16-R-0003-0002_SITE_VISIT_CANCELL.pdf
PDF 36 KB Posted
- Attached to
- PERIMETER LIGHT LA MACARENA Federal contract opportunity
- Solicitation number
- W913FT-16-R-0003
About this file
SOLICITATION AMENDMENT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BRAKE_DOWN.pdf | ||
| 16-R-0003-0001.pdf | ||
| Technical_Exhibit_2_LAMAC_Perimeter_Lights.PNG | PNG image | |
| 16-R-0003_APPROVED.pdf | ||
| Technical_Exhibit_2_LAMAC_Perimeter_Lights.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASTRID PARDO
AMERICAN EMBASSY COLOMBIA; CRA. 45 # 24B-27
BOGOTA
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TO CANCEL SITE VISIT DATE AND CHANGE CLOSING DATE
SITE VISIT: CANCELLED
CLOSING DATE: 15-SEP-2016
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W913FT-16-R-0003
X 9B. DATED (SEE ITEM 11)
01-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2016
CODE
REGIONAL CONTRACTING OFFICE (RCO) BOGOTA
CARRERA 45 NO. 24B-27
USMILGP CONTRACTING
BOGOTA
W913FT 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W913FT
FACILITY CODECODE
EMAIL:TEL:
W913FT-16-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 12-Sep-2016 10:00 AM to 15-Sep-2016 10:00 AM.
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
The following have been deleted:
52.203-3 Gratuities APR 1984
SECTION 00 21 00 - INSTRUCTIONS
The following have been deleted:
52.216-1 Type Of Contract APR 1984 252.232-7010 Levies on Contract Payments DEC 2006
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
BASIS OF AWARD
BASIS OF AWARD
A. BASIS OF AWARD. The award will be evaluated on a Lowest Priced, Technically Acceptable (LPTA) basis, considering past performance. Subject to the provisions contained herein, the Government intends to award a single contract resulting from the solicitation, to the Offeror whose response conforms to the Statement of Work and is technically acceptable, and provides the lowest total price for the actual contract line items awarded.
B. EVALUATION FACTORS. Each offeror’s response will be evaluated Acceptable/Unacceptable. Any factor or sub-factor rated as “unacceptable” will result in an overall factor rating of “unacceptable”. Factor III - Price will not be scored or rated. Evaluation of price will be performed using one or more of the price analysis techniques in FAR 15.404-1(b).
If contractor don’t comply with all this requirements, they are going to be disqualified.
1. Factor I - Technical criteria elements consist of the following:
(a) Project Schedule: The offerors’ project schedule will be evaluated to ensure performance will be completed on time IAW the contract period of performance and that the offeror has demonstrated a clear understanding of the project. As a minimum, the following will be evaluated:
(1) Meeting the minimum 180-day schedule
(2) Identifying a critical path that shows the essential elements that must be accomplished prior to the start of follow on work
(3) Clearly identifies Government inspection and permit approval time
(4) Includes Colombian holidays and slack time planned for weather or local security related delays.
(b) Proposed Equipment/Materials Specifications: The offeror’s proposed material and equipment will be evaluated to ensure that meet the specifications of the SOW and the solicitation. The material specifications shall include the manufacturers’ warranty information. All equipment and materials shall still require a submittal for the Contracting Officer and the Government Technical Representative’s approvals as outlined in the project specifications
2. Factor II – Past Performance. The Government will evaluate the Construction projects or contracts submitted in order to evaluate past performance. Past performance relates to how well a Contractor has performed on previous contracts. The Government may contact references to verify past performance. If the Government is aware of contracts that meet the requirements of this solicitation but have not been included in the three (3) contracts submitted, it may evaluate those contracts in addition to those submitted. In the event an offeror has no relevant past performance, offeror’s may submit past performance information for the key personnel proposed. If an offeror, or the proposed employees for the offeror do not have a past performance history relating to this solicitation, the offeror will not be evaluated favorably or unfavorably on the factor (rating will be unknown or acceptable). In order to be considered for award, the offeror’s past performance rating must be evaluated as acceptable. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance submittal and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources.
Recency Assessment: To be recent, the effort must be ongoing or must have been performed during the past 3 years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.
Relevancy Assessment: To be relevant, the effort must be similar in nature of work, size and complexity. The Government will conduct evaluation of all recent performance information obtained to determine if it is the same or similar in nature of work, size and complexity to the construction being procured under this solicitation.
References: The offerors’ references will be evaluated for:
(1) Physical completion within the past three years
(2) Similar in magnitude to the disclosure of magnitude amount on Page 1 of the solicitation
(3) Similar in construction features to the specifications provided in the solicitation.
(4) Contractor should have at a minimum 5 years of experience on solar panel lighting projects.
(5) Contractor should have an electrical engineer as project manager and field Engineer with at least 10 years of experience on solar lighting projects.
Contractor needs to provide evidence with recent project information, valid Point of contact (i.e. name, phone, and email). If Colombia issue a license for such contractor, then a current license should also be included.
(6) Detailed list of materials with specs for solar panels, LED lights, light brackets, arrestor, batteries, grounding, lighting rod, and accessories required to have perimeter light in operation.
3. Factor III – Price
(a) Prices evaluated as unreasonably high may be grounds for eliminating an offer from the competitive range. Price will be evaluated to determine if the offeror’s proposed price is fair, reasonable, and balanced utilizing price analysis techniques in accordance with the guidelines in FAR 15.404-1(b). Supporting documentation shall be included in the price submission, which includes the price breakdown schedule of the prices.
(b) Unless otherwise specified, offerors shall submit prices for all CLINs. Failure to submit a price for any CLIN/sub-CLIN shall result in the proposal being considered unacceptable
c) Total evaluated price shall be the basis for evaluating price for contract award decision purposes. Total evaluated price shall be determined by adding the proposed prices on all CLINs/items stated in the solicitation. In the event the unit price (s) and extended price(s) are ambiguous, the Government shall use the indicated unit price(s) for evaluation and award purposes. The Government reserves the right to make an award on any item of a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
DBA insurance will not be included in evaluating price.
4. Factor IV-Site Visit
(a) Only those vendors who attended the site visit in May 2016 or to the site visit scheduled for September 15th 2016 can participate on this RFP.// AFTER SOME INCONVENIENCES WE HAVE TO CANCELL
SITE VISIT PROGRAMMED. SITE VISIT IS NOT MANDATORY ANYMORE.
C. EVALUATION APPROACH. The evaluation processes consists of two parts: (1)Technical evaluation and
(2) Past Performance evaluation. Price will be evaluated separately from Technical and Past Performance evaluations.
1. All factors will be evaluated to determine whether the proposal addresses the minimum solicitation requirements. Based on an offeror’s proposal the Government will assign a Technical Criteria Rating of Acceptable or Unacceptable Rating and a Past Performance Risk Rating of Acceptable or Unacceptable (defined under Proposal Rating Scheme in Para D and E below) to each Factor and criteria element. The Technical Evaluation focuses on how the proposed approach meets the minimum solicitation requirements.
2. All proposals shall be subject to evaluation by a team or member of technical evaluators. Each evaluator will independently evaluate each proposal. Thereafter, the results of the independent evaluations are merged into a final evaluation report. The evaluation report must represent a consensus of opinion of the members and be signed by each member.
D. TECHNICAL MERIT RATING SCHEME. The following is the Technical Merit Rating Scheme for evaluation of Technical Proposal.
ACCEPTABLE – Proposal clearly meets the minimum requirements of the specifications outlined in the solicitation.
UNACCEPTABLE – Proposal does not clearly meet the minimum requirements of the specifications outlined in the solicitation.
E. PAST PERFORMANCE RATING SCHEME: In the evaluation of Past Performance, the evaluators will use the following adjectives and related definitions to define the past performance risk the Offeror poses.
ACCEPTABLE – Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown (See Note Below).
UNACCEPTABLE – Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) SITE VISIT ONE WAS ALREADY PERFORMED AT LA MACARENA, META ON MAY 12TH, 2016.
(c) SITE VISIT NUMBER TWO: CANCELLED
IN ORDER TO SUBMIT AN OFFER, COMPANY MUST ASSIST TO EITHER ONE OR TWO SITE
VISITS.
IF COMPANY ALREADY WENT TO SITE VISIT NUMBER ONE, IS NOT MANDATORY TO ASSIST
TO THE OTHER.
AFTER SEVERAL INCONVENIENCES WITH THE SECOND SITE VISIT, THIS OFFICE HAVE
DECIDE TO CANCELL IT AND NOW THE SITE VISIT IS NOT MANDATORY.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .