BRAKE_DOWN.pdf
PDF 25 KB Posted
- Attached to
- PERIMETER LIGHT LA MACARENA Federal contract opportunity
- Solicitation number
- W913FT-16-R-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16-R-0003-0002_SITE_VISIT_CANCELL.pdf | ||
| 16-R-0003-0001.pdf | ||
| Technical_Exhibit_2_LAMAC_Perimeter_Lights.pdf | ||
| 16-R-0003_APPROVED.pdf | ||
| Technical_Exhibit_2_LAMAC_Perimeter_Lights.PNG | PNG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM DESCRIPTION Unit Quantity Est Unit Cost Total
1 Electrical works $
1.1 Site prep EA 55 $ $
1.2 Lamps and cases with motion sensor EA 110 $ $
1.3
Solar panel kit: batteries, controller, cables, mounting brackets, solar panels, inverter, connections, switches, and accessories. EA 55 $ $
1.4
Electrical cabinet for battery and controller protection (with locking mechanism) EA 55 $ $
1.5 Poles labeling and numbering LS 1 $ $
1.6 Grounding protection EA 55 $ $
1.7 Lighting protection EA 55 $ $
1.8 Installation EA 55 $ $
2 ADMINISTRATION WITHOUT OPTION $
2.1 General & Administration Cost $ $
2.2 General Taxes $ $
2.3 Contractor Profit $ $
2.4 Transportation $ $
3 ESTIMATED COST WITHOUT OPTION $
4 OPTION
4.1 Maintenace (OPTION 1) Month 12 $ $
5 ESTIMATED COST WITH OPTION 1 $
Performance period 180 days
Notes:
PERIMETER LIGHTS PROJECT
1. Quantities presented in this table are approximately and it is contractor responsibility to validate them to reflect actual site conditions, SOW, and Technical
Exhibits. Contractor shall adjust quantities and add any missing item. This table is only a guide for the contractor and it is not intent to be final.