KEGS).
PRIOR TO ANY WORK TO ASSURE THAT APPROPRIATE ASBESTOS CONTROL IS IN
AREA WILL NEED TO BE RESURVEYED AND ASBESTOS MATERIALS SHOULD BE REMOVED
WORK IN THE AFFECTED AREA AND NOTIFY THE CONTRACTING OFFICER. THE WORK
ASBESTOS CONTAINING MATERIAL ARE DISCOVERED, THE CONTRACTOR SHALL CEASE
IS NOT PRESENT IN THE AREAS AFFECTED BY THIS WORK: HOWEVER, IF SUSPECTED
VERIFYING THE PRODUCT IS ASBESTOS FREE. TESTS HAVE INDICATED THAT ASBESTOS
WILL PROVIDE A CERTIFICATE OR MSDS, WRITTEN IN ENGLISH, FROM THE MANUFACTURER
PERCENT BY WEIGHT) DURING THE EXECUTION OF THIS PROJECT. THE CONTRACTOR
THE CONTRACTOR IS REQUIRED TO USE "ASBESTOS FREE" MATERIALS (LESS THAN 0.1
UP
CORRIDOR-2
ELEV
B/B
TOILET
WOMEN
TOILET
MEN
JAN
STAIR -1
CONFERENCE ROOM
212CABINET
FILE
A/V
BREAK ROOM
COMM
STAIR-2
STAIR -3
CORRIDOR-1
HALL
CORRIDOR-3
FEC
FEC
207a
CLOSET
ELEC
TOILET
WOMEN
TOILET
MEN
CLOSET
SLOPE
3/12
S L
O P
E
DS
DS
DS
DS
FED OFFICE
213-1 CHIEF
411 CSB
OFFICE
411 CSB
MEETING ROOM
411 CSB
SIPR ROOM
411 CSB
215-1
BREAK ROOM
411 CSB
214-1
FILE CABINET
FED
OFFICE
BO & I CHIEF
W3 W1 W2 W1
,9
,0
,5
61,000
15,3007,5857,6157,6007,6007,6007,700
SCALE: 1/100
9.
NCOIC OFFICE
ADMIN STAFF
OFFICE
DIRECTOR
OFFICE
S /S
CAMP CASEY
INSTALL WINDOWS FOR BLDG S-2409
YI, SC
196558
AND GENERAL NOTES
2ND FLOOR PLAN
2ND FLOOR PLAN @ BLDG S-2409
A-2
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ARCHITECTURAL
CAMP CASEY
INSTALL WINDOWS FOR BLDG S-2409
YI, SC
196558
DN
B/B
409a
CORRIDOR-1
ENGINEERING
CHIEF OFFICE
PM
& ADMIN
OFFICE
ELEV
CONTROL RM
WOMEN
TOILET
MEN
TOILET
JAN
COMM
ELEV
CIO OFFICE
CIO CHIEF
OFFICE
STAIR -3
STAIR -1
STAIR-2
DESIGN CHIEF
OFFICE
DESIGN OPEN
OFFICE
407 418
CIO
STORAGE
HALL
CORRIDOR-3
ELEC
CLOSET
ROOM
BREAK
ROOM
FEC
FEC
COFERENCE
ROOM
S /S
ENERGY
61,000
15,3007,5857,6157,6007,6007,6007,700
,9
,0
,5
W1W1
SCALE: 1/100
4TH FLOOR PLAN
4TH FLOOR PLAN @ BLDG S-2409
A-3
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
ARCHITECTURAL
SCOPE OF WORKS (ARCHITECTURAL WORKS)
1.
2.
3.
REMARKS
WIDTH
MATERIAL
TYPENOS.
ROUGH OPENING
WIDTH HEIGHT
HDW
SET
THICKHEIGHT NO (HR)
RATED
FIRE
LOUVERGLAZING
CUT
UNDER
FRAME
2.
3.
5.
4.
HEAT GAIN AND FIRERATED.
WHITE OR LIGHT BEIGE TO MAXIMIZE REFLECTANCE AND MINIMIZE
BE EQUIPPED WITH HORIZONTAL MINI BLINDS. COLOR SHALL BE
WINDOWS IN ALL AREAS WHERE FUNCTIONALLY WARRANTED SHALL
1.
INSECT SCREEN SHOULD BE EQUIPPED TO ALL EXTERIOR WINDOWS.
HIGH QUALITY AND GRADE PRODUCTS WITH APPROVAL TO COR.
& QUALITY ARE NOT REQUIRED. BUT CONTRACTOR SHOULD INSTALL
AN EXACT MATCH OF THE MANUFACTURERS FUNCTION, GRADE, COLOR,
AND ARE NOT INTENDED TO LIMIT SELECTIONS OF PRODUCTS.
MANUFACTURERS LISTED ARE FOR IDENTIFICATION PURPOSES ONLY
10001600ALGLASSA - -------W1
( SHGC : MAX 0.4 )
+ 6 THK TINTED LOW-E TEMPERED GLASS
+ 12 THK AIR SPACE
: 8.75 THK CLEAR LAMINATED GLASS
TYPICAL INSULATED/LAMINATED GLASS FOR WINDOWS
VERIFY BY BLAST WINDOW MFR
4.
WINDOW SCHEDULE
WINDOW ELEVATIONS
FIN FL
(ANODIZED DARK BRONZE)
AL BLAST WINDOW
(THERMAL BREAK TYPE)
W/ INSECT SCREEN
- PEAK REFLECTED PRESSURE
: 40.6 KPA
- PEAK IMPULSE
: 210 KPA-MS
A
5.
FIN FL
(ANODIZED DARK BRONZE)
AL BLAST WINDOW
(THERMAL BREAK TYPE)
W/ INSECT SCREEN
- PEAK REFLECTED PRESSURE
: 40.6 KPA
- PEAK IMPULSE
: 210 KPA-MS
B
WINDOW WINDOW
WINDOW
WINDOW DIMENSION
10001300ALGLASSA - -------W2 VERIFY BY BLAST WINDOW MFR
1000600ALGLASSB - -------W3 VERIFY BY BLAST WINDOW MFR
FABRICATION AND INSTALLATION
SHALL BE APPROVED BY THE CONTRACTING OFFICER BEFORE
ALUMINUM WINDOWS AS ACTUAL SIZE, AND DRAWINGS
THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL
WINDOW NOTES
CAMP CASEY
INSTALL WINDOWS FOR BLDG S-2409
YI, SC
196558
INSTALL WINDOW HORIZONTAL MINI BLINDS WITH NEWS, FIREPROOF TYPE IN RM NO 215.
AS SHOWN ON FLOOR PLAN AND WINDOW SCHEDULE.
REPLACE GWB INCLUDING METAL STUDS AND CORNER BEAD AROUND WINDOWS IN RM NO 215
WINDOW SCHEDULE.
PAINT ON GWB WALL AROUND WINDOWS IN RM NO 215 AS SHOWN ON FLOOR PLAN AND
AND SCOPE OF WORKS
WINDOW SCHEDULE, ELEVATIONS, NOTES
FIXED AND TILTING FIXED AND TILTING
METAL FLASHING IN RM NO 215 AS SHOWN ON FLOOR PLAN AND WINDOW SCHEDULE.
REFINISH EIFS OF EXTERIOR WALL AROUND WINDOW OPENINGS INCLUDING INSTALL PROTECTED
SCHEDULE.
GLASS ( SHGC : MAX 0.4 ) IN RM NO. 215 AS SHOWN ON FLOOR PLAN AND WINDOW
CLEAR LAMINATED GLASS + 12 THK AIR SPACE + 6 THK TINTED LOW-E TEMPERED
INSTALL NEW ALUMINUM THERMAL BREAKER TYPE BLAST WINDOWS INCLUDING 8.75 THK
CONSTRUCTION (L) WORKS
| 196558-Install windows for bldg 2409, CP Casey-A-1 |
| 196558-Install windows for bldg 2409, CP Casey-A-2 |
| 196558-Install windows for bldg 2409, CP Casey-A-3 |
File details come from the government source that posted it.