A21_W91QVN-16-T-0084-0001.pdf

PDF 360 KB Posted

Attached to
CARPET & PAINT, CP TANGO
Solicitation number
W91QVN-16-T-0084
Issued by

About this file

See attached solicitation amendment No. 0001.

View the file

Other files

File Type Posted
A21_W91QVN-16-T-0084-0002.pdf PDF
A21_W91QVN-16-T-0084.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - CONST & SUPPLY TEAM

POC: MR. SOK, HAN OL

TEL: 02-7914-8063

HANOL.SOK.LN@MAIL.MIL

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

0010851386

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See next page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Apr-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN-16-T-0084

X 9B. DATED (SEE ITEM 11)

07-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Apr-2016

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91QVN

FACILITY CODECODE

EMAIL:TEL:

W91QVN-16-T-0084

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGE_AMD0001

1. The purpose of this amendment No. 0001 of the solicitation is to revise item description for CLINs 0001 and 0002 as below. The changed potion was specified as in red ink and underline.

2. All other terms and conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

1. Scope of Work:

The work described herein is to cover the government’s requirement to remove existing carpet, install new carpet and paint a wall for CP TANGO Balcony as shown in the Layout.

2. Salient Characteristics for Requirements: See the Tables for Salient Characteristics.

3. Requirements:

The contractor shall perform all work required by this PWS.

3.1 Pre-Installment Meeting: The contractor shall be responsible for scheduling and conducting a pre-installation meeting on site to plan and coordinate the project within 3 days after award of the contract.

3.2 Protection of Property and Working Hours: The contractor is responsible for all subsequent damages incurred while performing the carpet installation and painting the walls. The working hours will be Monday through Friday from 8:00 AM to 4:30 PM unless otherwise stated by the

Government. The Contractor must have an unescorted access pass into CP TANGO gate and the

Government will escort contractors while working in the Sensitive Area of CP TANGO.

See revised salient characteristics in red color and underlined.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 lot ₩ ₩

REMOVE EXISTING CARPET AND INSTALL NEW CARPET

(117 SQUARE METER)

MFR: SWAN CARPET, MODEL# RQ172, OR EQUAL.

FACE FIBER: NYLON BCF100%, THICKNESS: 9.0MM (±0.5MM), TUFTED YARN WEIGHT: 1,152G/M2 (±5%), Install Carpet Cushion Pads before installing carpet.

Install Non-Slip Stair Edging on the stair surfaces.

COLOR SHALL BE THE SAME AS THE EXISTING CARPET COLOR. ENVIRONMENTAL CERTIFICATION: 'GREEN LEVEL PLUS', FROM

THE CARPET AND RUG INSTITUDE (CRI)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 lot ₩ ₩

PAINTING WALL (161 SQUARE METER )

MFR: SAMWHA, MODEL# MPI_49, OR EQUAL.

"ZERO" in VOLATILE ORGANIC COMPOUNDS (VOCS)

Sand, fill in, and paint the walls if there are any cracks on the walls.

BASE COAT PRIMARY AND OVERCOAT WHITE (TOP HALF) AND LIGHT BLUE (LOWER HALF) IN COLOR.