16-R-0003_APPROVED.pdf
PDF 356 KB Posted
- Attached to
- PERIMETER LIGHT LA MACARENA Federal contract opportunity
- Solicitation number
- W913FT-16-R-0003
About this file
SOLICITATION PERIMETER LIGHTS LA MACARENA
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BRAKE_DOWN.pdf | ||
| 16-R-0003-0002_SITE_VISIT_CANCELL.pdf | ||
| 16-R-0003-0001.pdf | ||
| Technical_Exhibit_2_LAMAC_Perimeter_Lights.PNG | PNG image | |
| Technical_Exhibit_2_LAMAC_Perimeter_Lights.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope: Perimeter Lights at La Macarena, Meta, Colombia
In accordance w ith FAR 36.204(a), Disclosure of the magnitude of construction Project: Betw een US$350,000.00 and US$500,000.00
Section 00000 - SF1442 Section 002100 - Instructions to Offerors Section 002116 - Basis of Aw ard Section 002100 - Contract Clauses
ASTRID PARDO 011-571-2752386
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Aug-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________06 Sep 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All of fers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
REGIONAL CONTRACTING OFFICE (RCO) BOGOTA
CARRERA 45 NO. 24B-27
USMILGP CONTRACTING
BOGOTA
W913FT
PAGE OF PAGES
1 OF
CODE W913FT
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
ASTRID PARDO
AMERICAN EMBASSY COLOMBIA; CRA. 45 # 24B-27
BOGOTA
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: 571 2752386 FAX:
W913FT-16-R-0003 57
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
PERIMETER LIGHTS
FFP
ALL ASSOCIATED FOR PERIMETER LIGHS FOR LA MACARENA
INCLUDED IN THE SOW. SEE PART 5 AND OTHER APPLICABLE
PARAGRAPHS OF THE SOW. POP 180 DAYS AFTER NOTICE TO
PROCEED.
POC: ROSA SANTONI
MISSION: FORCE PROTECTION
FOB: Destination
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 180 dys. ADC 1 SEE THE ATTACHED PWS/SPEC
DESGINATED COR OR POC
FOR COMPLETE DELIVERY
INFORMATION
SEE SHIPPING INSTRUCTIONS
FOB: Destination
W9094C
CLAUSES INCORPORATED BY REFERENCE
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
CLAUSES INCORPORATED BY FULL TEXT
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
CONTRACTING OFFICE
APO, AA 34038
52.233-4703
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC.
The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the contracting officer) to:
Headquarters U.S. Army Materiel Command Office of Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000
Fax: (256)450-8840
The AMC-level protest procedures are found at:
http:// http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp
If Internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC- Level Protest Procedures.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
Section 00 20 00 - Instructions for Procurement
52.203-2 Certificate Of Independent Price Determination APR 1985 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.
Section 00 21 00 - Instructions
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.204-3 Taxpayer Identification OCT 1998 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-13 System for Award Management Maintenance JUL 2013 52.215-2 Audit and Records--Negotiation OCT 2010 52.222-3 Convict Labor JUN 2003 52.222-50 Combating Trafficking in Persons MAR 2015 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.228-3 Worker's Compensation Insurance (Defense Base Act) JUL 2014 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-3 Protest After Award AUG 1996 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.243-4 Changes JUN 2007 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.247-27 Contract Not Affected by Oral Agreement APR 1984 52.249-10 Default (Fixed-Price Construction) APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7041 Correspondence in English JUN 1997 252.225-7042 Authorization to Perform APR 2003 252.225-7987 (Dev) Requirements For Contractor Personnel Performing in
USSOUTHCOM Area of Responsibility
OCT 2014
252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997 252.232-7008 Assignment of Claims (Overseas) JUN 1997 252.232-7010 Levies on Contract Payments DEC 2006 252.232-7010 Levies on Contract Payments DEC 2006 252.233-7001 Choice of Law (Overseas) JUN 1997 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7022 Representation Of Extent Of Transportation Of Supplies By
Sea
AUG 1992
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .180 days* The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
(End of clause)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fix Price contract resulting from this solicitation.
52.225-17 EVALUATION OF FOREIGN CURRENCY OFFERS (FEB 2000)
If the Government receives offers in more than one currency, the Government will evaluate offers by converting the foreign currency to United States currency using the Global Currency Exchange Rates Report published daily by the Charleston Financial Service Center in effect as stated below. This is the official rate to be used for all financial transactions processed by the Embassy in Bogota.
in effect as follows:
(a) For acquisitions conducted using sealed bidding procedures, on the date of bid opening.
(b) For acquisitions conducted using negotiation procedures--
(1) On the date specified for receipt of offers, if award is based on initial offers; otherwise
(2) On the date specified for receipt of proposal revisions.
52.232-16 PROGRESS PAYMENTS (APR 2012)
The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:
(a) Computation of amounts. (1) Unless the Contractor requests a smaller amount, the Government will compute each progress payment as 80 percent of the Contractor's total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The Contracting Officer will consider cost of money that would be allowable under FAR 31.205-10 as an incurred cost for progress payment purposes.
(2) The amount of financing and other payments for supplies and services purchased directly for the contract are limited to the amounts that have been paid by cash, check, or other forms of payment, or that are determined due and will be paid to subcontractors--
(i) In accordance with the terms and conditions of a subcontract or invoice; and
(ii) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government.
(3) The Government will exclude accrued costs of Contractor contributions under employee pension plans until actually paid unless--
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).
(4) The Contractor shall not include the following in total costs for progress payment purposes in paragraph (a)(1) of this clause:
(i) Costs that are not reasonable, allocable to this contract, and consistent with sound and generally accepted accounting principles and practices.
(ii) Costs incurred by subcontractors or suppliers.
(iii) Costs ordinarily capitalized and subject to depreciation or amortization except for the properly depreciated or amortized portion of such costs.
(iv) Payments made or amounts payable to subcontractors or suppliers, except for --
(A) Completed work, including partial deliveries, to which the Contractor has acquired title; and
(B) Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has acquired title.
(5) The amount of unliquidated progress payments may exceed neither (i) the progress payments made against incomplete work (including allowable unliquidated progress payments to subcontractors) nor
(ii) the value, for progress payment purposes, of the incomplete work. Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the Contractor and acceptance by the Government are incomplete.
(6) The total amount of progress payments shall not exceed 80 percent of the total contract price.
(7) If a progress payment or the unliquidated progress payments exceed the amounts permitted by subparagraphs (a)(4) or (a)(5) of this clause, the Contractor shall repay the amount of such excess to the Government on demand.
(8) Notwithstanding any other terms of the contract, the Contractor agrees not to request progress payments in dollar amounts of less than $2,500. The Contracting Officer may make exceptions.
(9) The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the contract price of the items.
(b) Liquidation. Except as provided in the Termination for Convenience of the Government clause, all progress payments shall be liquidated by deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress payments, or 80 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.
(c) Reduction or suspension. The Contracting Officer may reduce or suspend progress payments, increase the rate of liquidation, or take a combination of these actions, after finding on substantial evidence any of the following conditions:
(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (f) and (g) of this clause).
(2) Performance of this contract is endangered by the Contractor's --
(i) Failure to make progress or
(ii) Unsatisfactory financial condition.
(3) Inventory allocated to this contract substantially exceeds reasonable requirements.
(4) The Contractor is delinquent in payment of the costs of performing this contract in the ordinary course of business.
(5) The fair value of the undelivered work is less than the amount of unliquidated progress payments for that work.
(6) The Contractor is realizing less profit than that reflected in the establishment of any alternate liquidation rate in paragraph (b) of this clause, and that rate is less than the progress payment rate stated in subparagraph (a)(1) of this clause.
(d) Title.
(1) Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be immediately upon the date of this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.
(2) "Property," as used in this clause, includes all of the below-described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.
(i) Parts, materials, inventories, and work in process;
(ii) Special tooling and special test equipment to which the Government is to acquire title;
(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, and other similar manufacturing aids, title to which would not be obtained as special tooling under paragraph (d) (2)(ii) of this clause; and
(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.
(3) Although title to property is in the Government under this clause, other applicable clauses of this contract; e.g., the termination clauses, shall determine the handling and disposition of the property.
(4) The Contractor may sell any scrap resulting from production under this contract without requesting the Contracting Officer's approval, but the proceeds shall be credited against the costs of performance.
(5) To acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms. The Contractor shall
(i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.
(6) When the Contractor completes all of the obligations under this contract, including liquidation of all progress payments, title shall vest in the Contractor for all property (or the proceeds thereof) not--
(i) Delivered to, and accepted by, the Government under this contract; or
(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the Government under this clause.
(7) The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the Government acquired title solely under this clause.
(e) Risk of loss. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is lost (see 45.101).
(f) Control of costs and property. The Contractor shall maintain an accounting system and controls adequate for the proper administration of this clause.
(g) Reports, forms, and access to records. (1) The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information (including estimates to complete) reasonably requested by the Contracting Officer for the administration of this clause. Also, the Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.
(2) The Contractor shall furnish estimates to complete that have been developed or updated within six months of the date of the progress payment request. The estimates to complete shall represent the Contractor's best estimate of total costs to complete all remaining contract work required under the contract. The estimates shall include sufficient detail to permit Government verification.
(3) Each Contractor request for progress payment shall:
(i) Be submitted on Standard Form 1443, Contractor's Request for Progress Payment, or the electronic equivalent as required by agency regulations, in accordance with the form instructions and the contract terms; and
(ii) Include any additional supporting documentation requested by the Contracting Officer.
(h) Special terms regarding default. If this contract is terminated under the Default clause, (i) the Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments and (ii) title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the Default clause. The Government shall be liable for no payment except as provided by the Default clause.
(i) Reservations of rights.
(1) No payment or vesting of title under this clause shall --
(i) Excuse the Contractor from performance of obligations under this contract or
(ii) Constitute a waiver of any of the rights or remedies of the parties under the contract.
(2) The Government's rights and remedies under this clause
(i) Shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law or this contract and
(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
(j) Financing payments to subcontractors. The financing payments to subcontractors mentioned in paragraphs (a)(1) and (a)(2) of this clause shall be all financing payments to subcontractors or divisions, if the following conditions are met:
(1) The amounts included are limited to--
(i) The unliquidated remainder of financing payments made; plus
(ii) Any unpaid subcontractor requests for financing payments.
(2) The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months between the beginning of work and the first delivery; or, if the subcontractor is a small business concern, 4 months.
(3) If the financing payments are in the form of progress payments, the terms of the subcontract or interdivisional order concerning progress payments--
(i) Are substantially similar to the terms of this clause for any subcontractor that is a large business concern, or this clause with its Alternate I for any subcontractor that is a small business concern;
(ii) Are at least as favorable to the Government as the terms of this clause;
(iii) Are not more favorable to the subcontractor or division than the terms of this clause are to the Contractor;
(iv) Are in conformance with the requirements of FAR 32.504(e); and
(v) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's right to require delivery of the property to the Government if--
(A) The Contractor defaults; or
(B) The subcontractor becomes bankrupt or insolvent.
(4) If the financing payments are in the form of performance-based payments, the terms of the subcontract or interdivisional order concerning payments--
(i) Are substantially similar to the Performance-Based Payments clause at FAR 52.232-32 and meet the criteria for, and definition of, performance-based payments in FAR Part 32;
(ii) Are in conformance with the requirements of FAR 32.504(f); and
(iii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's right to require delivery of the property to the Government if--
(A) The Contractor defaults; or
(B) The subcontractor becomes bankrupt or insolvent.
(5) If the financing payments are in the form of commercial item financing payments, the terms of the subcontract or interdivisional order concerning payments--
(i) Are constructed in accordance with FAR 32.206(c) and included in a subcontract for a commercial item purchase that meets the definition and standards for acquisition of commercial items in FAR Parts 2 and 12;
(ii) Are in conformance with the requirements of FAR 32.504(g); and
(iii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the Government's right to require delivery of the property to the Government if--
(A) The Contractor defaults; or
(B) The subcontractor becomes bankrupt or insolvent.
(6) If financing is in the form of progress payments, the progress payment rate in the subcontract is the customary rate used by the contracting agency, depending on whether the subcontractor is or is not a small business concern.
(7) Concerning any proceeds received by the Government for property to which title has vested in the Government under the subcontract terms, the parties agree that the proceeds shall be applied to reducing any unliquidated financing payments by the Government to the Contractor under this contract.
(8) If no unliquidated financing payments to the Contractor remain, but there are unliquidated financing payments that the Contractor has made to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.
(9) To facilitate small business participation in subcontracting under this contract, the Contractor shall provide financing payments to small business concerns, in conformity with the standards for customary contract financing payments stated in Subpart 32.113. The Contractor shall not consider the need for such financing payments as a handicap or adverse factor in the award of subcontracts.
(k) Limitations on undefinitized contract actions. Notwithstanding any other progress payment provisions in this contract, progress payments may not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in Subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.
(l) Due date. The designated payment office will make progress payments on the 30 day after the designated billing office receives a proper progress payment request. In the event that the Government requires an audit or other review of a specific progress payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date. Progress payments are considered contract financing and are not subject to the interest penalty provisions of the Prompt Payment Act.
(m) Progress payments under indefinite--delivery contracts. The Contractor shall account for and submit progress payment requests under individual orders as if the order constituted a separate contract, unless otherwise specified in this contract.
(End of clause)
INTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
1. GENERAL. This procurement will be awarded as a Lowest Price, Technically Acceptable (LPTA) contract, considering past performance. The Government intends to evaluate offers and award a single contract without discussions with Offerors, except for clarifications as described in FAR Subpart 15.3. Therefore, the initial offer should contain the Offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In the event that discussions are held, a competitive range determination will be made. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. The Government may reject any or all responses if such action is in the public interest and/or waive informalities and minor irregularities in the submitted offers. The Government reserves the right to cancel this RFP and make no award. By submitting a proposal in response to this RFP, the Offeror understands that the Government shall not be liable for any costs incurred by the Offeror in preparing that response.
2. PROPOSAL DELIVERY. All responses shall be in English (or include an English translation), legible and prepared in the following general format to be properly evaluated. Responses must be complete, self-sufficient, and respond directly to the requirements of this RFP.
a. Electronic Submission. The Offeror shall provide a copy of their proposal as an electronic file. The proposal shall be written using Microsoft Office, Adobe PDF, and AutoCAD software. The proposal shall be emailed on or before the solicitation closing date/time as stated in Block 13(A) of the SF1442 to the following:
Juan Arzu Contracting Officer juan.p.arzulambert.civ@mail.mil Cesar Casillas Contracting Officer cesar.g.casillas2.civ@mail.mil
Astrid Pardo Contracting Specialist astrid.j.pardootero.fn@mail.mil
If the file is too large to send by email, contact the Contracting Officer and/or the Contracting Specialist to deliver for physical acceptance prior to the solicitation closing date/time.
b. Solicitation Questions. Questions regarding this solicitation shall be submitted in writing via e-mail to the Contracting Officer at juan.p.arzulambert.civ@mail.mil and to the Contracting Specialist at astrid.j.pardootero.fn@mail.mil 5 business days after solicitation date. The Government will respond to questions received from prospective offerors by 5 business days after receipt of questions. The Government reserves the right not to respond to any questions concerning this solicitation received after the question receipt date and time established. Accordingly, Offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the proposal cycle.
c. Amendments Prior to Solicitation Closing Date/Time. The Government reserves the right to amend the solicitation specifications and/or drawings prior to receipt of offers. Any changes will be provided through an amendment to the solicitation.
d. Exceptions. If the Offeror takes exception to any of the requirements specified in this solicitation, the Offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements and supporting rationale shall be included as an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the Offeror takes exception to any requirement in the solicitation. The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements. The Government will assume an Offeror takes no exceptions to any solicitation requirement if the Offeror does not submit an Addendum identifying such exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an Offeror's proposal unacceptable and ineligible for award.
3. QUALIFICATION OF OFFEROR. Offerors must be financially, socially and ethically responsible to perform the work described in this solicitation. At a minimum, each Offeror must meet the following requirements:
a. Have an established business with a permanent address and telephone listing.
b. Have the necessary personnel, equipment and financial resources available to perform the work;
c. Have all licenses and permits required by local law;
d. Have no adverse criminal record;
g. Have no political or business affiliation which could be considered contrary to the interests of the United States.
4. PROPOSAL CONTENTS. Each Offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration at the Government’s discretion. .
Proposal sections shall be labeled as such i.e., Section I – Price; Section II-Technical; Section III Past Performance.
a. Section I - Pricing Information and Required Documents
(1) No limit page. Electronic format.
(2) Offerors shall provide all pricing information necessary to provide a meaningful basis for the Government's analysis and evaluation of price for the project set forth in Section 00 10 00 of this solicitation. The Government is not, and does not intend to request certified cost or pricing data. Offerors may be required during the evaluation process to provide sufficient price information that will enable the Government to perform a meaningful evaluation.
(3) A complete response shall consist of a price response to include the pricing sheet (Breakdown of Price Proposal) in Excel format and a cover sheet. The Offeror shall provide their response with a cover sheet that contains the company’s name, address and telephone number, name and title of the person authorized to sign and negotiate the contract and appropriate dollar threshold, and the offer validation period of 120 days.
(4) To be considered responsible, an Offeror must be in compliance with FAR 9.104(1)a. To demonstrate this aspect of Responsibility, Offerors shall provide a bank reference from its bank with information of the Offeror’s financial standing (i.e., satisfactory accounts, outstanding loans, and line of credit).
(5) Offer and Section 00 10 00. Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442 contract line items 0001 through 0003 as applicable. An official having the authority to contractually bind the offering company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF 1442 is required to have an original signature.
Standard Form 1442 - Complete blocks 14 through 20C
Blocks 14 through 15 – Complete all offeror contact information.
Block 17 – Add offer acceptance date and total price information. Total price from all line items taken from the “pricing breakdown schedule” attachment, and include the schedule itself with the proposal. The tax listed on the price list shall not be calculated as part of the total price. The USMILGP is a tax exempt organization.
Block 18 – No bonds required.
Block 19 - Amendments – Acknowledge receipt of amendments by signing any amendments issued during this solicitation, and entering the amendment numbers and dates in the spaces provided. Submit a copy of the amendments to acknowledge receipt.
Block 20A through 20C – Add name and title of authorized person, signature, and date.
(6) The Offeror shall submit with their proposal a completed pricing breakdown schedule (template included as Attachment 1); otherwise, the Offeror’s proposal shall be considered nonresponsive. The Offeror shall insert their price totals from their pricing breakdown schedule in the corresponding SF 1442 contract line item.
(7) Representations and Certifications. Complete and submit the required Representations and Certifications and return.
b. Section II – Technical Response
(1) No page limits on the project schedule or the equipment/manufacturing specification sheets and warranty information.
(2) Project Schedule. Offerors shall include in their technical proposal a complete project management schedule utilizing the Critical Path Method (CPM), Program Evaluation & Review Technique (PERT) or Gantt chart showing the major construction phases stated in Part 5 of the Statement of Work. The project schedule shall include float time within the 180-day maximum to account for down days due to inclement weather or other potential non-work situations. The proposed schedule shall include quality assurance inspections at the critical milestones of the project including site preparation, construction/installation work, and any separately identified unique repair efforts.
The project schedule shall have expected completion dates, execution time of each phase, and a mid-point completion of project. Vendors shall keep in mind the Colombian Holidays for the schedule.
(3) Proposed Equipment/Materials Specifications: The Offeror shall provide a list and description / specifications of materials and products to be used to assure offeror understands required compliance for this project. The list shall include warranty information.
c. Section III – Past Performance Information
(1) No more than ten (10) single sided pages of written material shall be submitted.. Photographs may be provided, however, submission shall not exceed the page limit of written material.
(2) Past Performance information shall be submitted in English.
(3) Explain corrective actions taken in past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods, customer complaints, or personnel problems/issues.
(4) References. In addition to past performance information above, provide a list of three relevant contracts that clearly demonstrate prior experience in construction projects. These reference projects shall be:
(a) Physically completed within the past three years.
(b) Similar in magnitude to the magnitude amount in this solicitation (US$ amount).
(c) Similar in construction features.
(5) Provide the following information for each contract or project reference included in the list above and describes customer's name, address, and telephone numbers of customer's lead contract and technical personnel.
(i) Contract value, number and type
(ii) Date of contract award, place(s) of performance and completion dates
(iii) Brief description of the scope of work including responsibilities
(iv) Comparability to the work under this solicitation
(v) Brief discussion of any major technical problems if any, and their resolution
(vi) Method of acquisition (fully competitive, partially competitive, or noncompetitive), and the basis for award (price, technical merit, etc.)
(vii) Any terminations (partial or complete) and the reason (convenience or default)
(6) If more than three (3) projects are submitted, only the three (3) most recent will be evaluated.
Section 00 21 16 - Instructions to Proposers
BASIS OF AWARD
BASIS OF AWARD
A. BASIS OF AWARD. The award will be evaluated on a Lowest Priced, Technically Acceptable (LPTA) basis, considering past performance. Subject to the provisions contained herein, the Government intends to award a single contract resulting from the solicitation, to the Offeror whose response conforms to the Statement of Work and is technically acceptable, and provides the lowest total price for the actual contract line items awarded.
B. EVALUATION FACTORS. Each offeror’s response will be evaluated Acceptable/Unacceptable. Any factor or sub-factor rated as “unacceptable” will result in an overall factor rating of “unacceptable”. Factor III - Price will not be scored or rated. Evaluation of price will be performed using one or more of the price analysis techniques in FAR 15.404-1(b).
If contractor don’t comply with all this requirements, they are going to be disqualified.
1. Factor I - Technical criteria elements consist of the following:
(a) Project Schedule: The offerors’ project schedule will be evaluated to ensure performance will be completed on time IAW the contract period of performance and that the offeror has demonstrated a clear understanding of the project. As a minimum, the following will be evaluated:
(1) Meeting the minimum 180-day schedule
(2) Identifying a critical path that shows the essential elements that must be accomplished prior to the start of follow on work
(3) Clearly identifies Government inspection and permit approval time
(4) Includes Colombian holidays and slack time planned for weather or local security related delays.
(b) Proposed Equipment/Materials Specifications: The offeror’s proposed material and equipment will be evaluated to ensure that meet the specifications of the SOW and the solicitation. The material specifications shall include the manufacturers’ warranty information. All equipment and materials shall still require a submittal for the Contracting Officer and the Government Technical Representative’s approvals as outlined in the project specifications
2. Factor II – Past Performance. The Government will evaluate the Construction projects or contracts submitted in order to evaluate past performance. Past performance relates to how well a Contractor has performed on previous contracts. The Government may contact references to verify past performance. If the Government is aware of contracts that meet the requirements of this solicitation but have not been included in the three (3) contracts submitted, it may evaluate those contracts in addition to those submitted. In the event an offeror has no relevant past performance, offeror’s may submit past performance information for the key personnel proposed. If an offeror, or the proposed employees for the offeror do not have a past performance history relating to this solicitation, the offeror will not be evaluated favorably or unfavorably on the factor (rating will be unknown or acceptable). In order to be considered for award, the offeror’s past performance rating must be evaluated as acceptable. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance submittal and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources.
Recency Assessment: To be recent, the effort must be ongoing or must have been performed during the past 3 years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.
Relevancy Assessment: To be relevant, the effort must be similar in nature of work, size and complexity. The Government will conduct evaluation of all recent performance information obtained to determine if it is the same or similar in nature of work, size and complexity to the construction being procured under this solicitation.
References: The offerors’ references will be evaluated for:
(1) Physical completion within the past three years
(2) Similar in magnitude to the disclosure of magnitude amount on Page 1 of the solicitation
(3) Similar in construction features to the specifications provided in the solicitation.
(4) Contractor should have at a minimum 5 years of experience on solar panel lighting projects.
(5) Contractor should have an electrical engineer as project manager and field Engineer with at least 10 years of experience on solar lighting projects.
Contractor needs to provide evidence with recent project information, valid Point of contact (i.e. name, phone, and email). If Colombia issue a license for such contractor, then a current license should also be included.
(6) Detailed list of materials with specs for solar panels, LED lights, light brackets, arrestor, batteries, grounding, lighting rod, and accessories required to have perimeter light in operation.
3. Factor III – Price
(a) Prices evaluated as unreasonably high may be grounds for eliminating an offer from the competitive range. Price will be evaluated to determine if the offeror’s proposed price is fair, reasonable, and balanced utilizing price analysis techniques in accordance with the guidelines in FAR 15.404-1(b). Supporting documentation shall be included in the price submission, which includes the price breakdown schedule of the prices.
(b) Unless otherwise specified, offerors shall submit prices for all CLINs. Failure to submit a price for any CLIN/sub-CLIN shall result in the proposal being considered unacceptable
c) Total evaluated price shall be the basis for evaluating price for contract award decision purposes. Total evaluated price shall be determined by adding the proposed prices on all CLINs/items stated in the solicitation. In the event the unit price (s) and extended price(s) are ambiguous, the Government shall use the indicated unit price(s) for evaluation and award purposes. The Government reserves the right to make an award on any item of a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
DBA insurance will not be included in evaluating price.
4. Factor IV-Site Visit
(a) Only those vendors who attended the site visit in May 2016 or to the site visit scheduled for August 24th 2016 can participate on this RFP.
C. EVALUATION APPROACH. The evaluation processes consists of two parts: (1)Technical evaluation and
(2) Past Performance evaluation. Price will be evaluated separately from Technical and Past Performance evaluations.
1. All factors will be evaluated to determine whether the proposal addresses the minimum solicitation requirements. Based on an offeror’s proposal the Government will assign a Technical Criteria Rating of Acceptable or Unacceptable Rating and a Past Performance Risk Rating of Acceptable or Unacceptable (defined under Proposal
Rating Scheme in Para D and E below) to each Factor and criteria element. The Technical Evaluation focuses on how the proposed approach meets the minimum solicitation requirements.
2. All proposals shall be subject to evaluation by a team or member of technical evaluators. Each evaluator will independently evaluate each proposal. Thereafter, the results of the independent evaluations are merged into a final evaluation report. The evaluation report must represent a consensus of opinion of the members and be signed by each member.
D. TECHNICAL MERIT RATING SCHEME. The following is the Technical Merit Rating Scheme for evaluation of Technical Proposal.
ACCEPTABLE – Proposal clearly meets the minimum requirements of the specifications outlined in the…