20160104_2_PRS.doc

DOC document 41 KB Posted

Attached to
Balnced Readiness Seminar Federal contract opportunity
Solicitation number
W91QF4-16-R-0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Leavenworth

About this file

Attachment 2

View the file

Other files for this federal contract opportunity

Other files attached to Balnced Readiness Seminar, newest first.
File Type Posted
20160203_Questions_v2.docx DOCX document
20160203_Comformed_Amendment_02.pdf PDF
20160202_Comform_Ammendment_01.pdf PDF
20160129_Combined_Questions_ _Answers.docx DOCX document
20160105_5_WD_05-2307_(Rev_18).pdf PDF
20160111_3_FY16_Schedule_FINAL_(3_SEP_15).pdf PDF
20160111_6_Staff_Matrix.xls XLS spreadsheet
20160111_7_Relevant_Contract_Form.doc DOC document
20160111_1_PWS_for_Posting.docx DOCX document
20160126_Released_Solicitation.pdf PDF
20160111_4_FY17_Schedule.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Balanced Readiness Seminar

Performance Requirements Summary

Task
Deliverable
Standard
Method of Surveillance

Task 1:

a. Using appropriate assessment tool(s) conduct an introspective holistic personal values assessment for each student.

b. Given a list of students and their contact information the contractor shall contact each student in order to provide access to the assessment tool(s) and to obtain any background information required in order to create the individual assessment.

Conduct the introspective holistic personal values assessment for each student. Each student receives a minimum 55 minute face-to-face session with a coach to go over their personal assessment and create/refine a personal development plan to address personal growth, issues or shortfalls.
Each student was contacted and provided access to the assessment tool(s). Each student received a face-to-face counseling and the chance to create a personal development plan.
100% Inspection
Task 2 - Contractor shall develop and instruct a minimum of a 1.5 day educational seminar
A 1.5 day seminar that covers the items listed in paragraph 5.2.1. Seminars will be conducted in small groups. Based on projected numbers, a minimum of six small groups will be required to run simultaneously
Contractor provides the instruction on time and in accordance with the approved POI/agenda
Student Feedback and Periodic Inspection
Task 3 - The coach that provided the individual feedback for the student shall contact the student telephonically by the end of the period of performance.
A telephonic contact with each student that may last up to 45 minutes.
The counselor contacts 100% of students.
Periodic Inspection

Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

File details come from the government source that posted it. Updated .