B08.03 Q&A for Amendment 0003 Posting 8.22.23.docx

DOCX document 13 KB Posted

Attached to
Electromechanical Material Testing Load Frame System Federal contract opportunity
Solicitation number
W9132T23Q0030
Issued by
Department of the Army Corps of Engineers

View the file

Other files for this federal contract opportunity

Other files attached to Electromechanical Material Testing Load Frame System, newest first.
File Type Posted
W9132T23Q0030 Amendment 0003.pdf PDF
W9132T23Q0030 Amendment 0003 Conformed Copy.pdf PDF
W9132T23Q0030 Amendment 0002 Conformed Copy.pdf PDF
W9132T23Q0030 Amendment 0002.pdf PDF
W9132T23Q0030 Amendment 0001.pdf PDF
W9132T23Q0030 Amendment 0001 Conformed Copy.pdf PDF
W9132T23Q0030.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A As of 22 August 2023

Question 1: There was a potential discrepancy noted regarding CLIN 0010 for the Flexural Test Fixture 100kN.

Answer 1: The intent is that each of the fixtures are extensions of the lower load capacity fixture and that they meet specific test requirements. This was not conveyed very well in this section. Testing would be conducted on a specimen that is 2 in x 2 in and have spans ranging from 2 to 10 times the depth. The requirements document was adjusted to reflect this.

Question 2: There was a potential discrepancy noted regarding CLIN 0011 for the Flexural Test Figure 250kN.

Answer 2: The intent is that each of the fixtures are extensions of the lower load capacity fixture and that they meet specific test requirements. This was not conveyed very well in this section. The actual requirement based on testing procedures is not 24 inches and this number should have been adjusted. To meet C1609 specimens are at max 3 in x 3 inch cross section (fiber lengths are usually not greater than 1 inch) and at least 14 inch in length. Other composite based tests may have span/depth of up to 16 or specimens that are 1 inch in depth. The requirements have been updated to reflect this.

Question 3: Does the environmental chamber require humidity control capabilities?

Answer 3: Humidity chamber is not required for this contract.