W91QVN-16-T-0020-0001.pdf

PDF 111 KB Posted

Attached to
WATER TANK TRUCK
Solicitation number
W91QVN-16-T-0020
Issued by

About this file

See attached solicitation amendment No. 0001.

View the file

Other files

File Type Posted
W91QVN-16-T-0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - CONST & SUPPLY TEAM

POC: MR. SOK, HAN OL

TEL: 02-7914-8063

HANOL.SOK.LN@MAIL.MIL

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

W8120T52040010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See naext page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Mar-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN-16-T-0020

X 9B. DATED (SEE ITEM 11)

07-Mar-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Mar-2016

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91QVN

FACILITY CODECODE

EMAIL:TEL:

W91QVN-16-T-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGE_AMD01

1. The purpose of this amendment No. 0001 is to post Questions and Answers.

Question 1:

The water tank capacity indicator. See the 27P in the bid document, Water tank needs the water tank capacity indicator. What type of the indicator do you want between the transparent bar type and circle type. Visuable type :

you can see the capacity of the water through the visuable pipe attached at the tank. Circle type : you can see the capacity through the graduation in the circle attached at the tank.

Answer 1: Any type of water tank capacity indicator is acceptable.

Question 2:

Use. Do you use this tank for carrying the drinking water? or for cleaning the road. So, If you use this tank for drinking water, I think you not need the watering bar under the cabin.

Answer 2: This vehicles are to transport drinking water. Doesn't need water spray capability.

Question 3:

Manhole. As you know, there is a manhole on the top of the tank, So, What type of this manhole do you want, between the manual or automatics ?

Answer 3: One of automatic and manual to operate the manhole is acceptable.

Question 4:

Standard for award. I'd like to know the standard for award. whether the standard is only price score before the specification and past performance or is including minimum specification and past performance score as well as price score.

Answer 4: See Basis of Award in page #26 of 28 pages in solicitation.

Question 5:

Technical proposal. In case of Technical proposal, How can I write this. Did I just write the specification whether we can meet the minimum specification or not ? or should I describe the detailed specification for proposal ?

Answer 5: See ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S), paragraph 2.a. in page #24.

Question 6:

Kanglim, Model # KWS-500. Could I get the specification of the KWS-500 ? or Just picture is ok.

If you let me get this information regarding KWS-500, It is very helpful to fill in the specification proposal.

Answer 6: Not available for specification and picture. You may contact the manufacture for specification or picture.

2. All other terms and conditions remain unchanged.

W91QVN-16-T-0020

(End of Summary of Changes)

File details come from the government source that posted it. Updated .