Question and Answer Document

View the file

Other files

File Type Posted
W91QVN-18-R-0020-0003.pdf PDF
W91QVN-18-R-0020-0002.pdf PDF
Questions_and_Answers.pdf PDF
W91QVN-18-R-0020-0001.pdf PDF
Attachment_3_SAMPLE_Task_Order_Drawing.pdf PDF
Attachment_4_SAMPLE_Task_Order_SOW_.doc DOC document
W91QVN-18-R-0020.pdf PDF
Attachment_2_SAMPLE_Task_Order_Bidding_Schedule.xls XLS spreadsheet
Attachment_1_(Master_Bidding_Schedule)_.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

Q. Is there an incumbent?

A. No, there is no incumbent for this requirement.

Attachment #1 (Master Bidding Schedule) Item No. 0006 Exterior Site Works:

Q.1. Sub item AD, Concrete sidewalk, 6’ wide:

How thick is the sidewalk? Does the price include NFSM and WWF?

A: It shall be complied with OMA standard drawing as stated in the solicitation. 4 inch

Q.2. AE, Asphalt pavement incl. tack or prime coat:

How thick is the asphalt pavement?

A: It depends on the traffic load of road. The unit of this line item indicates “Ton”.

Thickness of pavement will be specified in each task order.

Q.3. AI, Solid sodding with watering:

Does the price include top soil? How is the duration of watering?

A: Top soil does not include the CLIN. Duration of watering is determined by KTR’s quality control.

KTR is responsible to maintain good quality of sodding until final acceptance inspection.

Q.4. AJ, Hydro seeding with watering, and cover sheet:

How is the duration of watering?

A: Same answer from Q.3.

Q.5. Borrow backfill soil incl. transportation:

How far is the transportation distance?

A: Borrow site 10 KM at maximum will be considered.

Q.6. AN, AO, AP, AQ, AT, AU, AV, AW, AX, AY, BJ, BK, BL:

Does the price include excavation and backfill? If yes, how is the depth of excavation respectively?

A: CLINs do not include excavation and backfill.

Q.7. AR, Concrete manhole:

How is the depth of manhole?

A: It will be applied to typical depth of manhole. (2.1m)

Q.8. BE, Construction joint incl. dowel bar in Portland cement concrete work:

How is the size of dowel bar? How is span of OC(on center) of dowels?

A: Please look into OMA Standard Drawing for the information.