Attachment_1_-_RDSS_QASP_072019.docx

DOCX document 62 KB Posted

Attached to
RTC Directorate Support Services (RDSS) Federal contract opportunity
Solicitation number
W91CRB-18-R-0009
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

QASP

View the file

Other files for this federal contract opportunity

Other files attached to RTC Directorate Support Services (RDSS), newest first.
File Type Posted
W91CRB-18-R-0009_Amendment_2.pdf PDF
Attachment_2_-_RDSS_Labor_Category_Positions_&_Qualifications_&_Education_v6_012818.xlsx XLSX spreadsheet
W91CRB-18-R-0009_Amendment_0001.pdf PDF
Solicitation_Attachment_7_LOE_Spreadsheet-RFP.xlsx XLSX spreadsheet
Attachment_4_-_WD_2015-4603_(Rev_5).pdf PDF
Solicitation_Attachment_1_Summary__of_Experience_Form-RFP.docx DOCX document
Solicitation_Attachment_2_Resume_Format_March_2017.docx DOCX document
A003_Software_Design_Description.pdf PDF
A017__System_Subsystem_Specification.pdf PDF
A010_Drivers_Log.pdf PDF
A012_Contractor_Personnel_Roster.pdf PDF
A002_Presentation_Material.pdf PDF
A022__Schematic_Block_Diagrams.pdf PDF
Attachment_3_-_DD254.pdf PDF
A014_CFSR.pdf PDF
A015_Facility_Maintenance_Log.pdf PDF
Solicitation_Attachment_7_LOE_Spreadsheet-RFP.xlsx XLSX spreadsheet
A024___Training_Materials.pdf PDF
A004_CMRA.pdf PDF
A021__Software_Test_Report_(STR).pdf PDF
Attachment_5_-_RDSS_Training_Matrix.xlsx XLSX spreadsheet
A011_Mechanic_Log.pdf PDF
A007_Work_Products_As_Requested.pdf PDF
A025__Property_Control_Plan.pdf PDF
Solicitation_Attachment_6_OCI_Certification_March_2017.docx DOCX document
A001_Technical_Report.pdf PDF
A018__Software_Development_Plan.pdf PDF
A005_Conference_Minutes.pdf PDF
Attachment_4_-_Wage_Determination_March_2017.pdf PDF
W91CRB-18-R-0009_RDSS.PDF PDF
A009_Safety_Plan.pdf PDF
Solicitation_Attachment_4_Past_Performance_Questionnaire_March_2017.docx DOCX document
A019__Software_Test_Plan_(STP).pdf PDF
Solicitation_Attachment_5_Purchasing_System_Review_Form_March_2017.xlsx XLSX spreadsheet
A026_Transition-in_Status_report.pdf PDF
Solicitation_Attachment_3_Contract_References_Form_March_2017.xlsx XLSX spreadsheet
Attachment_2_-_Labor_Category_Positions_&_Qualifications_&_Education_v5_121517.xlsx XLSX spreadsheet
A016_Operational_Concept_Description.pdf PDF
A006_Conference_Agenda.pdf PDF
A020__Software_Test_Description_(STD).pdf PDF
A023___Product_Drawings-Models_and_Associated_Lists.pdf PDF
A008_Data_Reports_and_Documents_As_Requested.pdf PDF
Show all 42

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

FOR

REDSTONE TEST CENTER (RTC)

DIRECTORATE AND SUPPORT SERVICES

Issued April 4, 2017 i

QUALITY ASSURANCE SURVEILLANCE PLAN

INTRODUCTION

Vision Department of Defense premier Test Center, providing safe, timely, and cost effective test services in support of the Warfighter.

Mission RTC is one of the DODs premier test facilities supporting both military and commercial materiel developers by testing a broad spectrum of equipment throughout the life cycle, from concept through deployment. RTC has a mission to plan, conduct, analyze, and report the results of aviation systems, missile systems, sensor, subsystem and component developmental tests and studies. Test items associated with these mission areas consist of aviation systems, missiles, rockets, and explosives; instrumentation, computers, software, communications, and other electronics; small caliber to large caliber weapons; soldier and support equipment; and developmental technologies. RTC is an operational tenant on Redstone Arsenal (RSA) occupying approximately one-third of the land area, totaling over 13,500 acres, with an extensive inventory of specialized facilities. RTC is organized by Directorate competencies with over 1,000 personnel that consist of Government civilian, military, and Contractors.

Purpose The purpose of the Quality Assurance Surveillance Plan (QASP) is to describe the systematic methods the Government will use to evaluate Contractor actions while performing the requirements as laid out in the Performance Work Statement (PWS) for the RTC Directorate and Support Services (RDSS). The QASP provides a means for evaluating whether the Contractor is meeting the performance standards and acceptable quality levels identified in the PWS and identification of surveillance methods used to document the performance.

The QASP has been developed by Redstone Test Center (RTC) to provide direction to personnel performing contract surveillance activities. Personnel performing surveillance to the contract terms and conditions and PWS requirements will periodically review the QASP throughout the life of the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides details for a continuous oversight process as follows:

· What will be monitored

· How monitoring will take place

· Who will be conduct the monitoring

· How monitoring efforts and results will be documented The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.

The QASP is not part of the contract nor is it intended to duplicate the contractor's quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance. The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor. As a result, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.

Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by RTC’s contracting officer’s representative (COR) to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

Performance Management Strategy The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor’s QC process will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated Government representative. The Contractor’s QC process will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the Government to take advantage of the Contractor’s QC program. Contractor’s QC plan may be used as a guide for planning concurrent inspections, for reviewing the data gathered by the Contractor’s QC personnel, and other items as may be established by the Contractor’s QC program.

The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against performance objectives communicated in the PWS. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

Authority Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.

ROLES AND RESPONSIBILITIES

Division Chief / Program Manager The DC/PM provides primary program oversight, nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR's performance assessment activities. While the PM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government's behalf.

The Contracting Officer The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Government and the Contractor. The KO will designate one full-time Contracting Officer’s Representative (COR) as the Government authority for performance management.

The Contracting Officer’s Representative The COR is appointed and designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR may be held financially liable for unauthorized directions given to the Contractor. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance.

The Technical Representative A representative from the requiring activity that provides detailed technical oversight of the Contractor’s performance and reports his or her findings to the COR in a timely, complete, and impartial fashion to support the COR’s administration activities. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the Government to evaluate Contractor performance when appropriate. The primary methods of surveillance are:

· Random monitoring, which shall be performed by the COR.

· 100% Inspection as deemed necessary to support evaluation of performance on Technical Work Directives (TWDs), purchases to support performance, and deliverables.

· Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.

Customer Feedback Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. All customer complaints will be investigated to determine complaint validity. Valid customer complaints must set forth in writing the detailed nature of the complaint and must be signed and must be forwarded to the COR. The COR shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file. The COR shall also keep the tabulated results of all customer satisfaction surveys on file.

Acceptable Quality Levels The acceptable quality levels (AQLs) for Contractor performance are included in Appendix 1, Performance Requirements Summary Matrix. Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards.

QUALITY ASSURANCE DOCUMENTATION AND ASSESSMENT

Performance Assessment The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to identify the root cause and develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

Surveillance Forms The Government’s QA surveillance, accomplished by the COR, will be reported using the monitoring form in Attachments 2. The form, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure that the required services are being achieved. The COR will retain a copy of all completed QA surveillance forms.

Acceptance of Services When all services have been deemed acceptable and there is documented objective quality evidence to support acceptable performance, the COR will accept the services provided and authorize payment upon satisfactory completion of the work. This is done by approving the Contractors invoice in Wide Area Workflow https://wawf.eb.mil/.

Documentation The COR should maintain a personal log of visits made to the Contractor’s work location, when the visit occurred, who was in the area at the time of the visit, what was observed, and what the COR said to the Contractor. The COR must input and upload all inspection records into the VCE/COR tool.

Performance Issues The COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding unsatisfactory performance.

Resolution The COR and Contractor should jointly formulate tactical courses of action for corrective actions.

Reporting At the end of each month, the COR will prepare a written report for the KO summarizing the overall results of the quality assurance surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted monthly report and the completed quality assurance monitoring forms (Appendix 2), will become part of the COR documentation and must be uploaded into the VCE/COR tool. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives or performance standards, including cost, technical, scheduling objectives.

Contractor Manpower Reporting Application (CMRA). A designated COR will be appointed by the requiring activity to verify annual manpower information entered into the CMRA online application by the prime contractor. The Contractor is required to submit their manpower information by 31 Oct each fiscal year for the previous 12 months labor data. COR validation of contractor input is to be completed by 30 Nov each fiscal cycle.

Contractor Performance Assessment Reporting System (CPARS). At the completion of each annual performance period the COR will complete the CPARS report and submit via the online CPARS tool. The data will be input annually thereafter by the COR into the CPAR system prior to exercising the option for the next performance period. The COR will forward their CPAR assessment electronically to the KO who will review, add comments and forward to the contractor. The contractor has 30 days from receipt to concur, non-concur and/or make comments. The CPARS assessment will address, but is not limited to, the following elements:

· Quality of Service. Assess the contractors conformance to contract requirements, specifications and standards of good workmanship (e.g., commonly accepted technical, professional, environmental or safety/health standards).

· Schedule. Assess the timeliness of the contractor against the completion of the contract milestones, delivery schedules, test schedules or administrative requirements (e.g., efforts that contribute to or effect the schedule variance).

· Cost Control. Assess the Contractor’s performance in helping the government save money by improving processes, submitting value engineering change proposals, implementation of technical infusion and sustainment projects and seeking the best value on cost reimbursement items. For example, the evaluator will (1) compare actual cost center labor rates to contractor proposed labor rates to ensure that the costs reported by cost center are consistent with labor amounts reported on invoices submitted to Defense Finance and Accounting Service (DFAS), (2) assess how well the contract management team manages overall execution of service provided to include the elimination of non-value added activities and their cost, (3) measure the indirect to direct ratio to track overhead (O/H) cost increases and non-productive hours vs. non-productive hours.

· Business Relations. Assess the integration and coordination of all activity necessary to effectively execute the contract specifically the timeliness, completeness and quality of problem identification, corrective actions plans, proposal submittals, the contractors history of reasonable and cooperative behavior, customer satisfaction, timely award and management of subcontracts and whether the contractor met small/disadvantaged and woman owned business participation goals.

· Safety. This is a critical area and any safety violations or poor safety performance will result in an unsatisfactory rating. The evaluator will assess performance based on results of work place safety evaluations, accidents, injuries, and SOP/policy violations. Inspection of this element will be performed through observation of daily operations and analysis of reports. Inspection factors will include the following:

1. No safety violations resulting in an incident, OSHA reportable or more severe or a major incident.

2. No at-fault safety violations resulting in damage to Government property.

3. Incidents are reported appropriately and timely.

4. No more than three instances of SOP/Policy violations per quarter.

· Security. This is a critical area and any security violations involving classified defense information may will result in an unsatisfactory rating. This evaluation covers both Physical Security and COMSEC.

· Financial Liability for lost, damaged, stolen equipment - no at-fault violations resulting in damage/loss to Government property.

Other elements shall be assessed and entered in CPARS as required.

Levels of Performance Surveillance activities will monitor and measure contractor performance. The following levels of performance are defined below and will be used for this contract as follows:

1. Satisfactory Performance. When a contractors quality control program is effective, the resulting work performance can be expected to be satisfactory and within the specified AQL. If surveillance results show consistently good performance, the amount of surveillance can be decreased. If during a reduced inspection, a process is found to no longer be acceptable or the service becomes degraded, then the inspection frequency will increase.

2. Unsatisfactory Performance. If the number of complaints/defects exceeds the performance threshold for any objective, the COR will determine the possible cause and document findings. Government caused complaints/defects shall not be counted against the contractor. The same applies to any other requirement of the contract when government caused deficiencies negatively impact Contractor’s performance. If the contractors performance is judged unsatisfactory for any requirement in the contract, the COR will inform the contractors on-site representative and request his/her signature and date of notification on the QA inspection sheet or CDR as appropriate. Any dispute(s) will be directed to the KO for resolution. The Contractor will be given a timeline after notification to correct the deficiency in accordance with the requirements of the contract. The KO will make the final determination of the consequences of uncorrected deficiencies.

Documentation of unsatisfactory performance or non-conformance supplies or services shall be classified as critical, major, or minor. Critical and major non-conformances will result in issuance of a CDR to the contractor. The degree of non-conformance supplies or services is stated below as follows:

1. Non-Conforming Performance. All government discovered non-conformance shall be documented along with the contractor focal point notified of the discrepancy. Documentation of non- conformance shall include the contract number, contract requirement and reference, the specific deficiency to the requirements, the date and time it was discovered and government inspector (COR/TM) documenting the discrepancy.

2. Critical non-conformance is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; or is likely to prevent performance of a vital agency mission. Critical non-conformances require the issuance of a CDR to the contractor requiring the development of a corrective action plan by the contractor which identifies the root cause, corrective action for the root cause, corrective action for the specific nonconformance and the date the corrective action will be complete.

3. Major non-conformance is defined as a non-conformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Deficiencies that are recurring can also be classified as major. Major non-conformances require the issuance of a CDR to the contractor requiring the development of a corrective action plan by the contractor which identifies the root cause, corrective action for the root cause, corrective action for the specific nonconformance and the date the corrective action will be complete.

4. Minor nonconformance is defined as a non-conformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services which can be corrected on the spot. Minor non-conformances can be issued to the contractor verbally however they are still required to be documented by the government.

All non-conformances and corrective actions shall be tracked and followed by the COR to ensure that the contractor identifies the correct root cause and takes appropriate corrective action to include correction of the root cause. Contractors should not be penalized for self-identifying non-conformances but they will be held accountable for correcting the non-conformance. Government discovered non-conformance documentation must be maintained to support objective contractor performance ratings and used when analyzing data for performance trends.

Several forms or documentation methods shall be used to document contractor performance to include, but are not limited to, the following:

1. Contract Discrepancy Reports (CDR). The CDR will be used whenever necessary in the administration of the contract to formally document unacceptable performance. The COR will initiate a CDR (fill out blocks 1 thru 4 and attach any supporting documentation), forward it to the KO for signature (block 5). After KO review it will be forwarded to the Contractor for corrective action. The Contractor will submit corrective action, sign and return the CDR to the KO (blocks 6 thru 10). The KO will review the Contractor’s response and determine acceptance/rejection and finalize the CDR (blocks 11 and 12) and close out form. The COR will initiate a CDR, as a minimum, whenever unacceptable performance is determined critical in nature and requires immediate corrective action or trends develop in unacceptable performance (repetitive deficiencies) are recorded and require corrective action.

2. Customer Complaint Record (CCR). The CCR will be used in conjunction with the customer feedback database to document unsatisfactory performance. CORs will instruct TMs and customers on the proper completion of the CCR. The COR will validate each customer complaint before corrective action can be taken. The customer feedback database will also be used to document excellent performance and this database will be made available in a read only format to upper level contractor management team to monitor positive and negative performance feedback.

3. Customer Feedback. The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints. Customer feedback may also be obtained from the results of formal customer satisfaction surveys or from random customer complaints. Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR or TM, as opposed to the contractor. Customer complaints, to be considered valid, must clearly present in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate them.

List of Attachments

· Appendix 1, Performance Requirements Summary (Surveillance Matrix)

· Appendix 2, Contract Inspection Checklist

· Appendix 3, Corrective Action Report (CAR)

· Appendix 4, Customer Complaint Record (CCR)

· Appendix 5, Performance Assessment Report (PAR)

· Appendix 6, Contract Discrepancy Report (CDR)

Statements

Standards/AQLs
Inspections
Ratings

3. CONTRACT REPORTING REQUIREMENTS

3.1.1 Contractor Personnel Roster

STD: Accurate and timely test support within schedule and milestones as requested by the Government.

AQL: 100% compliant with all regulations.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR Incentive: Deficiencies shall be corrected within 48 hours at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

3.1.2 Contract Gains and Losses Report
STD: Accurate and timely support within schedule and milestones as requested by the Government.
What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

3.1.3 Contract Status Reports

STD: Accurate and timely support within schedule and milestones as requested by the Government.

AQL: 100% compliant with all regulations.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

3.1.4 Contract Funds Status Reports

STD: Accurate and timely support within schedule and milestones as requested by the Government.

AQL: 100% compliant with all regulations.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

Statements

Standards/AQLs
Inspections
Ratings

4. MISSION SUPPORT

SERVICE REQUIREMENTS

The Contractor shall provide Indirect support to RTC across all Directorates in planning, execution, and reporting of test and evaluation on military and non-military systems, subsystems, and components.

4.1 Logistics Support

4.1.1 Arms, Ammunition, and Explosives (AA&E) Support

Deliverables:

A007 Work Products as Requested A008 Data Reports and Documents as Required

STD: Accurate and timely explosives/munitions control, transport, management and handling.

AQL: Acceptable performance of this task requires the Contractor to perform explosives and munitions accountability, transport, handling, and management correctly and completely, with no more than one technically incorrect task or test delay every six months.

STD: Supply Class V Material (ammunition) accountability to include physical location of material and records accurately and timely.

AQL: Supply Class V Material (ammunition) shall be 100% accounted for.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.2 Maintenance Support

A008 Data Reports and Documents as Required A015 Facility Maintenance Log STD: Accurate and timely support within schedule and milestones as requested by the Government.

AQL: 100% compliant with all regulations.

95% mission capable.

STD: Accurate, complete and timely emergency maintenance support of tasks and functions as directed by the Government.

AQL: 100% compliant with all procedures and applicable regulations. Emergency maintenance, repair, and support will be 100% accurate, complete, and compliant as directed by the Government.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.3 Unit Supply Support

A007 Work Products as Requested A008 Data Reports and Documents as Required

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

AQL: 100% compliant with all procedures and applicable regulations.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.4 Inventory Management Support

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

AQL: 100% compliant with all procedures and applicable regulations.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.5 Test Measurement and Diagnostic Equipment (TMDE) Support

STD: Accurate and timely support within schedule and milestones as requested by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.6 GSA Fleet Operations Support

A007 Work Products as Requested A008 Data Reports and Documents as Required A010 Drivers Log A011Mechanic Log

STD: Maintenance and repair must be correct and complete before delivery to the Government

AQL: Acceptable performance of this task requires the Contractor to perform operation, maintenance, and repair correctly and completely for at least 95% of designated tasks, correctable to 100% within 24 hours of requested correction.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.7 Facilities Planning Support

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

AQL: 100% compliant with all procedures and applicable regulations What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.1.8 Test Ranges and Facilities Management Support

STD: Accurate and timely support within schedule and milestones as requested by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.2 Common Support Services

4.2.1 Administrative and Clerical Support

A001 DI-MISC-80508B

STD: Accurate and timely support within schedule and milestones as requested by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.2.2 Resource Management (RM)

A001 DI-MISC-80508B

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

AQL: No more than one (1) validated complaint per quarter, per area supported.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.2.3 Human Resources (HR) Support

A001 DI-MISC-80508B

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.2.4 Security Support

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.2.5 Continuous Process Improvement (PI)

A001 DI-MISC-80508B

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.2.6 Workload Planning

A001 DI-MISC-80508B

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.3 ENVIRONMENTAL & SAFETY SUPPORT REQUIREMENTS

4.3.1 Environmental Compliance

A001 DI-MISC-80508B

STD: Accurate and timely environmental, health, and safety program support functions, projects, and data analysis within schedule and milestones as requested by the Government.

AQL: Acceptable performance of task requires the Contractor to meet 95% accuracy and completeness of program support functions corrected to 100% within 24 hours of requested correction. Data analysis and reports will be 100% accurate and complete by the Government requested delivery date.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.3.2 Comprehensive Safety Responsibilities

Standard(s): Inspection applies to all standards.

4.3.2.1 Safety Support Functions

A007 Work Products as Requested

A009 Safety Plan

STD: Ensure compliance with all local, RTC, Army, State, Federal, and OSHA mandated regulations, policies and requirements.

AQL: 100% Compliance

STD: The Contractor shall conduct or attend Government safety meetings at least monthly for all employees in accordance with ATEC Regulation 385-1.

AQL: 100% Compliance

STD: Record of Accidents/Incidents. IAW 29 CFR Part 1904, AR 385-40, and RTC Supplement 3 to ATEC Regulation 385-1. The Contractor shall follow all RTC regulations with respect to accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment.

AQL: 100% Compliance

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.3.2.2 Operations Safety Support Requirements

A001 DI-MISC-80508B

A007 Work Products as Requested

STD: Ensure compliance with all local, RTC, Army, State, Federal, and OSHA mandated regulations, policies and requirements.

AQL: 100% Compliance

STD: The Contractor shall conduct or attend Government safety meetings at least monthly for all employees in accordance with ATEC Regulation 385-1.

AQL: 100% Compliance

STD: Record of Accidents/Incidents. In accordance with 29 CFR Part 1904, AR 385-40, and RTC Supplement 3 to ATEC Regulation 385-1. The Contractor shall follow all RTC regulations with respect to accidents resulting in injury or death and accidents resulting in damage to Government property, supplies, and equipment.

AQL: 100% Compliance

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.3.2.3 Explosive Safety Support Requirements

A001 DI-MISC-80508B

A007 Work Products as Requested

STD: Accurate and timely environmental, health, safety program support functions, projects, and data analysis within schedule and milestones as requested by the Government.

AQL: Acceptable performance of task requires the Contractor to meet 95% accuracy and completeness of program support functions corrected to 100% within 24 hours of requested correction. Data analysis and reports will be 100% accurate and complete by the Government requested delivery date

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.3.2.4 Test Range Safety Support Requirements

A001 DI-MISC-80508B

A007 Work Products as Requested

Accurate and timely environmental, health, safety program support functions, projects, and data analysis within schedule and milestones as requested by the Government.

AQL: Acceptable performance of task requires the Contractor to meet 95% accuracy and completeness of program support functions corrected to 100% within 24 hours of requested correction. Data analysis and reports will be 100% accurate and complete by the Government requested delivery date.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR Incentive: Deficiencies shall be corrected within 24 hours at no additional cost to the Government.

4.3.2.5 System Safety Support Requirements

A001 DI-MISC-80508B

A007 Work Products as Requested A008 Data Reports and Documents as Required A009 Safety Plan

STD: Accurate and timely environmental, health, safety program support functions, projects, and data analysis within schedule and milestones as requested by the Government.

AQL: Acceptable performance of task requires the Contractor to meet 95% accuracy and completeness of program support functions corrected to 100% within 24 hours of requested correction. Data analysis and reports will be 100% accurate and complete by the Government requested delivery date.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.4 Operations Support

4.4.1 Training Management Support

A001 DI-MISC-80508B

A002 DI-ADMN-81373

A005 DI-ADMN-81250B

A006 DI-ADMN-81249A

STD: Accurate, complete and timely support of tasks and functions as directed by the Government.

What: Records and documents.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.4.2 Test Documentation Assessment

A001 DI-MISC-80508B

STD: Accurate and timely support within schedule and milestones as requested by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually observe operations.

How: Random intervals.

Who: TM or COR

4.4.3 Test Incident Reports (TIRs)

STD: Accurate and timely support within schedule and milestones as requested by the Government.

95% mission capable.

What: Records and documents.

How: Periodic review or random inspection.

Who: TM or COR Incentive: Deficiencies shall be corrected immediately or at another interval specified by the Government at no additional cost to the Government.

Standard(s): Inspection applies to all standards.

What: Substantiated complaints.

How: Monthly review of feedback.

Who: TM or COR Incentive: Rework needed due to contractor negligence or error will be accomplished at no additional cost to the government.

Standard(s): Inspection applies to all standards.

What: Visually…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.